12.18 report LIU Qian. Moon box test Purpose: Try to find the reason why the Q resolution is about 10%. Test: The stability of Ref-PMT test Ref-PMT voltage.

Slides:



Advertisements
Similar presentations
Today’s report LIU Qian. We made labels for each fiber. The labels show the PMT’s number corresponding to the fiber. This lable means: east side # inside.
Advertisements

Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
Data analysis BTF 23 e 24 mag 05 T1 T2 500MeV electrons Repetition Rate 50 Hz Pulse Duration 1-10 ns Current/pulse 1 to 8 particles σ XY ~2mm Max Electronic.
This lesson covers the following outcomes Unit 54 P1, P7, P8 Unit 6 P10, P11.
IK/JJ May 6 th 2012 Slide 0 Results from EMMA Injection Line BPM-02 measurements on May 6 th 2012 Ian Kirkman, James Jones.
Steps & Results LIU Qian. 1.Login to the daq01 farm. 2.Input: “../i686-slc3-gcc323-opt/toa ” (Hint: you don ’ t have to type the full path name, you can.
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.
Recent Result of TOF Monitor System Qian LIU. Outline  Ref-PMT  Barrel TOF  End cap TOF.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
TOF monitor system Qian LIU. Outline TOF Monitor system introduction (briefly) Arithmetic of TOF Monitor system analysis program How to run the program.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 24, 2007.
ARA Testbed Efficiency (Rough Cut) November 29 th Ben Rotter.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
Recent results Marc & Qian. Outline 3D uniformity scan End cap TOF counter test result Report of moving laser box.
Performance of SPIROC chips in SKIROC mode
Alternating Current Chapter 12. Generating AC (12-1)
TDS 210 BASIC INSTRUCTIONS. Measure 1. Push the MEASURE button to access the automated measurement. 2. capabilities. There are five measurements available.
Tests with JT0623 & JT0947 at Indiana University Nagoya PMT database test results for JT0623 at 3220V: This tube has somewhat higher than usual gain. 5×10.
DAQ Cards, or Instruments The purpose of this presentation is to familiarize new Lab View users to the different computer aided test recourses available.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
S. Hansen, S. Pordes & E. SkupR11065 study 10/1-6/ st Look at FNAL at R11065 at room temperature. Plots of pulses on oscilloscope at different voltages.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.

ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
September 7/04Cyclotron Development Meeting. Improvement TOF Possible TOF improvements.
Bernard JEAN-MARIE Pmt Group Meeting 1 PMT Testing o Pulse parameters at low gain o Study of Gain measurement reproducibility o Gain prediction.
Use Agilent MSO9404A scope as DAQ system to measure APD time resolution with laser diode - Step by step instruction C. Lu Princeton University (3/30/2015)
MPPC Measurements at LSU Brandon Hartfiel LSU Hardware Group Thomas Kutter, Jessica Brinson, Jason Goon, Jinmeng Liu, Jaroslaw Nowak Sam Reid January 2009.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
PMT gain check at Indiana University. Test setup inside dark box LED white paper PMT # JT0298 channel #2 (per HPK numbering) OTHER CHANNELS MASKED WITH.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)
Introduction to PMT Check sheet for PMT test date shift 연번항목확인 1 PMT cable labeling 2 PMT box labeling 3 PMT glass 닦기 4 PMT mounting.
NA62: The LKr Electronics Matt Huszagh. Installation & Setup (1/5) Crate Setup 8 vertical columns of 4 crates Almost all installed.
Gain Curves Jason for the SB Crew June 5, Raw 55 Fe Spectra Start with 55 Fe spectrum from a MCA. Fit peak to gaussian. Calibration from a pulser.
DREAM Coll. Meeting, Rome 2009F. Bedeschi, INFN-Pisa Template Analysis of DRS Data  Motivations  Preliminary results F. Bedeschi, R. Carosi, M. Incagli,
1 Chapter No. 17 Radiation Detection and Measurements, Glenn T. Knoll, Third edition (2000), John Willey. Measurement of Timing Properties.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Timing Constants for Outriggers using the Milagro Laser Matthew E. Wilson November 16, 2003.
ROOT: Functions & Fitting Harinder Singh Bawa California State University Fresno.
Sensitivity of HO to Muons Shashi Dugad for HO group India-CMS Meeting 6-7 Oct
S-2S meeting Toshiyuki Gogami 15 Oct Contents TOF detector Kyoto University.
1 MPPC Timing Resolution Akito Kobayashi Shinshu University Table of contents ・ Timing Resolution ・ Set up ・ data treatment ・ result(1) ・ result(2) ・ result(3)
EZDC spectra reconstruction and calibration
Yuzhe Liu1,2, Lian Chen1,2, Futian Liang1,3, Feng Li1,2, Ge Jin1,2
Solving pedestal problem
Monitoring system commissioning
HVStripV1 Post-Irradiation Testing
Han Jifeng BESIII MUON GROUP IHEP, CAS
The New Readout Electronics for the SLAC Focusing DIRC Prototype (SLAC experiment T-492 ) L. L. Ruckman, G. S. Varner Instrumentation Development Laboratory.
BESIII EMC electronics
Monday – Morning Fill 3265 stable beams since 1:31
T2K Run8 MUMON Summary.
Programs for the calibration of TOF measurement with the new pulser
Stability of Calibration Data
BUCKEYE has internal shift register which controls calibration
My work in Hiroki Tanaka.
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
DAQ and visualization software
Presentation transcript:

12.18 report LIU Qian

Moon box test Purpose: Try to find the reason why the Q resolution is about 10%. Test: The stability of Ref-PMT test Ref-PMT voltage test

We use the LECROY 7100 oscilloscope, which can fill a histogram using measured value (such as peak to peak). We saved the histogram to a data file, and used root to analysis it. The luminosity is set as 3.5, and the voltages of Ch1 and Ch2 Ref-PMT are 460 mV and 486 mV respectively. The trigger for laser is 3V, 1K Hz, and the width of pulse is 2 us.

The pkpk histogram of Ref-PMT signal Using the LECROY 7100 oscilloscope, we measured the peak to peak, filled a histogram and fitted with Gaussian in ROOT. pkpk Entries

The stability of Ref-PMT After fitted with Gaussian, the mean value and the sigma are plotted. Pkpk (V)

PlotDateTimeCH1 (mV)CH2(mV) 0Dec. 186:00 pm266.4± ±10.8 1Dec. 199:00 am244.7± ±10.5 2Dec ± ±10.2 3Dec ± ±10.4 4Dec ± ±10.3 5Dec ± ±10.4 6Dec ± ±10.1 7Dec. 1911:00 am246.2± ±9.7 We can see that the sigma of both channel doesn ’ t change much, but the mean value changes a lot. For channel 1, it changed about 33.4 mV, While for channel 2, it changed about 39.5 mV.

1.After we installed the moon box into the rack, we did measure the Ch1 and Ch2 ’ s pkpk, they were: 187 mV and 196 mV, but now they ’ ve changed to 240 mV and 302 mV. 2.I ’ ve opened the box again and checked the prisons, they ’ re clean and stable. 3.The temperature in the rack is about 30 degree (or even higher). Maybe this is the reason. They ’ re working on how to cool the rack now. 4.The resolution is small, about 2% ~ 3% which is much less than 10%.

Ref-PMT voltage test mV Pkpk (V) Almost linear X is the voltage of Ref-PMT, Y is mean, the error of Y is sigma.

Percent (%) mV X is the voltage of Ref-PMT, Y is sigma/mean (%) We can see the sigma/mean doesn ’ t change with the voltage of Ref-PMT.

The sigma/mean don ’ t change with Ref-PMT voltage, and they are about 2% ~ 3%. Now we choose the voltages of Ref-PMT are 447 mV and 455 mV, the pkpk of these two Ref-PMT are both 200 mV. From these test results, I think our laser is stable. But the mean value did change a lot. Tomorrow we ’ ll pulse the laser and read the data from USTC DAQ (including the barrel TOF). LIU Qian