Stave # 1 Metrology Eric VIGEOLAS, WG2 July the 12th 2011.

Slides:



Advertisements
Similar presentations
HOW TO MAKE A PERISCOPE MODEL?
Advertisements

Today’s Objectives: Students will be able to:
Stave#1 and Handling Frame Profile Metrology Survey Maarten, Coralie, Franck, Didier August 3 rd 2011 NB: Survey metrology done by using the UniGe Mitutoyo.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
US Bracket Support for Stave D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Lesson 2/4 Lesson Objective: To develop concept sketching skills. Be able to develop an idea to take account of CAD modelling and subsequent 3D printing.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
From Isometric Drawings to Plans and Elevations
Chapter 17 Design Analysis using Inventor Stress Analysis Module
Topic 8: Welding terms and symbols
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
Stave loading with Si-heaters at UniGe with jigs v-1 August 2011 Maarten, Coralie, Franck, Didier.
By: Alexandro Perez Greg Desrosiers Laura Berg Tara Hodgetts.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
Bridge Design Report Jeremy Hennings Matt Kilmer Tim Williams Nina Mairena.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
How to construct the draw string bag Some things you’ll need to make a bag.
1 David Santoyo Petal meeting: 24 October 2014 Petal vs Services: design concerns.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Bridge Project Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
ENTC 1110 OBLIQUE PICTORIALS.
To achieve a level 3 your work must show that: With some help you can gather information to help with designing your project You can draw suitable ideas.
Back up stave test program status Eric VIGEOLAS Pixel week December 2000 Pre production status Assembling phase comments Geometrical control Stave Qualification.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Lesson No. 07 Week No. 04 Lesson Name Hacksaw Frame & Blade.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
Introduction To CNC-Programming
Prisms & Cylinders Development with a cut surface 1 J. Byrne 2014.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Graphing motion.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Straightness measurement
Assembly Test: Elastic Averaging Jouni Huopana
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Stave production.
Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Stave Tooling & Plans for Future Stave-building (Tim)
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
Inspection of stock materials for defects
ATLAS pixel module assembly flow
Production Planning – Designing Tooling
Stave 4008 Z rubyballs coordinates
nSW Alignment Installation
Reminder of Stave250 Tooling Design
Auxiliary Views & Development
Distance & Displacement
Making a cradle using magnets that repel each other
Presentation transcript:

Stave # 1 Metrology Eric VIGEOLAS, WG2 July the 12th 2011

Foreword A tooling have been quickly manufactured to measure the stave accuracy. Then many tests have been made to control the measurements vs stave flexibility Final control made this morning shows that the stave still moving during measurements  We can not trust the preliminary values we gave especially the face plate flatness UV glue dots on 5 points to maintain the stave in its natural position

Some results (can be trusted) Some measurements was meanwhile possible (especially on the stave fixation blocs) The Fixation Hole inter axis have been mm A bare measurement of the pipe length have been done 1301 mm A refence plan have been constructed probing the two End Bloc assembly plans the flatness of the global plan composed by these two reference plan is 0.07 mm The Stave reference syst have been constructed as above without difficulties On one side the Face plate have been measured 0.021mm below the reference plan and on the other side above the reference plan Reference plan composed by probing the two extremity plans Reference axis made by joining the two reference holes The Stave origin is the middle of the two reference holes Distance Face plate ref plan = Distance Face plate ref plan =

Preliminary conclusion We were not able to complete all the measurements we wanted to do We need to built a stave jig for the MMT control more complex that this one which will permit to avoid stave distortion during probing UV Tag is a good idea but need to be more tested In order to go on in stave testing we decided to send to send the stave to UniGe for loading trial and Jig compatibility tests, and to prepare a new tool for the next stave generation MMT Control

Some results To take with caution Face plate measurements with glue dots 3 lines measured along the stave Stave move during the measurements so value have to be taken with care S shape which is not involved by the stave motion

Same measurements than previously but on a unique line Take it with caution

To take with cautions This is a Shape control based on the CAD reference shape During this measurement stave move so value can not be taken in consideration But this quind of control will be applied on the staves to control the overall accuracy with the new tool