Accountability 101. State Accountability Federal Accountability # Students Met Standard # Students Tested If the Standard is not met: Apply Required.

Slides:



Advertisements
Similar presentations
Federal Accountability Adequate Yearly Progress. TEA-USDE Flexibility Agreement
Advertisements

TETN Accountability Update Session June 18, 2009.
Accountabil ity System Student Achievement Index I Student Progress Index 2 Closing Performanc e Gaps Index 3 Postsecondary Readiness Index 4 Overview.
OGISD Board of Trustees September 19, 2011 Orange Grove Elementary Accountability Report.
Miami ISD Texas Academic Performance Report (TAPR)
School Accountability Ratings What Are Our District’s Accountability Ratings? What do they mean?
Elementary/Secondary Education Act (1965) “No Child Left Behind” (2002) Adequacy Committee February 6,2008.
Data Analysis State Accountability. Data Analysis (What) Needs Assessment (Why ) Improvement Plan (How) Implement and Monitor.
1 Accountability System Overview of the Accountability Rating System for Texas Public Schools and Districts.
Accountability preview Major Mindshift Out with the Old – In with the New TEPSA - May 2013 (Part 2) Ervin Knezek John Fessenden
2013 State Accountability System Allen ISD. State Accountability under TAKS program:  Four Ratings: Exemplary, Recognized, Academically Acceptable, Academically.
Adequate Yearly Progress 2012 Comfort ISD. Measures Evaluated Reading/ELA – Percent of students (Grades 3-8 and 10) who are Proficient in Reading/ELA.
District Accountability Update May February 2007.
1 Prepared by: Research Services and Student Assessment & School Performance School Accountability in Florida: Grading Schools and Measuring Adequate Yearly.
Academic Excellence Indicator System (AEIS) Report Presented to ACISD Board of Trustees 12/15/2011 ARANSAS COUNTY ISD – A TEA RECOGNIZED SCHOOL.
Vertical Scale Scores.
Accountability State and Federal Ratings August 11, 2009 Board Presentation 1.
State Accountability and Federal Adequate Yearly Progress.
RECOGNIZED 2009 Accountability Rating. Basic Indicators EXEMPLARY: for every subject, at least 90% of the tested students pass the test RECOGNIZED**:
Arizona’s Federal Accountability System 2011 David McNeil Director of Assessment, Accountability and Research.
District Assessment & Accountability Data Board of Education Report September 6, 2011 Marsha A. Brown, Director III – Student Services State Testing and.
SCHOOL ACCOUNTABILITY REPORT ALBUQUERQUE PUBLIC SCHOOLS RESEARCH, DEVELOPMENT AND ACCOUNTABILITY DEPARTMENT.
ACCOUNTABILITY UPDATE State and Federal Systems TSNAP Not-So-New Coordinator’s Academy September 24, 2008 Sandra Poth, Northside ISD.
Know the Rules Nancy E. Brito, NBCT, Accountability Specialist Department of Educational Data Warehouse, Accountability, and School Improvement
AYP vs. AEIS Talking Carroll Elementary October 5, 2010.
State & AYP Accountability Ratings Highlights District Ratings by Rating Category (including Charter Operators) ACCOUNTABILITY RATING 2009 CountPercent.
2013 Accountability System Design Assessment & Accountability, Plano ISD.
1 Accountability System Overview of the PROPOSED Accountability Rating System for Texas Public Schools and Districts.
Texas Public School Accountability Presented at Midwinter by the Texas Education Agency.
Ysleta Independent School District 2004 Accountability State and AYP.
Public Hearing & Presentation of MISD Annual Accountability Report 2009 MILLSAP ISD Prepared by Lois Johnson in compliance with Texas Education Code
Texas Projection Measure. What is TPM? TPM is a method for… – projecting future student scores -OR- – determining whether a student is likely to pass.
What are the STAAR Performance Standards? Copyright 2013 by Region 7 Education Service Center. All rights reserved.
10/19/2015 Academic Excellence Indicator System Woden ISD.
Academic Excellence Indicator System (AEIS) Report January 20, 2009 Dr. Joan Bowman Assistant Superintendent Sheldon ISD.
Helping EMIS Coordinators prepare for the Local Report Card (LRC) Theresa Reid, EMIS Coordinator HCCA May 2004.
Understanding the Texas Accountability System. – 1979 Texas Assessment of Basic Skills (TABS) – 1985 Texas Educational Assessment of Minimum Skills (TEAMS)
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA Modified by Dr. Teresa Cortez September 10, 2007.
School Accountability in Delaware for the School Year August 3, 2005.
The Basics of Federal Accountability Adequate Yearly Progress AYP.
State and Federal Accountability Old English Consortium Assistant Principals’ Conference October 2009.
Lazbuddie ISD Texas Academic Performance Report (TAPR)
AEIS Orenda Charter Schools. Changes to the AEIS 2  Assessment results include TAKS, TAKS (Accommodated), and TAKS-M for grades
2008 State and AYP Accountability Systems Data Analysis, Reporting, and Research September 21, 2007.
Annual Report and Public Hearing January 19, 2010.
Capacity Development and School Reform Accountability The School District Of Palm Beach County Adequate Yearly Progress, Differentiated Accountability.
NCLB / Education YES! What’s New for Students With Disabilities? Michigan Department of Education.
Assigns one of three ratings:  Met Standard – indicates campus/district met the targets in all required indexes. All campuses must meet Index 1 or 2.
Draft...proposals may change1 Proposed Changes to the Texas Accountability System Adapted from “Accountability System for 2006 and Beyond- Standard Procedures”
1 Getting Up to Speed on Value-Added - An Accountability Perspective Presentation by the Ohio Department of Education.
1 Accountability Systems.  Do RFEPs count in the EL subgroup for API?  How many “points” is a proficient score worth?  Does a passing score on the.
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA Modified by Dr. Teresa Cortez January 2010.
2012 Adequate Yearly Progress Preliminary Answers & other Important Information…
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA Modified by Dr. Teresa Cortez September 1, 2008.
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA May 2003 Modified by Dr. Teresa Cortez for Riverside Feeder Data Days February.
HISD Becoming #GreatAllOver 1 Accountability Rating System Commissioner’s Final Rules 2014.
Adequate Yearly Progress [Our School District]
Determining AYP What’s New Step-by-Step Guide September 29, 2004.
State Accountability Update
Changes Ahead: Accountability
Elementary/Secondary Education Act (1965) “No Child Left Behind” (2002) Adequacy Committee February 6,2008.
Adequate Yearly Progress (AYP)
Adequate Yearly Progress [Our School District]
Section II Accountability
AEIS [Our School District]
Understanding AYP Campus Data
Section II Accountability
2013 Texas Accountability System
Presentation transcript:

Accountability 101

State Accountability Federal Accountability # Students Met Standard # Students Tested If the Standard is not met: Apply Required Improvement Recalculate Using TPM Use Exceptions Note: Can use any combination of the three provisions, but can only use one provisions for a single indicator. # Students Met Standard # Students Tested If the Standard is not met: Calculate Performance Improvement/Safe Harbor – Compare Met Standard Rate for 2009 and 2010 (without TPM) – A 10% Reduction of Failures and Meeting the Other Measure for the Group or showing any improvement. Recalculate Using TPM Accountability Calculations

All Students African American HispanicWhiteEconomically Disadvantaged Reading/ELAxxxxx Mathematicsxxxxx Writingxxxxx Sciencexxxxx Social Studiesxxxxx Completion Ratexxxxx Dropout Ratexxxxx State Potential Measures - 35 Reviewing and analyzing a State Data Table. [Review a sample data table with the group.]

All Students African American HispanicWhiteEco Dis.Special Ed LEP Reading/ELA Performance xxxxxxx Reading/ELA Participation xxxxxxx Mathematics Performance xxxxxxx Mathematics Participation xxxxxxx Graduation/ Attendance x!!!!!! AYP Potential Measures - 29 ! = Used for other measure Reviewing and analyzing an AYP Data Table. [Review a sample data table with the group.]

Additional Features for TAKS Measures *Only one feature can be used per measure; however, different features can be used for different measures. **Without TPM State*AYP Required Improvement (RI)** Texas Projection Measure (TPM) Exceptions Provision (EP) Performance Improvement/ Safe Harbor ** Texas Projection Measure (TPM)

Performance Indicators Students must have been enrolled the full academic year: snapshot and test date. The scores are summed across grades by subject.

Where does it all come from? USDENCLBAYPIDEA

Where does it all come from? Texas Education Code State Accountability

NCLB IDEA NCLB, IDEA, TEC = TAKS Test All Students Uniform Assessment Reading Mathematics Review Specific Student Groups Review Other Areas Include SWD Cap on Alternate Assessments Additional Accountability: State Performance Plan Ratings Uniform Assessment System: TAKS TAKS (Accommodated) TAKS-Modified TAKS-Alternate All TEKS-Based Differences in Standards

AEIS Data Districts and campuses receive AEIS System Reports in November of each year for the prior year’s results. The Accountability Rating System (State Accountability) reviews a subset of AEIS indicators with specific performance standards. School Report Cards, (available on the web through the AEIS site, by year starting with ) are sent out to parents by their children's schools. These show a subset of the performance, staff, and financial measures in the AEIS reports.

Accountability Rating System (State) How does this system work? – Rating Labels Exemplary Recognized Academically Acceptable Academically Unacceptable – 35 Potential Measures Minimum Size Criteria – Other…See Mini-Chart – Information is reported through ‘Data Tables’…. District & Campus

Performance Standard Continuum Beyond the All Students, does the indicator’s group size meet minimum size criteria? If yes, was the standard met? If no, was required improvement met? If no, was the standard met with TPM applied? If no, can an ‘Exception’ be applied? – Are there enough exceptions to move the campus to AA? – Was the exception used for the same measure the prior year? If so, it cannot be used again the subsequent year.

Students must have been enrolled the ‘full academic year’ –snapshot date (last Friday in October) & test date to be included in accountability measures. This is called the accountability sub-set. Performance Standard Continuum

Required Improvement (State) Required Improvement Calculations are applied if the standard is not met. RI = The amount of gain required to reach the standard in two years. Can be used to move from Unacceptable to Acceptable or Acceptable to Recognized. The gain from 2009 must allow the indicator to reach the standard if the gain were repeated the next year. There is no floor when moving to Acceptable. The rating must be within 5 points to move to Recognized. Required Improvement is always reviewed first. If it cannot increase the indicator rating, TPM is applied, followed by Exceptions, if applicable.

Texas Projection Measure (TPM) Identifies if student is projected to pass next high stakes test at 5 th, 8 th or 11 th grade. Only available for students in grades 3-10 who: Test on TAKS, TAKS-Acc, TAKS-LAT Have scored results this year for both Reading and Math Test in the same language TPM is not available for: 7 th Grade Writing 8 th Grade Science (2009 only, available in 2010) All 11 th Grade Subjects TPM can increase the campus rating to Acceptable, Recognized or Exemplary. If applying TPM does not raise the indicator rating, Exceptions are reviewed, if applicable.

Exceptions Academically Acceptable AND RecognizedExemplary Performance Floor: Academically Acceptable – 5 points for all subjects. Recognized – The measure must be no more than 5 percentage points below the Recognized standard for all subjects. Performance Floor: The measure must be no more than 5 percentage points below the Exemplary standard for all subjects # of measures# of exceptions# of measures# of exceptions ≥ ≥ 164 Exceptions may not be used for the same indicator two consecutive years.

‘Passing & Preparedness’ 2100 Scale Score – Passing Standard 2200 Scale Score – Higher Education Readiness Component (HERC) 2400 Scale Score – Commended Performance

Adequate Yearly Progress (AYP) Federal System which incorporates our state assessments, plus graduation, attendance, and participation.

AYP Standards & Comparison to State Standards Across Years StateAYPStateAYPStateAYP Reading/ ELA Mathematics

Calculations Participation of all students enrolled on the day of testing (plus make-ups) Participation Students enrolled the full academic year Snapshot + Test Date Performance

Meet the Absolute Standard Reading/ELA – 67% Mathematics – 58% OR Meet Performance Improvement/Safe Harbor a 10 percent decrease in the percent counted as not proficient from the prior year – AND – meet the absolute standard or show any improvement on the other indicator.

Minimum Size Criteria Performance ‘All Students’ is Evaluated Students Groups: 50/10%/200 Participation ‘All Students’ – District or Campus must have 40 students Student Groups: 50/10%/200 Other Measure Graduation – 40 students in the class Attendance – 7,200 days (40 students x 180 days)

Other AYP Information TAKS (Accommodated) is combined with the TAKS results TAKS-M is used for performance (with a 2% cap) TAKS-Alt is used for performance (with a 1% cap)