Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!

Slides:



Advertisements
Similar presentations
Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
Advertisements

Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
Paul drumm; 3rd December 2004; AFC MM 1 Why? Goal: Ultimate (CCLRC defined) Safety & Design Review –How do we get there? We need a Process –What is needed?
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
RF Cavity / Coupling Coil Module
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
May 2007DC-DC --- US ATLAS Upgrade R&D --- Garcia-Sciveres1 DC-DC converter R&D US ATLAS Upgrade UCSC May 2007.
RF Review CM37 Andrew Moss. Amplifier results at Daresbury 2MW at 35kV, good efficiency and gain.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE HPRF Up-date Tim Stanley RAL – Testing 212 kW achieved from driver stage 4616 #1 at DL, ready for endstage 116 #2. Good experience, in tuning.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
TIARA WP 7 Ionisation Cooling Test Facility (ICTF) Task 7.2 Novel Pulsed RF Power Amplifier Design.
Chris Booth Sheffield 29th March 2006
MICE RF System Power Supplies, Control and Monitoring Status report
RF Status 1 4 High Power Amplifier circuits available CERN(2)
The 9th Collaboration Meeting
Presentation transcript:

Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!

Paul Drumm 03 Mar 2004 RF Baseline Design RF Power Design driven by cost issues (no one has the funds) 2 Amplifiers from LBNL = 4 MW total 1 or 2 Amplifiers from CERN = 4 MW total (next week?) –If 1 amplifier – needs a bigger drive? Spare TH116 Tubes from ISIS Split or more amplifiers? –Hybrid device no satisfactory progress ok average but not peak power need to provide gas insulation (pk voltage > avg. voltage) –Assume that we do R&D (trials) when we have the equipment Need both cavities and one amplifier circuit Test out a hybrid circuit driving two cavities Fall back is to provide one amplifier chain per cavity

Paul Drumm 03 Mar 2004 Progress since… December LBNL –Discussed shipping equipment to RAL –Two 2MW power amplifier circuits –Three (300kW) driver circuits –4616 test stand –LBNL loan – to be written off (eventually)

Paul Drumm 03 Mar 2004 … December At LBNL –Stripping down for transport –Cleaning –Packing At RAL –Point of contact ?

Paul Drumm 03 Mar 2004 Staff… Roy Church –Used up quota of days –No Roy till April RF group at the Daresbury SRS –Mike Dykes (group leader) –Andy Moss (senior RF Engineer) –plus two more –MD & AM will be at the col’ab. mtg ASTeC

Paul Drumm 03 Mar 2004 Plan for late 2004 Limited funds –Berkeley RF system to DL –Strip down and make a technical assessment of the equipment Cost to refurbish Confirm equipment is serviceable –6 month overlap with Roy Review RF design in the light of CERN RF proposal

Paul Drumm 03 Mar 2004 For next FY Setting up a test-stand at DL –Hall and facilities available –Need to have got through GW2 i.e. be in full funding mode

Paul Drumm 03 Mar 2004 Power Amp

Paul Drumm 03 Mar Test box

Paul Drumm 03 Mar kW Driver Amplifier