(c) 2002 Contemporary Engineering Economics

Slides:



Advertisements
Similar presentations
MER439- Design of Thermal Fluid Systems Engineering Economics Lecture 2- Using Factors Professor Anderson Spring 2012.
Advertisements

Chapter 4 More Interest Formulas
Nominal and Effective Interest Rates Lecture slides to accompany
Copyright © 2008 Pearson Education Canada 7-1 Chapter 7 Interest.
Engineering Economics I
Engineering Economics ENGR 3300
1 Warm-Up Review Homepage Rule of 72 Single Sum Compounding Annuities.
Chapter 3 The Time Value of Money. 2 Time Value of Money  The most important concept in finance  Used in nearly every financial decision  Business.
Chapter 5 Mathematics of Finance
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Appendix 4A The Time Value of Money.
Chapter 2 Solutions 1 TM 661Chapter 2 Solutions 1 # 9) Suppose you wanted to become a millionaire at retirement. If an annual compound interest rate of.
(c) 2002 Contemporary Engineering Economics 1 Chapter 4 Time Is Money Interest: The Cost of Money Economic Equivalence Development of Interest Formulas.
Lecture No.3.  Interest: The Cost of Money  Economic Equivalence  Interest Formulas – Single Cash Flows  Equal-Payment Series  Dealing with Gradient.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Interest Formulas (Gradient Series)
Module 3 ANNUITY Engr. Gerard Ang School of EECE.
(c) 2002 Contemporary Engineering Economics
Contemporary Engineering Economics, 4 th edition © 2007 Economic Equivalence Lecture No.5 Chapter 3 Contemporary Engineering Economics Copyright © 2006.
Interest Formulas – Equal Payment Series
Contemporary Engineering Economics, 4 th edition, ©2007 Interest Formulas for Single Cash Flows Lecture No.6 Chapter 3 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Unconventional Equivalence Calculations Lecture No. 9 Chapter 3 Contemporary Engineering Economics.
Flash Back from before break The Five Types of Cash Flows (a) Single cash flow (b) Equal (uniform) payment series (c) Linear gradient series (d) Geometric.
Lecture 2 Engineering Economics ENGR 3300 Department of Mechanical Engineering Inter American University of Puerto Rico Bayamon Campus Dr. Omar E. Meza.
Interest Formulas (Gradient Series) Lecture No.6 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
McGraw-Hill /Irwin© 2009 The McGraw-Hill Companies, Inc. TIME VALUE OF MONEY CONCEPTS Chapter 6.
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Summer Time Value of Money Session 2 07/02/2015.
PRINCIPLES OF MONEY-TIME RELATIONSHIPS. MONEY Medium of Exchange -- Means of payment for goods or services; What sellers accept and buyers pay ; Store.
CHAPTER 3 TIME VALUE OF MONEY
© 2009 Cengage Learning/South-Western The Time Value Of Money Chapter 3.
Chapter 4: The Time Value of Money
NPV and the Time Value of Money
FINANCE IN A CANADIAN SETTING Sixth Canadian Edition Lusztig, Cleary, Schwab.
Equivalence and Compound interest
Chapter 5 The Time Value of Money. Copyright ©2014 Pearson Education, Inc. All rights reserved.5-1 Learning Objectives 1.Explain the mechanics of compounding,
Interest Formulas – Equal Payment Series
Lecture No.5 Chapter 3 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition © 2010.
ISU CCEE CE 203 EEA Chap 3 Interest and Equivalence.
Irregular Payment Series and Unconventional Equivalence Calculations
Lecture No. 9 Chapter 3 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Interest Formulas for Single Cash Flows
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
CHAPTER 4 MONEY-TIME RELATIONSHIPS AND EQUIVALENCE.
ECONOMIC EQUIVALENCE Established when we are indifferent between a future payment, or a series of future payments, and a present sum of money. Considers.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Economic Equivalence Lecture No.
1 Engineering Economics.  Money has a time value because it can earn more money over time (earning power).  Money has a time value because its purchasing.
Economic Equivalence Lecture No.3 Chapter 2 Fundamentals of Engineering Economics Copyright © 2008.
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 3.
1 Equivalence Between Two Cash Flows Step 1: Determine the base period, say, year 5. Step 2: Identify the interest rate to use. Step 3: Calculate equivalence.
Contemporary Engineering Economics, 4th edition ©2007
Chapter 4: The Time Value of Money
Time Value of Money Chapter 2.
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Interest Formulas – Equal Payment Series
Unconventional Equivalence Calculations
Contemporary Engineering Economics
CHAPTER 4 THE TIME VALUE OF MONEY.
Chapter 2. Time Value of Money
Chapter 2 Time Value of Money
Interest Formulas for Single Cash Flows
Irregular Payment Series and Unconventional Equivalence Calculations
Economic Equivalence Lecture No.5 Chapter 3
Example 2.14:Powerball Lottery
Chapter 4: The Time Value of Money
UNDERSTANDING MONEY MANAGEMENT
Chapter 4: The Time Value of Money
Presentation transcript:

(c) 2002 Contemporary Engineering Economics Chapter 4 Time Is Money Interest: The Cost of Money Economic Equivalence Development of Interest Formulas Unconventional Equivalence Calculations (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Time Value of Money Money has a time value because it can earn more money over time (earning power). Time value of money is measured in terms of interest rate. Interest is the cost of money—a cost to the borrower and an earning to the lender (c) 2002 Contemporary Engineering Economics

Elements of Transactions involve Interest Initial amount of money in transactions involving debt or investments is called the principal. The interest rate measures the cost or price of money and is expressed as a percentage per period of time. A period of time, called the interest period, determines how frequently interest is calculated. A specified length of time marks the duration of the transactions and thereby establishes a certain number of interest periods. A plan for receipts or disbursements that yields a particular cash flow pattern over a specified length of time. A future amount of money results from the cumulative effects of the interest rate over a number of interest periods. (c) 2002 Contemporary Engineering Economics

Example of an Interest Transaction Repayment Plans (Table 4.1) End of Year Receipts Payments Plan 1 Plan 2 Year 0 $20,000.00 $200.00 Year 1 5,141.85 Year 2 Year 3 Year 4 Year 5 30,772.48 P = $20,000, A = $5,141.85, F = $30,772.48 (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Cash Flow Diagram Represent time by a horizontal line marked off with the number of interest periods specified. Cash flow diagrams give a convenient summary of all the important elements of a problem. (c) 2002 Contemporary Engineering Economics

Methods of Calculating Interest Simple interest: the practice of charging an interest rate only to an initial sum (principal amount). Compound interest: the practice of charging an interest rate to an initial sum and to any previously accumulated interest that has not been withdrawn. (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Simple Interest P = Principal amount i = Interest rate N = Number of interest periods Example: P = $1,000 i = 8% N = 3 years End of Year Beginning Balance Interest earned Ending Balance $1,000 1 $80 $1,080 2 $1,160 3 $1,240 (c) 2002 Contemporary Engineering Economics

Compound Interest (Example 4.1) P = Principal amount i = Interest rate N = Number of interest periods Example: P = $1,000 i = 8% N = 3 years End of Year Beginning Balance Interest earned Ending Balance $1,000 1 $80 $1,080 2 $86.40 $1,166.40 3 $93.31 $1,259.71 (c) 2002 Contemporary Engineering Economics

Comparing Simple to Compound Interest (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Economic Equivalence What do we mean by “economic equivalence?” Why do we need to establish an economic equivalence? How do we establish an economic equivalence? (c) 2002 Contemporary Engineering Economics

Economic Equivalence (EE) Economic equivalence exists between cash flows that have the same economic effect and could therefore be traded for one another. EE refers to the fact that a cash flow-whether a single payment or a series of payments-can be converted to an equivalent cash flow at any point in time. Even though the amounts and timing of the cash flows may differ, the appropriate interest rate makes them equal. (c) 2002 Contemporary Engineering Economics

Typical Repayment Plans for a Bank Loan of $20,000 Repayments Plan 1 Plan 2 Plan 3 Year 1 $5,141.85 $1,800.00 Year 2 5,141.85 1,800.00 Year 3 Year 4 Year 5 $30,772.48 21,800.00 Total of payments $25,709.25 $29,000.00 Total interest paid $5,709.25 $10,772.48 $9,000.00 (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics If you deposit P dollars today for N periods at i, you will have F dollars at the end of period N. F dollars at the end of period N is equal to a single sum P dollars now, if your earning power is measured in terms of interest rate i. N F P (c) 2002 Contemporary Engineering Economics

Equivalence Between Two Cash Flows Step 1: Determine the base period, say, year 5. Step 2: Identify the interest rate to use. Step 3: Calculate equivalence value. $3,000 $2,042 5 (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Example 4.3 Equivalence Various dollar amounts that will be economically equivalent to $3,000 in 5 years, given an interest rate of 8% (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Example 4.4 Equivalent Cash Flows are Equivalent at Any Common Point In Time (c) 2002 Contemporary Engineering Economics

The Five Types of Cash Flows Single cash flow Equal (uniform) payment series Linear gradient series Geometric gradient series Irregular payment series (c) 2002 Contemporary Engineering Economics

Single Cash Flow Formula (Example 4.7) Single payment compound amount factor (growth factor) Given: Find: F N P (c) 2002 Contemporary Engineering Economics

Single Cash Flow Formula (Example 4.8) Single payment present worth factor (discount factor) Given: Find: F N P (c) 2002 Contemporary Engineering Economics

Uneven Payment Series (example 4.11) (c) 2002 Contemporary Engineering Economics

Example 4.12 Calculating the Actual Worth of a Long-Term Contract (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Equal Payment Series A 0 1 2 3 4 5 N-1 N F P (c) 2002 Contemporary Engineering Economics

Equal Payment Series Compound Amount Factor 0 1 2 3 N A Example 4.13: Given: A = $3,000, N = 10 years, and i = 7% Find: F Solution: F = $3,000(F/A,7%,10) = $41,449.20 (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Sinking Fund Factor is an interest-bearing account into which a fixed sum is deposited each interest period; it is commonly established for the purpose of replacing fixed assets. F 0 1 2 3 N A Example 4.15: Given: F = $5,000, N = 5 years, and i = 7% Find: A Solution: A = $5,000(A/F,7%,5) = $869.50 (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Sinking fund Sinking fund: 1) A fund accumulated by periodic deposits and reserved exclusively for a specific purpose, such as retirement of a debt or replacement of a property. 2) A fund created by making periodic deposits (usually equal) at compound interest in order to accumulate a given sum at a given future time for some specific purpose. (c) 2002 Contemporary Engineering Economics

Capital Recovery Factor 1 2 3 N A Example 4.16: Given: P = $250,000, N = 6 years, and i = 8% Find: A Solution: A = $250,000(A/P,8%,6) = $54,075 (c) 2002 Contemporary Engineering Economics

Capital Recovery Factor (Annuity Factor) Annuity: 1) An amount of money payable to a recipient at regular intervals for a prescribed period of time out of a fund reserved for that purpose. 2) A series of equal payments occurring at equal periods of time. 3) Amount paid annually, including reimbursement of borrowed capital and payment of interest. Annuity factor: The function of interest rate and time that determines the amount of periodic annuity that may be paid out of a given fund. (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Equal Payment Series Present Worth Factor Present worth: The equivalent value at the present, based on time value of money. P 1 2 3 N A Example 4.18: Given: A = $32,639, N = 9 years, and i = 8% Find: P Solution: P = $32,639(P/A,8%,9) = $203,893 (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Linear Gradient Series Engineers frequently meet situations involving periodic payments that increase or decrease by a constant amount (G) from period to period. refer to book, Equation 4.17 P (c) 2002 Contemporary Engineering Economics

Gradient Series as a Composite Series (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Example 4.20 $2,000 $1,750 $1,500 $1,250 $1,000 1 2 3 4 5 How much do you have to deposit now in a savings account that earns a 12% annual interest, if you want to withdraw the annual series as shown in the figure? P =? (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Method 1: $2,000 $1,750 $1,500 $1,250 $1,000 1 2 3 4 5 $1,000(P/F, 12%, 1) = $892.86 $1,250(P/F, 12%, 2) = $996.49 $1,500(P/F, 12%, 3) = $1,067.67 $1,750(P/F, 12%, 4) = $1,112.16 $2,000(P/F, 12%, 5) = $1,134.85 $5,204.03 P =? (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Method 2: (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Geometric Gradient Series Many engineering economic problems, particularly those relating to construction costs, involve cash flows that increase over time, not by a constant amount, but rather by a constant percentage (geometric), called compound growth. (c) 2002 Contemporary Engineering Economics

Geometric Gradient: Find P, Given A1,g,i,N N = 5 years A1 = $54,440 Find: P Using equation 4.26 in the text, we obtain P=$222,283 (c) 2002 Contemporary Engineering Economics

(c) 2002 Contemporary Engineering Economics Summary Money has a time value because it can earn more money over time. Economic equivalence exists between individual cash flows and/or patterns of cash flows that have the same value. Even though the amounts and timing of the cash flows may differ, the appropriate interest rate makes them equal. The purpose of developing various interest formulas was to facilitate the economic equivalence computation. (c) 2002 Contemporary Engineering Economics