Forecasting FX Rates Fundamental and Technical Models.

Slides:



Advertisements
Similar presentations
Chap 12-1 Statistics for Business and Economics, 6e © 2007 Pearson Education, Inc. Chapter 12 Simple Regression Statistics for Business and Economics 6.
Advertisements

Forecasting Using the Simple Linear Regression Model and Correlation
Correlation and regression Dr. Ghada Abo-Zaid
Regression Analysis Once a linear relationship is defined, the independent variable can be used to forecast the dependent variable. Y ^ = bo + bX bo is.
LECTURE 3 Introduction to Linear Regression and Correlation Analysis
Chapter 13 Multiple Regression
LOGO Time Series technical analysis via new fast estimation methods Yan Jungang A E Huang Zhaokun A U Bai Ning A E.
International Finance Chapter 5 Part 2: Forecasting Exchange Rates.
Chapter 12 Simple Regression
Chapter 12 Multiple Regression
Chapter 13 Introduction to Linear Regression and Correlation Analysis
1 Ka-fu Wong University of Hong Kong Volatility Measurement, Modeling, and Forecasting.
Fall 2006 – Fundamentals of Business Statistics 1 Chapter 13 Introduction to Linear Regression and Correlation Analysis.
Statistics for Managers Using Microsoft Excel, 5e © 2008 Prentice-Hall, Inc.Chap 13-1 Statistics for Managers Using Microsoft® Excel 5th Edition Chapter.
Gordon Stringer, UCCS1 Regression Analysis Gordon Stringer.
Linear Regression and Correlation Analysis
Forecasting & Time Series Minggu 6. Learning Objectives Understand the three categories of forecasting techniques available. Become aware of the four.
International Financial Management: INBU 4200 Fall Semester 2004 Lecture 5: Part 1 Forecasting Exchange Rates.
Chapter 13 Introduction to Linear Regression and Correlation Analysis
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 15-1 Chapter 15 Multiple Regression Model Building Basic Business Statistics 11 th Edition.
© 2000 Prentice-Hall, Inc. Chap Forecasting Using the Simple Linear Regression Model and Correlation.
Chapter 14 Introduction to Linear Regression and Correlation Analysis
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 13-1 Chapter 13 Simple Linear Regression Basic Business Statistics 10 th Edition.
Chapter 7 Forecasting with Simple Regression
Chapter 6 (cont.) Regression Estimation. Simple Linear Regression: review of least squares procedure 2.
1 Simple Linear Regression 1. review of least squares procedure 2. inference for least squares lines.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 13-1 Chapter 13 Introduction to Multiple Regression Statistics for Managers.
Statistics for Business and Economics 7 th Edition Chapter 11 Simple Regression Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Ch.
Inference for regression - Simple linear regression
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 12-1 Chapter 12 Simple Linear Regression Statistics for Managers Using.
Statistics for Business and Economics 8 th Edition Chapter 11 Simple Regression Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Ch.
1 Least squares procedure Inference for least squares lines Simple Linear Regression.
OPIM 303-Lecture #8 Jose M. Cruz Assistant Professor.
Statistics for Business and Economics 7 th Edition Chapter 11 Simple Regression Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Ch.
Chap 12-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition Chapter 12 Introduction to Linear.
EQT 373 Chapter 3 Simple Linear Regression. EQT 373 Learning Objectives In this chapter, you learn: How to use regression analysis to predict the value.
Forecasting FX Rates Fundamental and Technical Models.
Chap 14-1 Statistics for Business and Economics, 6e © 2007 Pearson Education, Inc. Chapter 14 Additional Topics in Regression Analysis Statistics for Business.
Chapter 11 Linear Regression Straight Lines, Least-Squares and More Chapter 11A Can you pick out the straight lines and find the least-square?
1 Chapter 12 Simple Linear Regression. 2 Chapter Outline  Simple Linear Regression Model  Least Squares Method  Coefficient of Determination  Model.
FX Exposure 1. Measuring Exposure. FX Risk Management  Exposure At the firm level, currency risk is called exposure. Three areas (1) Transaction exposure:
Measuring FX Exposure Economic Exposure. Economic exposure (EE): EE measures how an unexpected change in S t affect the future cash flows of the firm.
Discussion of time series and panel models
4-1 Operations Management Forecasting Chapter 4 - Part 2.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 13-1 Introduction to Regression Analysis Regression analysis is used.
Simple Linear Regression In the previous lectures, we only focus on one random variable. In many applications, we often work with a pair of variables.
Lecture 10: Correlation and Regression Model.
Applied Quantitative Analysis and Practices LECTURE#25 By Dr. Osman Sadiq Paracha.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Multiple Regression Model Building Statistics for Managers.
Copyright ©2011 Pearson Education, Inc. publishing as Prentice Hall 14-1 Chapter 14 Introduction to Multiple Regression Statistics for Managers using Microsoft.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice- Hall, Inc. Chap 14-1 Business Statistics: A Decision-Making Approach 6 th Edition.
Forecasting Parameters of a firm (input, output and products)
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc.. Chap 14-1 Chapter 14 Introduction to Multiple Regression Basic Business Statistics 10 th Edition.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 15-1 Chapter 15 Multiple Regression Model Building Basic Business Statistics 10 th Edition.
Statistics for Managers Using Microsoft® Excel 5th Edition
1 Chapter 5 : Volatility Models Similar to linear regression analysis, many time series exhibit a non-constant variance (heteroscedasticity). In a regression.
Introduction to Multiple Regression Lecture 11. The Multiple Regression Model Idea: Examine the linear relationship between 1 dependent (Y) & 2 or more.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Multiple Regression Model Building Statistics for Managers.
Module 4 Forecasting Multiple Variables from their own Histories EC 827.
Multiple Regression The equation that describes how the dependent variable y is related to the independent variables: x1, x2, xp and error term e.
Statistics for Managers Using Microsoft Excel, 5e © 2008 Prentice-Hall, Inc.Chap 14-1 Statistics for Managers Using Microsoft® Excel 5th Edition Chapter.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 12-1 Chapter 12 Simple Linear Regression Statistics for Managers Using.
Simple linear regression and correlation Regression analysis is the process of constructing a mathematical model or function that can be used to predict.
Analysis of financial data Anders Lundquist Spring 2010.
Stats Methods at IC Lecture 3: Regression.
Inference for Least Squares Lines
Correlation and Simple Linear Regression
Forecasting Plays an important role in many industries
Presentation transcript:

Forecasting FX Rates Fundamental and Technical Models

Forecasting Exchange Rates Model Needed A forecast needs a model, which specifies a function for S t : S t = f (X t ) The model can be based on - Economic Theory (say, PPP: X t = (I d,t - I f,t )  f (X t ) = I d,t - I f,t ) - Technical Analysis (say, past trends) - Statistics - Experience of forecaster - Combination of all of the above

Forecasting: Basics A forecast is an expectation –i.e., what we expect on average: E t [S t+T ]  Expectation of S t+T taken at time t. It is easier to predict changes. We will concentrate on E t [s t+T ]. Note: From E t [s t,t+1 ], we get E t [S t+T ]  E t [S t+T ] = S t x (1+E t [s t+1 ]) Based on a model for S t, we are able to generate E t [S t+T ]: S t = f (X t )  E t [S t+T ] = E t [f (X t+T )] Assumptions needed for X t+T Today, we do not know X t+T. We will make assumptions to get X t+T. Example: X t+T = h (Z t ),-Z t : data available today. => We’ll use Z t to forecast the future S t+T : E t [S t+T ] = g(Z t )

Example: What is g(Z t ) ? Suppose we are interest in forecasting USD/GBP changes using PPP: 1. Model for S t E t [s t+1 ] = s F t+1 = (S F t+1 /S t ) - 1  I d,t+1 - I f,t+1 Now, once we have s F t+1 we can forecast the level S t+1 E t [S t+1 ] = S t x [1 + s F t+1 ] = S t x [1 + (I US,t+1 - I UK,t+1 )] 2. Assumption for I t+1 => I t+1 = h(Z t ) - I US,t =  US 0 +  US 1 I US,t-1 - I UK,t =  UK 0 +  UK 1 I UK,t-1 3. E t [S t+1 ] = g(Z t ) - E t [S t+1 ] = g(I US,t-1, I UK,t-1 ) = S t x [1 +  US 0 +  US 1 I US,t-1 -  UK 0 -  UK 1 I UK,t-1 )

There are two forecasts: in-sample and out-of-sample. - In-sample: it uses sample info to forecast sample values. Not really forecasting, it can be used to evaluate the fit of a model. - Out-of-sample: it uses the sample info to forecast values outside the sample. In time series, it forecasts into the future. Two Pure Approaches to Forecasting Based on how we select the “driving” variables X t we have different forecasting approaches: - Fundamental (based on data considered fundamental). - Technical analysis (based on data that incorporates only past prices).

Fundamental Approach Economic Model We generate E t [S t+T ] = E t [f(X t+T )] = g(X t ), where X t is a dataset regarded as fundamental economic variables: - GNP growth rate, - Current Account, - Interest rates, - Inflation rates, etc. Fundamental variables: Taken from economic models (PPP, IFE, etc.)  the economic model says how the fundamental data relates to S t. That is, the economic model specifies f(X t ) -for PPP, f(X t ) = I d,t - I f,t

The economic model usually incorporates: - Statistical characteristics of the data (seasonality, etc.) - Experience of the forecaster (what info to use, lags, etc.)  Mixture of art and science.

Fundamental Forecasting: Steps (1) Selection of Model (say, PPP model) used to generate the forecasts. (2) Collection of S t, X t (for PPP: exchange rates and CPI data needed.) (3) Estimation of model, if needed (regression, other methods) (4) Generation of forecasts based on estimated model. Assumptions about X t+T may be needed. (5) Evaluation. Forecasts are evaluated. If forecasts are very bad, model must be changed.  MSE (Mean Square Error) and MAE (Mean Absolute Error) are measures used to asses forecasting models.

Fundamental Forecasting: Process Model Data Estimation Forecast Evaluation Modify/Change Model Test Model Theory Pass? Practice

Estimation Period Out-of- Sample Forecasts Validation Forecasts Fundamental Forecasting: Usual Estimation Process 1) Select a (long) part of the sample to select a model and estimate the parameters of the selected model. (You get in-sample forecasts.) 2) Keep a (short) part of the sample to check the model’s forecasting skills. This is the validation step. You can calculate true MSE or MAE 3) Forecast out-of-sample.

Example: In-sample PPP forecasting of USD/GBP PPP equation for USD/GBP changes: E t [s t+1 ] = s F t+1  I US,t+1 - I UK,t+1 => E t [S t+1 ] = S F t+1 = S t x [1+ s F t+1 ] Data: Quarterly CPI series for U.S. and U.K. from 1996:1 to 1997:3. US-CPI: 149.4, 150.2, UK-CPI: 167.4, 170.0, S 1996:1 = USD/GBP. S 1996:2 = USD/GBP. 1. Forecast S F 1996:2 I US,1996:2 = (USCPI 1996:2 /USCPI 1996:1 ) - 1 = (150.2/149.4) - 1 = I UK,1996:2 = (UKCPI 1996:2 /UKCPI 1996:1 ) - 1 = (170.0/167.4) - 1 = s F 1996:2 = I US,1996:2 - I UK,1996:2 = = S F 1996:2 = S F 1996:1 x [1 + s F 1996:2 ] = USD/GBP x [1 + ( )] = = USD/GBP.

Example (continuation): S F 1996:2 = USD/GBP. 2. Forecast evaluation (Forecast error: S F 1996:2 -S 1996:2 )  1996:2 = S F 1996:2 -S 1996:2 = – = For the whole sample: MSE: [( ) 2 + ( ) ( ) 2 ]/6 =

Note: Not a true forecasting model. Example: Out-of-sample Forecast: E t [S t+T ] Simple forecasting model: Naive forecast (E t [I t+1 ]=I t ) E t [s t+1 ] = s F t+1 = (E t [S t+1 ]/S t ) – 1  I d,t - I f,t. Using the above information we can predict S 1996:3 : 1. Forecast S F 1996:3 s F 1996:3 = I US,1996:2 - I UK,1996:2 = = S F 1996:3 = S 1996:2 x [1 + s F 1996:3 ] = x [1 + ( )] = Forecast evaluation  1996:3 = S F 1996:3 -S 1996:3 = – =

More sophisticated out-of-sample forecasts can be achieved by estimating regression models, survey data on expectations of inflation, etc. For example, consider the following regression model: I US,t =  US 0 +  US 1 I US,t-1 +  US.t. I UK,t =  UK 0 +  UK 1 I UK,t-1 +  UK,t. Suppose we estimate both equations. The estimated coefficients (a’s) are: a US 0 =.0036, a US 1 =.64, a UK 0 =.0069, and a UK 1 =.43. Therefore, I F US,1996:3 = x (.00535) = I F UK,1996:3 = x (.01553) = s F 1996:3 = I F US,1996:3 - I F UK,1996:3 = = S F 1996:3 = USD/GBP x [1 + ( )] = USD/GBP.  1996:3 = S F 1996:3 -S 1996:3 = – =

Example: Exchange Rate Forecasts US Excel Regression Results: How much variability of Y t is explained by X t t-stat tests H o : a i =0 t a1 =a 1 /SE(a 1 )= / = SUMMARY OUTPUT Regression Statistics Multiple R R Square Adjusted R Square Standard Error Observations125 ANOVA dfSSMSFSignificance F Regression E-15 Residual E-05 Total CoefficientsStandard Errort StatP-value Intercept X Variable E-15

Example (continuation): Inflation Forecasts - UK Regression Results: SUMMARY OUTPUT Regression Statistics Multiple R R Square Adjusted R Square Standard Error Observations125 ANOVA dfSSMSFSignificance F Regression E-07 Residual Total CoefficientsStandard Errort StatP-value Intercept E-06 X Variable E-07 I UK,t-1 explains 18.10% of the variability of I UK,t t-stat is significant at the 5% level (|t|>1.96) => Lagged Inflation explains current Inflation

Example: Out-of-sample Forecasting FX with an Ad-hoc Model Forecast monthly MYR/USD changes with the following model: s MYR/USD,t = a 0 + a 1 (I MYR – I USD ) t + a 2 (y MYR – y USD ) t + ε t Excel Regression Results: SUMMARY OUTPUT Regression Statistics Multiple R R Square Adjusted R Square Standard Error Observations112 ANOVA dfSSMSFSignificance F Regression Residual Total CoefficientsStandard Errort StatP-value Intercept X Variable 1 (I MYR – I USD ) t X Variable 2 (y MYR – y USD ) t X t explains 1.86% of the variability of s t t-stat tests H o : a i =0 t a1 =a 1 /SE(a 1 )= / =

Example (continuation): Out-of-sample Forecasting w/Ad-hoc Model s MYR/USD,t = a 0 + a 1 (I MYR – I USD ) t + a 2 (y MYR – y USD ) t + ε t 0. Model Evaluation Estimated coefficient: a 0 =.0069, a 1 =.2159, and a 2 = t-stats: t a1 =| |>1.96 (reject H 0 ) ; t a2 =| |<1.96 (can’t reject H 0 ) Do the signs make sense? a 1 =.2159 > 0 => PPP a 2 =.0915 > 0 => Trade Balance 1. Forecast S F t+1 E[s MYR/USD,t ] = (I MYR – I USD ) t (y MYR – y USD ) t Forecasts for next month (t+1): E t [INF t+1 ]= 3% and E t [INC t+1 ]= 2%. E t [s MYR/USD,t+1 ] = x (.03) x (.02) = The MYR is predicted to depreciate 1.52% against the USD next month.

Example (continuation): Out-of-sample Forecasting w/Ad-hoc Model 1. Forecast S F t+1 (continuation) E t [s MYR/USD,t+1 ] = Suppose S t = MYR/USD S F t+1 = USD/MYR x ( ) = USD/MYR. 2. Forecast evaluation Suppose S t+1 =  t+1 = S F t+1 -S t+1 = = ¶

Practical Issues in Fundamental Forecasting Issues: - Are we using the "right model?" - Estimation of the model. - Some explanatory variables (Z t+T ) are contemporaneous. => We also need a model to forecast the Z t+T variables. Does Forecasting Work? RW models beat structural (and other) models: Lower MSE, MAE. Richard Levich compared forecasting services to the free forward rate. He found that forecasting services may have some ability to predict direction (appreciation or depreciation). For some investors, the direction is what really matters, not the error.

Example: Two forecasts: Forward Rate and Forecasting Service (FS) F t,1-month =.7335 USD/CAD E FS,t [S,t+1-month ]=.7342 USD/CAD. (Sternin’s stragey: buy CAD forward if FS forecasts CAD appreciation.) Based on the FS forecast, Ms. Sternin decides to buy CAD forward at. (A) Suppose that the CAD appreciates to.7390 USD/CAD. MAE FS = =.0052 USD/CAD. Sternin makes a profit of =.055 USD/CAD. (B) Suppose that the CAD depreciates to.7315 USD/CAD. MAE FS =   =.0027 USD/CAD. (smaller!) Sternin takes a loss of = USD/CAD. ¶

Technical Analysis Approach Based on a small set of the available data: past price information. TA looks for the repetition of specific price patterns.  Discovering these patterns is an art, not a science. TA attempts to generate signals: trends and turning points. Popular models: - Moving Averages (MA) - Filters - Momentum indicators.

(1) MA models The goal of MA models is to smooth the erratic daily swings of FX to signal major trends. The double MA system uses two MA: Long-run MA and Short-run MA. LRMA will always lag a SRMA (gives smaller weights to recent S t ). Buy FC signal: When SRMA crosses LRMA from below. Sell FC signal: When SRMA crosses LRMA from above. Buy FC signal

Example: S t (USD/GBP) Double MA (red=30 days; green=150 days)

(2) Filter models The filter, X, is a percentage that helps a trader forecasts a trend. Buy signal: when S t rises X% above its most recent trough. Sell signal: when S t falls X% below the previous peak. Idea: When S t reaches a peak  Sell FC When S t reaches a trough  Buy FC. Key: Identifying the peak or trough. We use the filter to do it: When S t moves X% above (below) its most recent peak (trough), we have a trading signal.

Example: X = 1%, S t (CHF/USD) Peak = CHF/USD (X = CHF.01486)  When S t crosses CHF/USD, Sell USD Trough = CHF/USD (X = CHF.01349)  When S t crosses CHF/USD, Buy USD

Example: X = 1%, S t (CHF/USD) Peak = CHF/USD (X = CHF.01486)  When S t crosses CHF/USD, Sell USD Sell USD signal Peak = CHF/USD

(3) Momentum models They determine the strength of an asset by examining the change in velocity of asset prices’ movements. We are looking at the second derivative (a change in the slope). Buy signal: When S t climbs at increasing speed. Sell signal: When S t decreases at increasing speed. (USD/GBP) time StSt Buy GBP signal

TA Summary: TA models monitor the derivative (slope) of a time series graph. Signals are generated when the slope varies significantly. Technical Approach: Evidence RW model: seems to be a very good forecasting model. Many economists have a negative view of TA:  TA runs against market efficiency (see RC). Informal empirical evidence for TA: The marketplace is full of newsletters and consultants selling technical analysis forecasts and predictions. Some academic support: Bilson points out that linear comparisons -i.e., based on correlations- are meaningless, since TA rely on non-linearities. Bilson, based on non-linear models, finds weak support for TA.

Exchange Rate Volatility Many agents are interested in forecasting the variance of returns. Models where variance is important:CAPM Black-Scholes Value-at-Risk (VaR) The assumption of a constant variance is called homoscedasticity. Variances of asset returns, however, tend to be time-varying:  returns of financial assets are heteroscedastic. S t is quite volatile in some periods, while during other periods S t does not move very much. Robert Engle won a Nobel Prize modeling volatility.

Autoregressive Conditional Heteroscedasticity (ARCH) Engle introduced the ARCH(q) model: σ 2 t = α 0 + Σ i q α i e 2 t-i. The variance at time t depends on past conditional errors. Engle's model incorporates two empirical facts observed in returns: (1)large (small) changes in returns are likely to be followed by large (small) changes in returns. When e t-1 is big,  σ 2 t tends to be big. (volatility clustering). (2) The unconditional distribution of financial assets' returns has thicker (fatter) tails than the normal distribution. Example: Volatility clustering and fat tails is observed in time series plots and histograms of the USD/GBP. ¶

The GARCH(q,p) model: σ 2 t = α 0 + Σ i q α i e 2 t-i + Σ i p ß i σ 2 t-i. The variance at time t depends on past errors and past variances. A variance has to be positive, we need to impose restrictions: α 0  0, α i  0 (i=1,...,q), and ß i  0 (i=1,...,p) After some algebra, we get the unconditional (or average) variance, σ 2 : σ 2 = α 0 /(1 - Σ i q α i - Σ i p ß i ). For the unconditional variance to be well defined, we need: Σ i q α i + Σ i p ß i < 1. GARCH models have been successfully employed for exchange rates. Empirical regularity: A GARCH(1,1) model tends to work well: σ 2 t = α 0 + α 1 e 2 t-1 + ß 1 σ 2 t-1.  σ 2 is well defined when λ=α 1 +ß 1 <1.

GARCH models are usually estimated using a method called maximum likelihood (ML). Once the parameters α i 's and ß i 's are estimated, equation (V.4) can be used to forecast the next-period variance. Example: Sietes Swiss uses an AR(1)-GARCH(1,1) for S t - USD/CHF: s t = [log(S t ) - log(S t-1 )]x100 = a 0 + a 1 s t-1 + e Ft,e t  Ψ t-1 ~ N(0,σ 2 t ). σ 2 t = α 0 + α 1 e 2 t-1 + ß 1 σ 2 t-1. Sample size: 1548 observations (January 6, January 30, 2010). The estimated model for s t is given by: s t = s t-1, (1.10)(1.78) σ 2 t = e 2 t σ 2 t-1. (2.19)(4.16)(25.95) Note: λ=.955 < 1.

The model estimates: e 1548 = σ = Now, Sietes Swiss forecasts σ : σ = (-0.551) (2.554) = ¶

Multiperiod variance forecasts using a GARCH(1,1) model: E t [σ 2 t+k ]=(α 1 + ß 1 ) k [σ 2 t - α 0 /(1-α 1 -ß 1 )]+ α 0 /(1-α 1 -ß 1 ) =λ k [σ 2 t - σ 2 ] + σ 2 If λ=(α 1 +ß 1 )<1, as k , λ k  0.  as we go more into the future, the forecasts converges to σ 2. Note: λ represents the rate of convergence (decay) of σ 2 t towards σ 2. Example: We estimate a GARCH(1,1) model using 300 daily observation for the GBP/USD exchange rate. We obtain these estimates: α 0 =.175, α 1 =.123, ß 1 =.847, and σ = We want to forecast the variance 10 days from now. The unconditional variance is σ 2 =.175/( ) = The 10-day-ahead variance forecast is: E 300 [σ ] = (.97) 10 [ ] =  the volatility forecast 10 days ahead is σ 310 = 1.725%. ¶

J.P. Morgan's RiskMetrics Approach In October 1994, J.P. Morgan unveiled its risk management software. RiskMetrics is a method that estimates the market risk of a portfolio, using the Value-at-Risk (VAR) approach. RiskMetrics uses a simple specification to model σ 2 t : σ 2 t = (1-γ) e 2 t-1 + γ σ 2 t-1.  next period's variance is a weighted average of this period's squared forecast error and this period's variance. RiskMetrics approach involves an IGARCH model:α 0 =0 γ = (1-α 1 ) = ß 1. J.P. Morgan set:γ=.94, for daily data. γ=.97, for monthly volatility. Given the large number of series that J.P. Morgan uses (more than 500), RiskMetrics uses the same γ for all the series.

Example: Suppose we estimate a time-varying variance with the RiskMetrics model using 300 daily observations for GBP/USD. Estimates σ = and e 300 = Forecast for the variance tomorrow: E 300 [σ ] = (.94) (.633) 2 = That is, the volatility forecast for tomorrow is E 300 [σ 301 ] = 1.366%. ¶