GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Advertisements

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
9/23/2005 Inst. Ana. MeetingTKR trigger efficiency with ACD&CAL 1 Study of TKR trigger efficiency with ACD and CAL Mutsumi Sugizaki, Hiro Tajima SLAC.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
TriggerLatchingEffLAT_ ppt1 Status report of overall Trigger and Latching Efficiencies study Instrument Analysis meeting, May 13, 2005 Tsunefumi.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
Gamma Ray Large Area Space Telescope Balloon Flight: Data Handling Overview E. do Couto e Silva, R. Dubois, D. Flath, I. Gable,T. Kamae, A. Kavelaars,
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
GLAST Large Area Telescope Instrument Science Operations Center
I&T&C Organization Chart
GLAST Large Area Telescope:
Mini-Tower test results
Gamma-ray Large Area Space Telescope ACD Final Performance
Comparison of GAMMA-400 and Fermi-LAT telescopes
GLAST LAT tracker signal simulation and trigger timing study
Gamma-ray Large Area Space Telescope
Integration, Test, and Calibration
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Overview of Instrument Analysis Effort
Instrument Analysis Workshop Series
Overview Goal Study GEM variables in SVAC ntuple
Imaging crystals with TKR
Mini Tower Preliminary Results
Integration and Test Organization Chart
Eduardo do Couto e Silva Feb 28, 2006
Studies of the Time over Threshold
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
Analysis of GLAST Balloon Experiment Data
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva SLAC Jul 19, 2005

GLAST LAT Project July 19, 2005 E. do Couto e Silva 2/17 Science Verification Analysis and Calibration Objectives –Calibrate the LAT and characterize its performance prior to launch –Maximize science return by optimizing instrument capabilities –Understand systematic effects to extend science reach –Provide input to Instrument Science Operations Center –Develop calibration, monitoring and diagnostics tools to be exercised on-orbit –Strengthen collaboration ties and disseminate knowledge across teams –Instrument analysis workshops ( 5 th meeting scheduled for Aug 29) Data –Cosmic ray secondaries and low energy photons –Collected at several stages of the LAT integration –Particle beam tests –spare LAT modules (after instrument delivery) –Sophisticated Monte Carlo simulations –Comprehensive description of detector geometry and physics processes Data Analysis –Probe a large parameter space of the Large Area Telescope –Search for hardware failures –Debug software –Learn about the operational characteristics of the instrument

GLAST LAT Project July 19, 2005 E. do Couto e Silva 3/17 Secondary Cosmic Ray Showers Muon candidates Work from Anders Borgland (SLAC)

GLAST LAT Project July 19, 2005 E. do Couto e Silva 4/17 Instrumental Capabilities Energy Resolution requirements –Calibrate Energy Scales –Beam test –Calibrate out non-linear effects Pointing accuracy requirements –Inter and Intra tower alignment

GLAST LAT Project July 19, 2005 E. do Couto e Silva 5/17 Calibrate Energy Scales Muon candidates –11.2 MeV peak in CAL crystals We are able to probe effects at the 2% level –improved offline software DataMC Work from David Smith (Bordeaux, France)

GLAST LAT Project July 19, 2005 E. do Couto e Silva 6/17 Intra Tower Alignment the ideal tower a horizontal shift a vertical shift a rotation the real tower Work from Michael Kuss (Pisa, Italy)

GLAST LAT Project July 19, 2005 E. do Couto e Silva 7/17 Horizontal and Vertical Alignment Aligns: horizontal (  to strips) vertical X4 X3 X2 X1 X0 real position ideal position res =  x +  z · cot(θ) θ horizontal displacement: 157  m vertical displacement: 81  m

GLAST LAT Project July 19, 2005 E. do Couto e Silva 8/17 Calibrations Work! Effect is calibrated out for all planes

GLAST LAT Project July 19, 2005 E. do Couto e Silva 9/17 Objective –Measure and monitor trigger efficiencies –includes effects from »Gap between Silicon wafers »dead strips »insensitive area »alignment »timing Select muon candidates with TKR –Define a track using 4 layers –3 top and 1 bottom –Test intermediate layers –Measure efficiency –Compare with MC simulations –Direction and position measured by TKR »See next slide TKR Efficiencies Work from Tsunefumi Mizuno et al (Hiroshima, Japan) Tower

GLAST LAT Project July 19, 2005 E. do Couto e Silva 10/17 Good agreement between MC and Data within 1% for all 6 towers Tower in Pos#8Tower in Pos#9 TKR Efficiencies: Data/MC Simulation

GLAST LAT Project July 19, 2005 E. do Couto e Silva 11/17 Timing of Integrated Systems Need to align TKR/CAL/ACD –To trigger efficiently Need to align TKR/CAL/ACD –To latch data efficiently On-orbit Operations –Trigger alignment knobs are controllable remotely –We are currently acquiring experience on the ground

GLAST LAT Project July 19, 2005 E. do Couto e Silva 12/17 Minimizing the Effects of Trigger Jitter Mainly caused by pulse height differences with respect to the trigger threshold –TKR –Large signals from CNO –CAL –Large variation in energy Time-in of towers –Optimize performance –Uniformity across towers Work from Martin Kocian and Su Dong (SLAC)

GLAST LAT Project July 19, 2005 E. do Couto e Silva 13/17 Time Between Events: Baseline Run Expect 26.5  s Good agreement! Work from Warren Focke and Anders Borgland (SLAC)

GLAST LAT Project July 19, 2005 E. do Couto e Silva 14/17 Probing Several Instrument Configurations We designed a series of tests in which we change only one parameter in the instrument and –Collect cosmic rays –Select muon candidates –Verify the behavior is not affected by parameter changes Example of parameters –Read TKR from “right” or “left” cables only –Change Voltage of Power Distribution Unit –Overlay a source of high rate triggers on the top of existing cosmic ray triggers

GLAST LAT Project July 19, 2005 E. do Couto e Silva 15/17 Plane ● Baselin e ● Min ● Max Bottom Plane = 0 Top plane = 35 From Stefano and Claudia (Perugia, Italy) No major discrepancies found so far… Change voltage From Monica Brigida (Bari, Italy) Baseline (read from both sides) Right Readout only Left Readout only

GLAST LAT Project July 19, 2005 E. do Couto e Silva 16/17 Cosmic Ray Secondaries: Photon Candidates Work from Leon Rochester (SLAC) and William Atwood (UCSC)

GLAST LAT Project July 19, 2005 E. do Couto e Silva 17/17 Summary and Outlook Summary of SVAC activities –Focus on improving and updating calibrations –Explore on-orbit operational aspects of the instrument –As well as we can simulate on the ground –Not part of PASS/FAIL testing –Longer term feedback on instrument characterization –Propose special tests as needed Timeline –Environmental Tests –Data will be delivered to SLAC for offline analysis –Focus on correlating housekeeping with science data –Environmental dependencies of calibrations –Spacecraft Integration –On-orbit checkout –First year of operation