1-1 Work Zone Roles and Responsibilities. 1-2 Module Objectives  Recognize the roles of LEOs and others in work zones  List LEO responsibilities and.

Slides:



Advertisements
Similar presentations
3-1 Recommended Practices. 3-2 Module Objectives Summarize safe operating practices for LEOs working in WZ.
Advertisements

Review of the Incident Command System
0-1 Welcome!! Safe and Effective Use of Law Enforcement Personnel in Work Zones Welcome!! Safe and Effective Use of Law Enforcement Personnel in Work Zones.
Site Safety Plans PFN ME 35B.
Roles and Responsibilities. A good ITCP program may involve a number of key people: Safety Professional Inspectors/Quality Control Superintendent/ Project.
Course Material Overview of Process Safety Compliance with Standards
Health and Safety Committees RENZO BERTOLINI Canadian Centre for Occupational Health and Safety.
Patrol Basics. Lesson Goals – Know assigned patrol area – Know the different methods of patrol – Know how to prepare a BOLO (Be On The Look Out )
Road Safety & Awareness Training Your “Right to Know” 29 CFR 1926 / DOT MUTCD This material was produced under grant number SH22297-SH1 from OSHA. It does.
Escape Procedures Nevada Department of Corrections – Training Division.
@TxSchoolSafety Continuity of Operations Planning Workshop Devolution & Reconstitution.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
Contractor Safety Management
Safety for Workers on Foot. Safe Practices  Consider worker behavior when developing the ITCP. Determine locations where workers are likely to go.
Preventing Runovers and Backovers
Welcome! 1 Safe Harbor - Safe Schools, LLC - all rights reserved 2012.
New Jersey Crossing Guard Training Part 2. TYPES OF INTERSECTIONS Unsignalized Intersections Unsignalized Midblock Crosswalk Signalized Intersections.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Tennessee Baptist Site Security Training Course 4 Copyright Permission obtained from original author Gerald T. Aitken of Maybrook NY
I-295 / I-76 / NJ 42 Incident Management Task Force in New Jersey
Contractor Management and ISO 14001:2004
Safety and Health Programs
0-1 Safe and Effective Use of Connecticut Law Enforcement Personnel in Work Zones Safe and Effective Use of Connecticut Law Enforcement Personnel in Work.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Final Exam Module Closed Captioning Please click on the green arrow to proceed to the final exam.
PERMIT REQUIRED CONFINED SPACES PERMIT REQUIRED CONFINED SPACES.
Safety and Health Programs
Guidelines for Traffic Control at Surface Mines
Network security policy: best practices
HAZWOPER Overview.
Preventing Runovers and Backovers
Work Zone Safety Awareness. What is a Work Zone?  Work Zone is a term applied specifically to highway and road construction sites involving federal government.
Rapid Assessment A quick evaluation of a disaster/emergency impacted area.
Highway Incident Safety For Emergency Responders
Firefighter III Introduction Mod A Identify the Firefighter III’s role as a member of the organization. (4-2.1) The role of a firefighter III.
Incident Reporting Procedure
Old Policy – which no one ever seem to have heard of.
The driver of a vehicle is responsible for the vehicle assigned to him/her. Follow these regulations when operating a vehicle on company business: Operate.
1-1 Roles and Responsibilities. 1-2 Module Objectives  Recognize the roles of LEOs and others in work zones  List LEO responsibilities and expectations.
MODULE 2 ROLES AND PROCEDURES
TPR I MICHAEL A. NEALS #4213 INSTRUCTOR. Work Zone Safety Work Zone Safety History NJ DOT Response NJSP Construction Unit Dedicated Unit Advantages Unit.
Safety and Health Programs 1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale and productivity.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Overview of the Work Zone Safety and Mobility Rule Module 1.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Office of Railroad, Pipeline & Hazardous Materials Investigations Right-of-Way Procedures & Safety Rules Compliance.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Hazards Identification and Risk Assessment
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Ambulance Operations. Emergency Vehicle Laws The driver of an authorized emergency vehicle may: Park or stand irrespective of the provisions of this chapter;
Understanding Work Zones
OSHA Guidelines for Employers to Reduce Motor Vehicle Crashes
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
1 Crisis Management and Communication Dr. Joy Smith and Ms. Robin Denny.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
M. Kimble. Safety Info. Safety and security specialists supervise and manage programs designed to provide for the safety and security of students, staff.
OHSAS Occupational health and safety management system.
V9 Vehicle Manoeuvering. Fleet Operator Recognition Scheme (FORS) FORS is important to our company because.
04-25 Right to Know Right to Know  General  The purpose of this guideline is to insure that the Brunswick Fire Company No. 1 provides a safe.
Introduction to the Emergency Operations Center City of Santa Cruz 2011 EOC Training and Exercise.
Emergency Response For the Hazardous Waste Worker.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.

Policies Controlling Risk
20 Principles for Managing Behavioural Safety & Process Safety
SAFE 101 NSC Chapter 22.
Union College Utility Cart Safety Program
Presentation transcript:

1-1 Work Zone Roles and Responsibilities

1-2 Module Objectives  Recognize the roles of LEOs and others in work zones  List LEO responsibilities and expectations in work zones  Discuss communication channels among all involved and the importance of good communication

1-3 Decision-Makers  Set procedures for how their LEOs may be used  Implement policies  Be active and engaged – even if contractor is mainly responsible for hiring LEOs  Our State: City of New Haven Work Zone Permit & Safety Enforcement / Inspection

1-4 Discussion  Does your jurisdiction have a defined process for using officers in work zones?  How is coordination achieved?  How would you evaluate your current practice?  Is the process working as well as it could be?

1-5 Typical WZ Stakeholders 1. State/Local Highway Agency 2. Contractor 3. Contractor’s Point of Contact 4. Traffic control technicians

Highway Controlling Agency  May be:  State DOT  Public Works Department  Other local agency  Responsible for the overall project, including enforcement of the TCP  The “final authority”  May contract-out these responsibilities Approves a Traffic Control Plan (TCP) for the project

Highway Controlling Agency (cont.)  May allocate enforcement resources  May provide WZ inspection services and liaison with LEOs  Builds the TCP which includes:  Pattern of TCPs  Tasks to be performed  Project phasing

Highway Controlling Agency (cont.)  TCP may include location/placement of police officers / flaggers based upon:  WZ type  Location  Duration  Time of day  Safety

Contractors  Build and maintain project  May provide own inspection services and liaison to LEO  Responsible for ensuring the traffic control plan is correct on a daily basis  May be responsible for directly hiring and paying LEOs  Assumes officers are trained!! Implements the Traffic Control Plan based on the MUTCD and local standards

1-10 Contractors….  Do not have the authority to place officers contrary to established procedures and/or endanger the police officer Request a briefing from the contractor, DOT, or traffic agency representative!

1-11 Contractors….  Should provide a daily work zone briefing to police officers prior to the beginning of each shift or special enforcement activity. If they don’t seek you out, you find them. Know what, how, where and when you are expected to perform a duty. The officer you are relieving is another good source of work zone information, but not your only one!

Contractor’s Point of Contact (POC)  Represents the Contractor at the site  In charge of project on site  May be called the “Work Zone” (WZS) or “Traffic Control Supervisor” (TCS)  Certification or training in WZ  The TCS is responsible for inspection and documentation of the installation, operation and removal of the work zone  A Highway Controlling Agency Inspector may also be a POC – be sure of your communication channels Know your primary contact in the field!

Traffic Control Technicians  Report to the WZS / TCS  Are the WZ Workers  Are a good technical source on TCP issues  Should have some WZ training, at least hazard recognition  LEOs should help them understand and support role of LEOs in WZ

Law Enforcement Officers  Should:  Be trained in basic work zone operations and safety  Obtain names & numbers of contractors’ and their on site POC  Attempt to make daily contact with Contractor’s on site POC and/or Highway Controlling Agency POC/Inspector  Law Enforcement Agencies expected to enforce or work in work zones should attend the project’s pre-construction conferences.

1-15 The “Pre-construction Conference”  A meeting where everyone involved with the project discusses:  Roles and responsibilities  Construction details  Procedures/schedules are discussed  Decisions are made  Questions are answered Law Enforcement Agency representatives should attend and take information back to others!

Law Enforcement Officers  Anyone working in close proximity to traffic is in danger! Watch your back!!  Your activities will affect everyone’s safety!  Your badge does not protect you from traffic impacts!

1-17 Main Types of Police Services in WZ a)Presence b)Traffic Control c)Enforcement d)Emergency Traffic Control

1-18 LEO Work Zone Services: a) Presence  Deterrent to speeding and aggressive driving  Gains attention of drivers for compliance with traffic control devices  Creates opportunity for warning workers of safety issues and impending danger from oncoming traffic Most common LEO activity in WZ!

1-19 Presence Issues  Work zone areas may cross jurisdictional boundaries and cause coverage issues  Longer queuing and higher traffic impacts  Multi-agency traffic teams are an option. E.g. I-95 Q-Bridge Expansion, LEO Agencies: State PD, New Haven PD, East Haven PD  Use of State Police is another option for presence officers to reduce jurisdictional issues Your Agency should have a process or policy!

1-20 LEO Work Zone Services: b) Traffic Control Some operations may require traffic control: To move vehicles or equipment in, out or through the work zone. To address limited lane use MUTCD or Highway Agency required flagging operations Intersections * Detour/diversion situations * To direct traffic & keep it moving * *These may be in line with normal duty for a police officer depending on Agency policies.

1-21 LEO Work Zone Services: c) Enforcement  LEOs assigned to presence work - should not enforce traffic laws.  Active enforcement of traffic laws through the WZ by separate local LEOs may be combined with presence LEOs  Are not as common as presence LEOs WZ should be enforced as strictly as school zones!

1-22 LEO Work Zone Services: d) Emergency Traffic Control  Not within the scope of this program  Emergency traffic control is a type of temporary traffic control  Chapter 6I of MUTCD discusses Control of Traffic Incident Management Areas (emergency road user occurrences, natural disasters or unplanned events.)

Stay in communication 2.Be 3.Be alert 4.Drive-through What to do When Working in a Work Zone 5.Investigate crashes? Agency policy. 6.Arrive early/leave late 7.Monitor TCP compliance? Let’s discuss in more detail! VISIBLE

Stay in Communication  Contact Agency for clarification and directions  Report to the WZ POC at beginning of shift  Remain in radio contact with the local dispatch  Maintain radio or visual contact with other presence LEOs or flaggers to coordinate work zone traffic control as necessary

1-25 What to discuss with the Point of Contact (POC)  Project objective and schedule for your shift  Contact information  Your location: moving or stationary?  Express concerns about your or others’ safety, if any  Be friendly!  Identify enforcement areas if applicable.

1-26 Your visibility could be critical! 2. Be Visible  Patrol car emergency lights ON  If outside the patrol vehicle and within the work zone, YOU MUST wear issued retroreflective safety clothing

Being Visible University of Michigan Transportation Research Institute Study Seen at 891’ ANSI Class II 125’ Normal Driver reaction time 1.5 sec. Braking Deceleration 0.5g Stopped 159’ for 35 MPH 425’ for 65 MPH Too late!

1-28 Where is the safest place to be for PRESENCE?  Identify the safest and most efficient location, that is in compliance with procedures  Will discuss in next module

1-29  Stay alert at all times! 3. Be alert Face Traffic P D Don’t Watch work

1-30  In both directions. See what the drivers will see.  To become familiar with the work zone and its activities  To identify hazardous, confusing, or unsafe conditions  To determine safe places for other non- presence LEOs to investigate crashes and for enforcement action to take place. 4. Drive-Through

1-31  Investigate minor property damage or minor crashes that occur within the WZ if the time required to complete the investigation is minimal and IF your agency policy permits such actions. 5. Investigate Crashes - Property Damage? Crashes involving injury shall be investigated by appropriate personnel, not the WZ “presence” officer. Initial involvement should be guided by agency policy. Determine local property damage (PDO) policies ahead of time!

Arrive early/leave late  For best worker, driver, pedestrian and self-protection, when possible, be present when the traffic control devices are being installed or removed.  But even better -

1-33 The 15 Minute Rule …….  Arrive 15 minutes before traffic control devices are being placed according to TCP, moved or taken down by Contractor  Stay 15 minutes after changes have taken place, to observe traffic to ensure any new traffic control plan change is working properly Discuss with POC

1-34  Does your Highway Agency or jurisdiction inspect TCP compliance?  Check TCP through field inspections?  Detect safety violations and require immediate correction by contractors?  Do Inspectors notify supervisor of problems and record violations for further action?  Allow formal/informal changes of TCP to address traffic/safety concerns? 7. Inspect TCP Compliance? LEOs are usually not responsible for TCP inspection, but should know their TCP and can be extremely valuable in identifying potential problems. NJ State Police has a program….

NJ Safety Intervention Results: July 1, November 30, Total Interventions 11,544 Employees Removed From Risk 3387 OSHA Violations Corrected 4008 DOT Violations Corrected 247 Different Contractors Impacted

1-36 The City of New Haven Work Zone Inspection Program  Work Zones by permit or emergency work only.  WZ / Sidewalk Obstruction Permits approved by Police Chief and Director of Public Works  TCPs designed and approved by New Haven Traffic and Parking engineers.  Daily inspections of WZ compliance with TCPs by WZ trained personnel.  Contractors may be immediately shut down for no permit, violation of terms or non- compliance with TCP.  Multiple violations can result in contractor being prohibited from performing permit work in New Haven by proposed Ordinance. New Haven LEOs are being trained on the duties, hazards, TCPs and requirements of WZs.

1-37 DISCUSSION  How do you feel about requiring training for officers before they work in or around traffic work zones?

1-38 Module Recap  What are the traditional roles of LEOs in work zones?  Who else is involved with work zones?  What specific activities are typical of LEOs in work zones?  What is the “15-Minute Rule”?  Do you know your POC?  Do policies related to emergency response exist?