MICE CM Berkeley 9-12 Feb. 05 11 February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.

Slides:



Advertisements
Similar presentations
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
Advertisements

Tests of CAEN 1190 Multi-hit TDCs Simona Malace Brad Sawatzky and Brian Moffit JLab Hall C Summer Workshop Aug , JLab.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Parameter List Edda Gschwendtner Introduction Parameter list for sub-systems of MICE.
PID activities 1. Summary of work/activities since last CM in Berkeley 2. PID parallel session in Frascati 3. Topics specific to each subdetector CKOV1.
1 MTD Readout Electronics J. Schambach University of Texas Hefei, March 2011.
9 March 2005Edda Gschwendtner1 DAQ Terminology ISIS Terminology MICE Terminology Parameter Definitions.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
Control, Monitoring and DAQ Makoto Yoshida Osaka Univ. MICE Frascati June 28, 2005.
Controls Review  Want to record a full configuration of the experiment at every possible “event”, including controls data.  Event trigger = accelerator.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Time over Threshold Electronics for Neutrino Telescopy George Bourlis + multiplicity.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Status of TPC experiment ---- Online & Offline M. Niiyama H. Fujimura D.S. Ahn W.C. Chang.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Controls for Particle ID/tracking in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Needed for particle ID/tracking M. A. Cummings May.
Glenn R. Young, ORNL 12/13/2015 BNL Core Week Computing Meeting 1 Online & Calibration/Monitoring November 11, 1998 Calibration and Monitoring - Online.
PMT Readout and Floor Triggering Charge estimation using the times over the thresholds Event Building and Triggering + multiplicity George Bourlis.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Trigger and DAQ System Zhao Jing Wei Sept. 2002, BESIII review, Beijing Outline Trigger system Event rate estimation Principle of design Scheme Monte Carlo.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
Controls and monitoring in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Data record M. A. Cummings April 2004 CERN.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
D. Bertrand, J. De Bruyne, P. De Harenne, L. Etienne, S. Hannaert, G. Van Beek The Arch.
Downstream Cherenkov Gh. Grégoire University of Louvain MICE collaboration meeting RAL, October 28, 2004 Design study for the Technical Reference Document.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Jean-Sebastien Graulich, Geneva
Hellenic Open University
Hellenic Open University
The IFR Online Detector Control at the BaBar experiment at SLAC
CLAS12 Timing Calibration
The IFR Online Detector Control at the BaBar experiment at SLAC
Particle ID Diagnostics in the MICE Beamline
The CMS Tracking Readout and Front End Driver Testing
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Presentation transcript:

MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner

MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 2 Detector Expert’s Terminology Running conditions  HV, T, P, mixture, alignment, dead channel, (detector configuration). Either: Slow control Come from special analysis from data Special events (calibration events)  Empty events (computing pedestal)  Triggers (Cosmics, sources)  pulsers (auto-induced by DAQ) Pulsing the electronics (e.g. gives gain-curve)  Laser, LED, muons… Monitoring parameters (on-line)  Basic, timing distribution, pulse-height distribution Needs special trigger Not beam related. Beam off, or in-between. Need Slow Control Basic analysis

MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 3 CKOV1 (Cremaldi) Running Conditions (CM parameters)  PM Tube HV – 4 channels + 1 spare  Box temperature  Purge gas flow  Freon level Special events (Calibration events)  Noise level pedestal  Random pedestal trigger  Photoelectron count- 4 channel + 1 spare  Single electron photo-peak  Muon bunch structure  Device efficiency vs. muon position  Laser pulse system trigger (shared with CKOV2) Monitoring parameters (on-line) Extra RAL  Oscilloscope  ADC card + PC  External trigger line  Radioactive source trigger + logic  Trigger paddles + logic for muon response survey

MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 4 CKOV2 (Gregoire) Running Conditions (CM parameters)  8 HV  Temperature probe  He pressure  Humidity Special events  Pedestal, gain  8 responses of PMs to light pulses  1 digital output for triggering light pulser Monitoring Parameters  8 TDC outputs

MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 5 CKOV2 …

MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 6 TOF (Bonesini) Running Conditions (CM Parameters)  HV  Temperature  Magnetic field Special Events  Pedestal  Cosmic measurements  Laser calibration

MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 7 EmCAL (Tortora) Running Conditions (CM parameters)  HV of PMs (  CAEN SY 527, CAENNET VME Controller V288 for remote control)  Residual B field Special events  Pedestals  Stand-alone readout system  Cosmic rays run for E, t, calibration Monitoring events  Global Time Offset ( Trigger formation time with respect to ISIS bunch warning)

MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 8 Summary All sub-systems should recheck their demands on the DAQ with the new terminology! Choose suitable FADC Prepare for testing TDC  VME - V1290 A 32 Channel Multihit TDC High Channel Density 25 ps LSB ECL/LVDS Input Signals Leading and/or Trailing Edge measurements 5 ns Double Hit Resolution Trigger Matching and Continuous Storage acquisition modes 32 Kwords Buffer Memory BLT32/MBLT64/CBLT32/CBLT64 Multicast commands Live Insertion