(c) Copyright, Lockheed Martin Corporation, 2008 1 Looking At Schedule vs. Effort In Software Engineering, Systems Engineering and Systems John Gaffney.

Slides:



Advertisements
Similar presentations
Determining How Costs Behave
Advertisements

Design of Experiments Lecture I
Determining How Costs Behave. Introduction n How do managers know what price to charge, whether to make or buy, or other questions related to costs. n.
On Representing Uncertainty In Some COCOMO Model Family Parameters October 27, 2004 John Gaffney Fellow, Software & Systems.
Data preprocessing before classification In Kennedy et al.: “Solving data mining problems”
Responsibility Centers: Revenue and Expense centre
The Comparison of the Software Cost Estimating Methods
Determining How Costs Behave
Some Experience With COSYSMOR At Lockheed Martin
AGEC/FNR 406 LECTURE 6 An irrigated rice field in Bangladesh.
Lecture 4 MGMT © 2011 Houman Younessi Supply: Production What is the optimal level of output? How should we decide among alternative production.
1 COSYSMO 3.0: Future Research Directions Jared Fortune University of Southern California 2009 COCOMO Forum Massachusetts Institute of Technology.
Extensions of COSYSMO to Represent Reuse 21 st International Forum on COCOMO and Software Cost Modeling November 9, 2006 Ricardo ValerdiJohn Gaffney Garry.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Determining How Costs Behave Chapter 10 2/07/05.
SE 555 Software Requirements & Specification Requirements Validation.
COSYSMO Risk/Confidence Estimation Prototype John Gaffney March 14, 2005.
Ch. 21: Production and Costs Del Mar College John Daly ©2003 South-Western Publishing, A Division of Thomson Learning.
Applied Business Forecasting and Planning
1 CHAPTER M4 Cost Behavior © 2007 Pearson Custom Publishing.
Determining How Costs Behave
3 CHAPTER Cost Behavior 3-1.
Cost Behavior Analysis
Chapter 6 Production. ©2005 Pearson Education, Inc. Chapter 62 Topics to be Discussed The Technology of Production Production with One Variable Input.
This document is proprietary to Project Consulting Group, Inc. and contains confidential information which is solely the property of Project Consulting.
Chapter 6 : Software Metrics
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. 1 Part 4 Curve Fitting.
Statistics for Business and Economics 7 th Edition Chapter 11 Simple Regression Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Ch.
Learning Objective 1 Explain the two assumptions frequently used in cost-behavior estimation. Determining How Costs Behave – Chapter10.
9/17/2002 COSYSMO Usage Experience Panel: What is Happening at Lockheed Martin Garry Roedler, Lockheed Martin Engineering Process Improvement Center
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
Chapter 4 Linear Regression 1. Introduction Managerial decisions are often based on the relationship between two or more variables. For example, after.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
1. 2 Traditional Income Statement LO1: Prepare a contribution margin income statement.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
1-1 Determining How Costs Behave Dr. Hisham Madi.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
MIE Class #12 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Review Quick Review Today’s Focus: Today’s.
Chapter 6 Production. Chapter 6Slide 2 Topics to be Discussed The Technology of Production Isoquants Production with One Variable Input (Labor) Production.
1 Chapter 3 1.Quality Management, 2.Software Cost Estimation 3.Process Improvement.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
The techniques involved in systems analysis Explanation of a feasibility study:Explanation of a feasibility study: –economic, –legal, –technical, –time.
Information Technology Planning. Overview What is IT Planning Organized planning of IT infrastructure and applications portfolios done at various levels.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M18 - Version 9.01 SMU CSE 7315 Planning and Managing a Software Project.
STATISTICS 12.0 Correlation and Linear Regression “Correlation and Linear Regression -”Causal Forecasting Method.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
11/04/091 Some Topics Concerning The COSYSMOR Model/Tool John E. Gaffney, Jr Center For Process Improvement Excellence.
Defining the Marketing Research Problem and Developing an Approach
Principal Component Analysis
Overview of Addressing Risk with COSYSMO Garry Roedler & John Gaffney Lockheed Martin March 17, 2008.
11/03/091 Integrating Cost and Schedule Estimation In The COSYSMOR Model/Tool John E. Gaffney, Jr Center For Process Improvement.
CSE SW Project Management / Module 18 - Introduction to Effort Estimating Models Copyright © , Dennis J. Frailey, All Rights Reserved CSE7315M18.
1 Software Engineering Muhammad Fahad Khan Software Engineering Muhammad Fahad Khan University Of Engineering.
MODEL DIAGNOSTICS By Eni Sumarminingsih, Ssi, MM.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Information Technology Planning
Determining How Costs Behave
Project Cost Management
Production and Cost in the Firm
MANAGEMENT ACCOUNTING
Cost Estimation & Cost Behaviour
Chapter 4 Basic Estimation Techniques
Demand Estimation and Forecasting
PROJECT LIFE CYCLE AND EFFORT ESTIMATION
Determining How Costs Behave
Chapter 2: Cost Concepts and Design Economics
Constructive Cost Model
MANAGEMENT ACCOUNTING
DSS-ESTIMATING COSTS Cost estimation is the process of estimating the relationship between costs and cost driver activities. We estimate costs for three.
Retrieval Performance Evaluation - Measures
Presentation transcript:

(c) Copyright, Lockheed Martin Corporation, Looking At Schedule vs. Effort In Software Engineering, Systems Engineering and Systems John Gaffney Lockheed Martin Corporate Engineering & Technology Systems & Software Resource Center (SSRC) Center for Process Improvement Excellence (CPIE) October 28, 2008

(c) Copyright, Lockheed Martin Corporation, Focus Issues and Questions An issue of considerable importance to proposal managers, program managers, technical planners and to software engineering and systems engineering managers is how schedule compression or stretch-out affects engineering costs or overall project costs Schedule compression (or stretch-out) can be defined as the amount or percentage of reduction (increase) of a project or software or systems engineering schedule with respect to some ideal or nominal value as related to cost or productivity One difficulty is identifying whether there was compression, stretch-out, or a “normal” situation in any particular project instance Another problem is knowing what is dependent and what is independent, or do we only know associations? (relates to the fact that correlation does not mean causality) Knowing a relationship between cost (and productivity) and schedule (duration) can help us to answer such questions as: 1.“What is the optimum duration to perform this task (e.g., development of a software system)?” Here, optimum might mean with respect to minimizing cost. More generally, it might mean with respect to some utility or value function of cost and duration, in which the relative importance or utilities of the cost and schedule (duration) values are stated. In the extreme, a project might be cost driven or schedule driven. 2.“Can schedule (duration) and cost (effort) be traded off; if so, what is the tradeoff?”

(c) Copyright, Lockheed Martin Corporation, Basic Approach, Mathematical Model Structures and Considerations The basic approach considered here is to use a parametric or top- down mathematical model to represent relationships among size, S, cost (effort), K, and schedule or duration, T Note: S could be equivalent new source statements in the case of software, e.g. in the COCOMO tool or equivalent new requirements in the case of systems engineering estimation, e.g., in the COSYSMO tool Use actual project data to establish the values of the models’ parameters –Ideally, establish what projects in the data base were compressed or extended beyond a “normal” completion time Practically, there may not be data that enables this to be done as none of the projects for which data is available had compressed schedules Absent much data, use engineering judgment

(c) Copyright, Lockheed Martin Corporation, Mathematical Cost Models/Tools Structure-1 The (parametric/top-down) mathematical models considered here: –Relate three variables explicitly : S: size K: effort/cost T: schedule/duration Or K and T explicitly with S implicit –Are of two principal forms: Implicit and explicit Dependent and Independent variables Implicit: Variables not characterized as independent or dependent: R=Function (S,K,T); R is some constant This form of a cost model provides a “tradeoff space.” This form recognizes that it may be difficult to differentiate independent and dependent variables Not further discussed in this presentation Or a relation between K and T Explicit: Variables characterized as independent and dependent

(c) Copyright, Lockheed Martin Corporation, Mathematical Cost Models/Tools Structure-2 Dependent and independent variables identified: –Examples: The COCOMO/R and COSYSMO/R software and systems engineering models are of the form: K=A*S E *D; where: –D is the product of a set of cost drivers that modify a baseline productivity, A –E is a number related to whether productivity increases or decreases as S increases –K is the dependent variable –COCOMO/R: K=Func(S,T*); T* means that schedule is represented as a cost driver with several alternative cost-multiplicative values to represent the affect of schedule compression on cost (increase). There is another relationship of the form: T=a*K b that is also used; it does not explicitly represent the effect of S –COSYSMO/R : K=Funct(S); Schedule is not represented in the cost equation currently. However, Lockheed Martin is working on doing so –Example: SLIM software engineering estimation model/tool: –Form: S=A*(K p )*(T q ) –SLIM is of the form of a Cobb-Douglas Production function –The variables K and T are “factors of production” and may enable tradeoffs to be made between K and T, effort and schedule

(c) Copyright, Lockheed Martin Corporation, Cobb-Douglas Production Function The Cobb-Douglas Production Function relates an output of a process to factors of production –An example is a C-D P F that relates software source statements, S, produced by a software development process, to factors of production, such as labor, K, and time or project duration, T –General Form: O=A*(F 1 Q1 )*(F 2 Q2 )*…..*(F N QN ); O=Output; the F i are the factors of production Examples of Use of the Production Function Form –Inputs: labor and capital; output=automobiles. From this form can be derived a “productivity,” actually a “unit cost,” labor hours per automobile. Notice the indicated possible tradeoff between capital (appropriately applied in terms of training and technology) and labor; more capital  less labor to obtain the same output –Inputs: invested capital, labor; output=$ profit From this form can be derived a “productivity,” return-on-invested capital” –Inputs: invested capital, labor; output=$ sales From this form can be derived a “productivity,” “sales per employee” –Inputs: inspection time, meeting time, amount of material inspected; output= number of defects discovered. Can use as a basis for “tuning” the inspection process and for identifying opportunities for process improvement

(c) Copyright, Lockheed Martin Corporation, Some Software Engineering and Systems Engineering Examples-1 General Form: S=A*(K p )*(T q ) –This form can be converted into the form: T=a*K b or the form K=c*K d Some Actual Cases That Exemplify Different Situations That Can Be Experienced: –Case1.S=A 1 *(K )*(T ); q/p= –Case 2.S=A 2 *(K )*(T ); q/p= –Case 3.S=A 3 *(K 0.81 )*(T ); q/p= Observations Concerning These Equations: –Case 1:If q&p both >0; increasing values of K associated with decreasing values of T;T and K and can be traded off –Case 2: Low values of q/p, especially low q, mean little change in K, for a change in T, for a given value of S; effort relatively insensitive to schedule –Case 3: If either q or p is <0, means increasing values of K associated with increasing values of T; T and K can not be traded off

(c) Copyright, Lockheed Martin Corporation,

9 Some Software Engineering and Systems Engineering Examples-2 Application of these equations: –An organization might experience any one or all three behaviors: for T increasing (illustrated in the plot on the next page): 1.K decreasing, 2.K relatively flat or 3. K increasing The equations relating K and T are one- sided and might have to be fitted separately over various ranges –Always look at the data; don’t just apply/fit equations ! For small incremental changes in any one or all of the variables, e.g., ΔK/K, % change in K,: ΔS/S= (ΔA/A)+(p*(ΔK/K))+(q*(ΔT/T)); If ΔS/S= (ΔA/A)=0; Then, ΔK/K)=-(q/p)*(ΔT/T); For Case 1, a 4% reduction in schedule would result in 3.5% increase in effort. However, for Case 2, that same schedule reduction would result in only a 0.35% increase in cost/effort. For Case 3, there would be 2.7% reduction in effort

(c) Copyright, Lockheed Martin Corporation, Combined parts of Cases 1, 2 and 3 to illustrate a composite behavior that might be found for one domain/organization over a range of schedules and size values

(c) Copyright, Lockheed Martin Corporation, Some Recommendations and Questions Organizations should collect and carefully examine data for completed projects that are believed to have exhibited schedule compression as well as those that have not From this data, relationships such as described here should be developed that can be applied to the estimation of new projects or updating estimates for existent ones, e.g., to develop EAC (Estimate-At-Completion) values Absent sufficient data to develop a mathematical relationship between schedule and cost/productivity, a fall-back position can be to use expert engineering judgment/the delphi technique to establish criteria for identifying when the prospective schedule is compressed, too short, for a process being cost estimated, e.g., software engineering, systems engineering, and what the effect on the cost (effort) and productivity is expected to be under those circumstances Identify compatible/ harmonized approach to relating schedule and cost/productivity for COSYSMO/R and COCOMO/R –What do you think: Trade-off equations? Cost drivers?