GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
1 Background: Use of TKR Trigger One-Shots individual TKR strip channels “true” when analog shaped pulse is above threshold. strips in a plane are OR’d.
Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa.
GLAST LAT Project Instrument Analysis Workshop 6 – 06/02/27 F. Piron & E. Nuss (LPTA) 1 Trending CAL performance and mapping crystals Gamma-ray Large Area.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
IA meeting, Feb. 3, 2006 Mutsumi Sugizaki TKR Noise Stdudy 1 LAT TKR Noise Study Current Status Mutusmi Sugizaki (and short comment about TOT=255 event)
9/23/2005 Inst. Ana. MeetingTKR trigger efficiency with ACD&CAL 1 Study of TKR trigger efficiency with ACD and CAL Mutsumi Sugizaki, Hiro Tajima SLAC.
GLAST LAT Project Instrument Analysis Meeting– Dec 9, 2005 Takuya Kawamoto, TKR Noisy Strip determination 1 Noisy Strip determination Takuya Kawamoto (Hiroshima.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
Identifying anomalous strips David Stuart, Noah Rubinstein University of California, Santa Barbara June 18,
TriggerLatchingEffLAT_ ppt1 Status report of overall Trigger and Latching Efficiencies study Instrument Analysis meeting, May 13, 2005 Tsunefumi.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
10/21/2005 Inst Ana Meeting TKR Noise Flares1 TKR Noise Flares observed in TKR #11 and #8 Mutsumi Sugizaki, Hiro Tajima, and TKR team.
Method Comparison A method comparison is done when: A lab is considering performing an assay they have not performed previously or Performing an assay.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST Calorimeter Crystal Position Measurement Zach Fewtrell, NRL/Praxis GLAST Integration & Test Workshop SLAC July 14, 2005.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 9 of 12 LAT Test Results 1 GLAST Large Area Telescope LAT Pre-Shipment Review LAT.
GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
, Dan Peterson Apparent inconsistencies and other issues in the xBSM measurements of IBS Scans We have studied the pinhole and CodedAperture.
L1Calo EM Efficiencies Hardeep Bansil University of Birmingham L1Calo Joint Meeting, Stockholm 29/06/2011.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
STAR SVT Self Alignment V. Perevoztchikov Brookhaven National Laboratory,USA.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
Analysis of IMS Data By Ed Sittler CAPS Team Meeting #28 Marseille, France July 26-28, 2004.
Manqi Ruan Discussing & Support: Roman, Francois, Vincent, Supervisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua)) DQ Check for CERN Test.
L1Calo EM Efficiency Maps Hardeep Bansil University of Birmingham L1Calo Weekly Meeting 07/03/2011.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Mini-Tower test results
GLAST LAT tracker signal simulation and trigger timing study
Investigation on tray MID 063 Back
Noise analysis of the 1m3 DHCal test beam
Scott D. Metzler California Institute of Technology
(2001) Data Filtering: UPDATE
GLAST Large Area Telescope:
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
EMCal Recalibration Check
EMCal Recalibration Check
Overview Goal Study GEM variables in SVAC ntuple
Mini Tower Preliminary Results
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope:
Studies of the Time over Threshold
RPC approved plots.
Analysis of GLAST Balloon Experiment Data
Presentation transcript:

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending Hiro Tajima (SLAC) TKR Gamma-ray Large Area Space Telescope

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 2 Efficiency Trending IA Workshop Consistent downward trend observed. –Inconsistent with stable bad strips. –Probably due to LAT configuration change. Efficiency values depend on track quality and other factors. Further improvement on track selections required to make it more stable.

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 3 Improvement on Efficiency Calculation Use only towers with 6 or more hit layers. –Much improved. Still more scatter than the statistical error. FMA: lower efficiencies in 16-tower and first LICOS muon data. FM4: lower efficiencies in PSR muon data. –Systematically lower efficiency at NRL. So is trigger rate. (~500 ⇒ ~420

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 4 FM4 (Bay 13) Layer Efficiencies Layer X13 (plane# 26) shows significant efficiency drop. + LICOS runs + PSR runs Layer ID Efficiency

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 5 FM4 X13 Strip-Level Efficiencies This is not exact strip efficiency due to accuracy of track extrapolation. –It gives crude association of efficiency with strip#. –Efficiency of strips degraded significantly. –This region had lower efficiencies in previous runs. Strip ID Efficiency

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 6 SSD Wafer Dependence? Occupancy does not depend on SSD wafer in the ladder. Efficiency loss is well correlated with GTFE boundaries. Strip ID Occupancy (arbitrary unit) Strip ID GTFE boundaries Ladders GTFE Wafer 0 Wafer 3 Wafer 2 Wafer 1 – Wafer 0 – Wafer 1 – Wafer 2 – Wafer 3

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 7 New hot strip around 1141, 1143 (close to edge of the SSD)! –1142 was masked in previous runs. –Hot strips is due to large leak current from junction break down. Mechanism for efficiency loss in two GTFEs is not understood. New hot strip schema files released to mask these hot strips. –Mainly to reduce trigger occupancy. –It may not fix the efficiency loss since we had some efficiency loss even when these strips were quite. Root Cause of Efficiency Loss LICOS runs PSR runs Strip ID Occupancy (arbitrary unit) Strip ID , 1143 Sugizaki

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 8 FMA (Bay 0) Layer Efficiencies Slight efficiency loss in Y0, Y3, Y4. + LICOS runs + PSR runs Layer ID Efficiency

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 9 FMA Y3, Y4 Strip-Level Efficiencies No localized significant efficiency loss observed. –Some intermittent strips in green circles could be a cause. disconnected strips ladder disconnected strips ladder disconnected strips and healthy strips are mixed and averaged out.

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 10 Automated Layer Efficiency Trending Tower efficiency is not very sensitive to local efficiency loss. –Useful for overall efficiency trending. Layer efficiency is more sensitive for local efficiency loss. –Too many layers to be trended by human eyes. –Automated outlier detection script developed. Take out systematic effects that affect all layers in each tower. Take truncated (remove highest and lowest 10% of efficiencies) and weighted average of all runs for each layer. Tag instances of efficiencies if it is 5  away from the above average. Produce efficiency strip profile plots of outliers in comparison with the reference and save them as GIF for human inspection.

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 11 FMA (Bay 0) Layer X0, X2 X0 and X2 do not have bad channels in these regions. –Shadow of bad strips in X1 ( ). –Inefficient regions are slightly shifted. –Old efficiency calculation is more susceptible. Old efficiency calculation X1 bad channel region run ID ( ) Relative efficiency Efficiency strip ID Efficiency

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 12 FM6 (Bay 12) Layer Y5 Noise flare according to Mutsumi. run ID ( ) Relative efficiency Efficiency strip ID Sugizaki

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 13 FM13 (Bay 7) Layer X15 Another noise flare –Only 1st ladder is affected. –GTRC buffer limit is not cause of inefficiency. –Probably due to dead time of preamplifier. run ID ( ) Relative efficiency Efficiency strip ID Sugizaki

GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 14 FM14 (Bay 2) Layer Y0 No noisy strip found. Need further investigation. run ID ( ) Relative efficiency # of hits per strip strip ID Efficiency strip ID