CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland June 2004.

Slides:



Advertisements
Similar presentations
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
USCMS/HCAL/TriDas. October, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland October 2003.
USCMS/Rochester. Oct 20, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCal meeting at Rochester Oct Oct 2001 Tullio Grassi, Drew Baden University of.
CMS/HCAL/TriDas. Sept, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland September 2003.
CMS ESR. May, 2004 HCAL TriDAS 1 HCAL TPG Status Tullio Grassi University of Maryland May 2004.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HCAL Group.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
UMD Jan Overview Fanout Card (in GLOBAL mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Fanout Card (in CRATE mode) Unique board for.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Clocking Drew Baden University of Maryland December 2003.
CMS/ESSC. May, 2002HCAL TriDAS1 HCAL FE/DAQ Overview Shield Wall CPUCPU DAQ RUI HPD FE MODULE DAQ DATA SLINK64 [1 Gbit/s]  18 HTRs per Readout Crate FRONT-END.
USCMS Mayl TriDAS Update Drew Baden University of Maryland USCMS HCAL.
HCAL/TriDas. November, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland November 2003.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
Boston University October 31, Technical Status and Progress Report D. Baden, T. Grassi HCAL Trigger.
1 Cost Estimate (and configuration) Drew Baden Univ. Of Maryland July 2001.
Drew Baden, UMD Nov HCAL Trigger/Readout Texas Tech Meeting February 2001 Drew Baden, Tullio Grassi University of Maryland.
HTR status Tullio Grassi Univ. of Maryland Feb 2004.
CMS June TriDAS Update Drew Baden University of Maryland USCMS HCAL.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland March 2004.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCAL Readout Status CERN Tullio Grassi, Drew Baden University of Maryland Jim Rohlf Boston University.
Drew Baden, UMD Nov HCAL Trigger/Readout CMS/Tridas November 2000 Drew Baden, Tullio Grassi University of Maryland.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
21-Jun-2005 HCAL TriDAS 1 HCAL TriDAS Status Drew Baden, University of Maryland For the HCAL Group: Boston University Fermilab Princeton University University.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
CMS Electronics Week November Electronics Issues Drew Baden University of Maryland USCMS HCAL.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland December 2003 What’s new since September 2003…
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
CMS/CERN. June, HCAL TPG and Readout CMS HCAL Readout Status CERN Drew Baden University of Maryland June 2002
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
TTCrx Issues M.Matveev Rice University December 17, 2009.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
13-Feb-2004 HCAL TriDAS 1 HCAL Tridas SLHC Drew Baden University of Maryland February 2004.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Possible SLHC Modifications to Clock Distribution Chris Tully, Dan Marlow Princeton Madison, Wisconsin February 13, 2003 Current SLB Clock Distribution.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
9/29/2016E. Hazen - oSLB1 HO Trigger Links ● oSLB produced (69 pieces) – First few tested (by me) -- seem OK – Production testing to be done by student.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
DAQ and TTC Integration For MicroTCA in CMS
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
E. Hazen - Back-End Report
Current DCC Design LED Board
CCS Hardware Test and Commissioning Plan
Update on CSC Endcap Muon Port Card
HCAL Data Concentrator Production Status
Calorimeter Trigger Synchronization in CMS,
New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister,
Geneve The Alps Where is CERN? Jura Mountains Lake Geneva 18-Sep-18
Darin Acosta University of Florida
USCMS HCAL FERU: Front End Readout Unit
Lehman 2000 Project Timeline
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
Presentation transcript:

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland June 2004

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 2 Princeton Fanout Board QPLL implemented this way allows RX_CLK to be “cleaned” at each board if needed

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 3 HCAL Fanout board Final version in operation –CERN, Maryland, FNAL, Wisconsin… –No problems – board is ready for production ECAL needs –4 + 2 spares Plus parts for 3 more HCAL needs – spares Will build that plus parts for 4 more –6 more for test stands, etc. Total: 33 boards plus parts for 7 more Time scale: –Can assemble 6 more on short time scale –Reset needs to wait for an amplifier (14 weeks) Proposal –Tell Jeremy and Chris to go ahead with production now

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 4 TTC_UMD Cards Purpose: –Carry TTCrx onto HCAL boards (HTR, DCC, Fanout) –All boards produced –Vendor put in the LEDs backwards Using students to fix it –Checkout happening now, using students, finished by end of summer

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 5 DCC Status DCCv4 boards used in TB03 –Being used now in H2 and elsewhere –Testbeam boards have the up to date v5 firmware DCCv5 – identical to v4 except for new front panel w/LEDs –LED “boards” are produced –10 new logic boards ready in Boston –Plan to have “a few” ready by May (E. Hazen) –Can provide new firmware for all existing v4s Main firmware change is in the input channel numbering Production: –Planning to build 50 DCCs in total Another 10 motherboards over what is available now) –Planning to change the 10-pin RJ45 connectors on the LRBs to match the new variety New connectors prevent inadvertent insertion of 8-pin RJ45 connectors and bending the pins

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 6 Changes to HTR for Rev4 Clocking issues –No earth-shaking changes –No evidence of any difficulties associated with HTR layout/implementation “Cosmetic” changes –Moved 2 LC’s down to giver more clearance for fibers –Removed hot swapping circuits Worry about noise, decided not to require HTR to be hot swappable –Front-panel changes –Bias resistors for all differential pair inputs (a powerup issue only…) –Change DCC 10-pin connectors Fanout input is 8-pin standard RJ45 Eliminate possibility of plugging Fanout cable into DCC connector, munging pins –Changes to VME to accommodate software (Big/Little Endian defaults) Miscellaneous changes –Fixed what was found to be wrong with Rev3 board, add test points, other minor stuff

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 7 Changes to HTR for Rev4 (cont) Changes necessary for SLB –Optimized critical clock and data lines –HTR 40MHz “LHC” clock to come from TTC TPG data and TTC broadcast need to have synchronization –Added hardware reset circuitry for TTCrx –Deal with SLB startup current –Added separate SLB JTAG chain

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 8 HTR Schematic SLB RX_CLK40 SLB RX_BC0 TTC TTCrx CLK80 Crystal Serial Optical Data Ref Clk Deserializers (8) 20 Recovered Clk TPG Path SYS40 Clk TTC Broadcast Async Fifo PLL TTC 40 Clk x2 XILINX LC Fiber Data Princeton Fanout Card (1/VME crate) SYS80 Clk

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 9 HTR TPG Testing Testing with latest SLB: –Localbus access of SLB verified easily –JTAG chain working –Link tests between SLB and Wisconsin test receiver board (STC) 1.2Gbaud copper link: verified at Maryland Data verification also passed at Maryland –Link tests at Madison in May 2004 Data sent from HTR into SLB into Wisconsin trigger receiver board Some problems found but these were limited to SLB/RCT issues –Tests underway on TPG cables Testing various cat6 quad twisted pair

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 10 SLB/Receiver Test Boards So far, used Wisconsin STC boards –Very nice for Wisconsin requirements –We need something different for commissioning and production Something more flexible and programmable for mass testing –260 HTRs, 6 SL B/HTR….can’t see plugging each one into a single STC Layout underway for an SLB/Vitesse mezzanine transition –Allows use of 6 HTR SLB sites –Run backwards into XILINX Board is now under design –Estimate another ~month in the lab for testing. HTR SLB site UW Vitesse receiver mezzanine card

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 11 HTR Production Status Production –Preparing fab and assembly contracts Will be ~$90k for each. $90k each, causes Maryland purchasing dept fits –3 Rev4’s built and verified, some small changes –6 Rev4’s at the assembler now – back this week or early next week Will verify, then send some to H2 for HO setup –Will proceed to full production after next batch of Rev4’s are verified Integration tests in Madison in May established the TPG patch electrically –Any changes will be accommodated in firmware

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 12 HTR Rev4 Status Current (Rev4) board – 3 in lab now –Testing:  Links/Clocks (same as Rev3, no problems, no mystery at UMD)  DCC path exactly same as Rev3  TPG path –Just a few layout changes needed, ready for production –Production can begin just as soon as next 6 Rev4’s checkout Expect to spend rest of CY04, but maybe sooner depending on how well it goes.

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 13 Fiber Data Links What we’ve learned about links this past year: –Dirty fibers – causes mode-dependent reflections and interference Persistent cleaning usually helps, sometimes alot –Reflection at surface of Stratos LC receiver <12dB reflected light is large – about 5% reflection We believe reflected light is again reflected by MTP connector and interfering with primary optical signal –Attenuators between LC and Stratos always cure this –VCSEL bias current can be varied by I2C to GOL Installation/commissioning – this will need to be tuned to lowest value –QPLL really helps Especially on FE card but also on HTR –HF layout tweaked, much better results reported The proof of the pudding is in the eating –H2 running no longer worries about the fiber data links!!!

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 14 H2 Fiber Link Errors (Anecdotal…) Today we are running with 81 fibers sending data to the HTRs –Took a quick 5 minute run (0.5x10 12 bits) –All fibers link up nicely and keep their links –76 show no errors (93.8 ± 2.7% error free) –2 had 2 errors, 1 had 5, 1 had 9, 1 had 156 Will investigate these this week Try more cleaning, and tweak VCSEL current to see what happens Take 10 minutes worth, see how high an error-free rate we can get

CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 15 Level 1 Latency As of this year, we were close –Within 1-2 ticks away from the budget The ball’s in Wesley’s court He has caved from his original 20m down to 10m