4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ET CMS detector resolution zCMS Silicon Strip Tracker zCMS Silicon Strip Detector Resolution zHIP Silicon Beam Telescope.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Rods Schedule and Issues J. Incandela University of California Santa Barbara for the TOB Rod Group Tracker Integration Meeting October 27, 2005 Slides.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Cluster Threshold Optimization from TIF data David Stuart, UC Santa Barbara July 26, 2007.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Anthony AffolderUS CMS Meeting 12/3/02Previous Burn-in Experience CDF Burn-in Experience Hybrid Burn-in à 4 days with extensive tests at start/end à ~9.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
28 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Identifying anomalous strips David Stuart, Noah Rubinstein University of California, Santa Barbara June 18,
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
The Finnish CMS Collaboration Helsinki Institute of Physics S. Czellar, A. Heikkinen, J. Härkönen, V. Karimäki, H. Katajisto,R. Kinnunen,T. Lampén, K.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Operation of the CMS Tracker at the Large Hadron Collider
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Commissioning and performance of the CMS silicon microstrip detector
Rod adaptors for module tests Module positioning studies
5% The CMS all silicon tracker simulation
ROD assembly and test in US
Update of US Testing Status
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
FNAL Module Testing Status
On behalf of the US TOB testing group
Module production in Italy
Anthony Affolder UC Santa Barbara
US Module Testing Progress Report
TOB Module Production Overview and Plan
The CMS Tracking Readout and Front End Driver Testing
Hybrid & Module Testing Status
Module Failures on Rods
Setup for testing LHCb Inner Tracker Modules
US Module Testing Progress Report
Equipment Status ARCS equipment status DAQ equipment status
Presentation transcript:

4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”

4/25/2006 CMS Tracker 5.4 m Inner Barrel & Disks (TIB & TID) Pixels Outer Barrel (TOB) volume 24.4 m 3 running temperature – 10 0 C 2,4 m End Caps (TEC)

4/25/2006 Rods 101 Rods – Basic self-contained element of the TOB.

4/25/2006 Rods 101 Carbon Fiber rod frames are built at Helsinki and shipped to CERN where communications and cooling infrastructure are incorporated. Then sent to US (FNAL and UCSB) where they are populated with modules and tested. Rods come in 3 flavors –SS4 (Single Sided 4) - 6 modules each with 4 readout chips (512 channels). –SS6 (Single Sided 6) - 6 modules with 6 readout chips (768 channels). –DS4 (Double Sided 4) - 12 modules with 4 readout chips, 6 of which are small angle stereo for better resolution in z direction.

4/25/2006 Tracker Outer Barrel (TOB)

4/25/2006 RODS Communications Bus AOH (Analog Optohybrid)

4/25/2006 Rod Assembly Rods are populated with sensors by engineers at both sites. Rate of rod assembly is rods/week at each site.

4/25/2006 Rod Testing Each rod put through preliminary 1 hour test in SRT (Single Rod Test stand). Basic functionality of Rods is tested. – Perform Pedestal run in all 4 operating modes of readout chip and Charge Injection test in 2 of the 4 operational modes Typical PedestalsTypical Noise Profile

4/25/2006 Rod Testing Till now, most problems with the rods (new bad channels, communications failures, etc) have been found in SRT during our preliminary tests. After passing preliminary test, rods are tested in MRT (Multi Rod Test). –MRT has capability to test up to 8 rods at one time. –Goal is to push rods so that any weakness is discovered and fixed before integration in detector. Find possible pinholes, ie, weak coupling capacitors. –MRT is a 2 day “burn-in”. We stress rods rods by cycling the temperature of the coolant from 20C to -23C. Run tests in both warm and cold.

4/25/2006 Rod Testing – Multi Rod Stand Lots of electrical, optical and cooling connections!

4/25/2006 Bad Channel Flagging Normalized Noise distribution has nice, tight gaussian shape. Outliers are clearly visible and can be easily cut on.

4/25/2006 Bad Channel Flagging Plot of normalized Pulseheights – response of channel to charge injection Open Channels Noisy Channels Shorts Pinholes (short in thin SiO2 layer, between AL strip and n-type bulk) would show up here. Important to find pinholes because they draw high current. Bad modules are removed from rods and thoroughly retested!

4/25/2006 Leakage Current Monitoring Leakage Current is very important to catch pinholes. Typical modules will have leakage currents from uA. If pinhole present, current will be much higher. uA

4/25/2006 Rod Production Status On track to finish rod Production by mid summer at the latest!

4/25/2006 Summary Module production is ramping down as we are almost done and the final step is to test and ship rods. Goal of testing is to stress rods and uncover any potential problems so that there are no surprises in detector. All problems encountered so far have been fixed. Production is going smoothly and rates are keeping pace with projected completion dates! Rods are being shipped to CERN for installation into TOB and final testing before integration with detector.