MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
CMPB Alain Blondel 14 April STATUS OF MICE.
1 Schedule Discussion Background & aims Major milestones & drivers Summary of important dates Project risks MICE CM26, 24-27th March, 2010.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
MICE Operations Manager Report Linda Coney University of California, Riverside UKNF Meeting June 8, 2010.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference May 7, 2009.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
M.apollonioNuFact??1 ABSTRACT In the Muon Ionization Cooling Experiment (MICE) at RAL, muons are pro­duced and transported in a dedicated beam line connecting.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE Operations Scenario Run 1
Project Manager’s Report + DC/MoM Report
Luminosity Monitor Status
Presentation transcript:

MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010

April 27, 2009Commissioning Needs-Soler2 Commissioning Needs Decay Solenoid —As you all know the Linde refrigerator developed a blockage fault —Linde engineer worked March: changed charcoal in gas panel adsorber, heated it out, purged it and refilled compressor and no leak was found. —But when the compressor was isolated from cold box and ran system with cold trap in circuit the N 2 level rose from 50 ppm by 2-3 ppm/hour. —Working hypothesis: changing charcoal had no effect so there might be a leaking compressor shaft seal and might need replacing —The collaboration meeting and Easter got in the way of a speedier resolution —Linde will send their engineer, Matthias Hoberich, and he arrives Tuesday night (so should be ready for work Wed-Sat April). —HPC should receive shaft seal today and will also send technician on Wednesday for installation. They will be working with Mike Courthold and Matt Hills this week to try and solve problem. —Once refrigerator is fixed then it will take ~10 days to cool down to operating temperature. —All going well, we will not have the Decay Solenoid ready for data taking until the very end of April or beginning of May

April 27, 2009Commissioning Needs-Soler3 Commissioning Needs Decay Solenoid (cont.) —Another problem with PTR90 Pirani/Penning vacuum gauges (giving false readings 4E-3 mbar) – 9 April o Examined with Leybold rep but they were not significantly contaminated o These were cleaned and now they work, but do not really understand why o Purchase four more PTR90 heads for spares (£703 each) —Scroll pumps have never been serviced o DS south side pump struggling to pull vacuum below 3mbar – removed for servicing o DS north side pump can cope below 2E-3 mbar, so that pumping stack now in full use and pumping the DS! o Transfer line pump removed and replaced DS south side pump but also needs servicing and can only go down to 0.2 mbar

April 27, 2009Commissioning Needs-Soler4 Commissioning Needs Target —Investigation of R78 target: see collaboration meeting slides —Target in ISIS has a total of 161K actuations and working well Detectors —Luminosity Monitor o LM stand was bolted to ISIS floor during April shutdown o Dedicated machine physics run on Friday 16 April to determine dead time of LM (change gate width as a function of beamloss and measure rate) —Tracker o Problems with cryostat: due to cold weather over Christmas, seal was damaged and developed leak. o Alan Bross at RAL this weeek to fix problem. —CKOV,TOF0, TOF1, TOF2, KL: I would need experts to start these up in preparation of run. o TOF0,1,2 would need new calibration? Beam Magnets —Willie installed new pressure valves in D2, Q4-Q9 warm magnets. —Flow rate is now l/min in quadrupoles Q4-Q9 and dipole D2 (used to be around l/min). —Q1-Q3 and D1 remain with flow rate ~30 l/min —Magnet polarity labelling scheme from Henry has been adopted

April 27, 2009Commissioning Needs-Soler5 Preparation for run Machine development period: April —We have only requested one shift (18:00-24:00) during this period, on Friday 16 April for Luminosity Monitor rate vs gate width studies (change LM gate from ns and beamloss V) Programme ISIS run: 20 April – 28 May —While decay solenoid not operational (20 April – first or second week May?) o Perform new TOF0,1,2 calibration with blown up defocused beam to try and cover all counters – would need beam parameters from Marco o Proton absorber tests – move different thickness of absorber to compare particle rate vs absorber thickness —While decay solenoid operational (First or second week May-26 May): o Perform target scan: delay target vs depth (ie acceleration) to try and flatten spill and reduce pileup and beam overlaps. o Work our way through Matrix of emittance (4 , 6 , 10  ) vs momentum (160, 200, 240 MeV/c) with all detectors on. o Statistics for each point? ~1Million muons?

April 27, 2009Commissioning Needs-Soler6 Preparation for run ISIS shutdown: 29 May-13 June Next machine development period June —Request further activation run: 16 hours with 4V beamloss? ISIS users run 22 June – 12 August —Continue with Step I programme of emittance measurements vs momentum matrix. —Last ISIS run before long shutdown 13 August 2010-February 2011