INTERSTATE 75 / OVERPASS ROAD INTERCHANGE JUSTIFICATION PROCESS Presentation to Pasco County Board of County Commissioners December 6, 2011 Presentation.

Slides:



Advertisements
Similar presentations
Great Western Corridor Feasibility Study
Advertisements

Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
GROWTH MANAGEMENT 0 David Hutchinson Office of Policy Planning Department of Transportation Proportionate Fair Share Mitigation.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
OLD KINGS ROAD Special Assessment District. Overview History Phased Project Current Status.
Capital Investment Program Listening Session Presented at APTA Annual Meeting -- 10/03/2012 RailVolution /14/
New I-65 Interchange at Worthsville Road Welcome!.
Environmental Assessment Public Meeting
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Florida Department of Transportation District One Interstate Planning for I-4 and I-75 October 30, 2012.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
TPO Board. 25-Year Planning Horizon Update LRTP every 5 years Identify needed major improvements Determine those that are “cost feasible” (i.e., highest.
SB 360 and Multi-Modal Impact Fees & Efficiently Managing a Street Lightning System.
Presentation Outline Summary of efforts-to-date Broward County LRTP Amendment Process Next steps.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Economic Incentive Plan and Impact Fee Update Board of County Commissioners Work Session February 7, 2012.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners January 8, 2013.
I-4 ULTIMATE DESIGN PRESENTATION TO THE VOLUSIA TPO AUGUST 21, 2012 FDOT Contact: John Zielinski (407)
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners May 8, 2012.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Transportation Disadvantaged Local Coordinating Board (TDLCB)
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Transportation Project Process: From Concept to Completion Kate Daniel, TPO Staff October 8, 2015.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Polk Transportation Planning Organization 2035 Mobility Vision Plan Nov./Dec Draft Amendments to the Polk 2035 Mobility Vision Plan (MVP) Steering.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
EAST BATON ROUGE PARISH PECUE LANE/I-10 INTERCHANGE EAST BATON ROUGE PARISH CITY/PARISH PROJECT NO. 09-CS-US-0041 STATE PROJECT NO. H FEDERAL AID.
Visit Our Website at: Click to edit Master title style.
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
All information presented is preliminary and subject to revision I-515 Alternatives Development Study Public Information Meeting March 31, 2016 Welcome.
Concurrency Management &ProportionateFair-ShareTransportationMitigation.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
Update of Transportation Priorities Plan
A Presentation to: River to Sea TPO Board October 26, 2016.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Central Polk Parkway PD&E Study
A Presentation to: River to Sea TPO BPAC November 9, 2016.
River to Sea TPO - CAC/TCC
21st Century Transportation Committee Finance Subcommittee
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
S.R. 30 (U.S. 98) Tyndall Parkway
Update on Kings Highway Corridor
2040 Long Range Transportation Plan Update
Lyle Parkway to SR 540 (Winter Lake Road)
Transportation Impact Fees and Funding
East Selmon Capacity Project PD&E Study Industry Forum
Space Coast TPO State Road (S.R.) 528 Update
Public Workshop September 26, 2019.
Presentation transcript:

INTERSTATE 75 / OVERPASS ROAD INTERCHANGE JUSTIFICATION PROCESS Presentation to Pasco County Board of County Commissioners December 6, 2011 Presentation to Pasco County Board of County Commissioners December 6, 2011

PRESENTATION AGENDA Project BackgroundProject Background Project Purpose & NeedProject Purpose & Need Interchange Justification Report (IJR) StatusInterchange Justification Report (IJR) Status Upcoming PD&E ProcessUpcoming PD&E Process ScheduleSchedule QuestionsQuestions Project BackgroundProject Background Project Purpose & NeedProject Purpose & Need Interchange Justification Report (IJR) StatusInterchange Justification Report (IJR) Status Upcoming PD&E ProcessUpcoming PD&E Process ScheduleSchedule QuestionsQuestions 2

LOCATION MAP 3 Proposed Interchange

PROJECT BACKGROUND 4 Overpass Road Route Study (2005) Overpass Road Route Study (2005) I-75/Overpass Road Interchange Feasibility Study ( ) I-75/Overpass Road Interchange Feasibility Study ( ) LRTP 1 (adoption December 2009) Comp Plan Amendments (2010) LRTP 1 (adoption December 2009) Comp Plan Amendments (2010) ETDM Programming Screen (2008) ETDM Programming Screen (2008) FHWA Feasibility Study Review/ Concept Acceptance Letter (2007) FHWA Feasibility Study Review/ Concept Acceptance Letter (2007) Future PD&E Study ( ) 2 Future PD&E Study ( ) 2 1 Overpass Road Interchange included in Cost Feasible 2035 LRTP 2 Tentative. It may take a longer period of time based on review periods and coordination between the IJR and the PD&E Studies.

FDOT PROJECTS I-75 Mainline WideningI-75 Mainline Widening –North of CR 54 to North of SR 52 –Add Lanes (4 to 6) –Right-of-Way: FY 13/14* –Construction: FY 19/20** *Source: Adopted FDOT Five-Year Work Program FY 11/12-FY 15/16 *Source: Adopted FDOT Five-Year Work Program FY 11/12-FY 15/16 **Source: SIS Second Five Year Plan FY 16/17-FY 20/21 I-75 Mainline WideningI-75 Mainline Widening –North of CR 54 to North of SR 52 –Add Lanes (4 to 6) –Right-of-Way: FY 13/14* –Construction: FY 19/20** *Source: Adopted FDOT Five-Year Work Program FY 11/12-FY 15/16 *Source: Adopted FDOT Five-Year Work Program FY 11/12-FY 15/16 **Source: SIS Second Five Year Plan FY 16/17-FY 20/21 5

PROJECT PURPOSE Study the potential benefits & impacts of a new interchange in accordance with Federal requirementsStudy the potential benefits & impacts of a new interchange in accordance with Federal requirements Evaluate traffic operations for existing & future conditionsEvaluate traffic operations for existing & future conditions Propose & evaluate alternative interchange configurationsPropose & evaluate alternative interchange configurations Study the potential benefits & impacts of a new interchange in accordance with Federal requirementsStudy the potential benefits & impacts of a new interchange in accordance with Federal requirements Evaluate traffic operations for existing & future conditionsEvaluate traffic operations for existing & future conditions Propose & evaluate alternative interchange configurationsPropose & evaluate alternative interchange configurations 6

PROJECT NEED Projected population and employment growthProjected population and employment growth Traffic growth / increased congestionTraffic growth / increased congestion Inability of existing interchanges at I-75/CR 54 and I-75/SR 52 to handle future demandInability of existing interchanges at I-75/CR 54 and I-75/SR 52 to handle future demand Projected population and employment growthProjected population and employment growth Traffic growth / increased congestionTraffic growth / increased congestion Inability of existing interchanges at I-75/CR 54 and I-75/SR 52 to handle future demandInability of existing interchanges at I-75/CR 54 and I-75/SR 52 to handle future demand 7

IJR STATUS Methodology PhaseCompletedMethodology PhaseCompleted Traffic AnalysisCompletedTraffic AnalysisCompleted Alternatives DevelopmentCompletedAlternatives DevelopmentCompleted Preliminary IJR ReportNovember 2011Preliminary IJR ReportNovember 2011 Final IJR Report SubmittalAugust 2012Final IJR Report SubmittalAugust 2012 FHWA AcceptanceDecember 2012FHWA AcceptanceDecember 2012 FHWA Approval*December 2013FHWA Approval*December 2013 *Tentative. It may take a longer period of time based on review periods and coordination between the IJR and the PD&E Studies. Methodology PhaseCompletedMethodology PhaseCompleted Traffic AnalysisCompletedTraffic AnalysisCompleted Alternatives DevelopmentCompletedAlternatives DevelopmentCompleted Preliminary IJR ReportNovember 2011Preliminary IJR ReportNovember 2011 Final IJR Report SubmittalAugust 2012Final IJR Report SubmittalAugust 2012 FHWA AcceptanceDecember 2012FHWA AcceptanceDecember 2012 FHWA Approval*December 2013FHWA Approval*December 2013 *Tentative. It may take a longer period of time based on review periods and coordination between the IJR and the PD&E Studies. 8

INTERCHANGE CONCEPTS EVALUATED Diamond InterchangeDiamond Interchange Single Point Urban InterchangeSingle Point Urban Interchange Diverging Diamond InterchangeDiverging Diamond Interchange Flyover Ramp InterchangeFlyover Ramp Interchange Loop Ramp InterchangeLoop Ramp Interchange Diamond InterchangeDiamond Interchange Single Point Urban InterchangeSingle Point Urban Interchange Diverging Diamond InterchangeDiverging Diamond Interchange Flyover Ramp InterchangeFlyover Ramp Interchange Loop Ramp InterchangeLoop Ramp Interchange

PRELIMINARY DIAMOND INTERCHANGE CONCEPT 10

PRELIMINARY SINGLE POINT URBAN INTERCHANGE CONCEPT 11

PRELIMINARY DIVERGING DIAMOND INTERCHANGE CONCEPT 12

PRELIMINARY FLYOVER RAMP INTERCHANGE CONCEPT 13

PRELIMINARY LOOP RAMP INTERCHANGE CONCEPT 14

PRELIMINARY INTERCHANGE CONCEPTS COST ESTIMATES Costs are preliminary, subject to review and represent present day values.

FUNDING PLAN Potential revenue sources:Potential revenue sources: –Special Non Ad Valorem Assessments –Transportation Mobility Fee Funds –Multimodal Tax Increment Funds –Mobility Fee Surcharges (Villages of Pasadena Hills) –Sales Taxes –Issuance of Revenue Bonds –Right of Way Donations Potential revenue sources:Potential revenue sources: –Special Non Ad Valorem Assessments –Transportation Mobility Fee Funds –Multimodal Tax Increment Funds –Mobility Fee Surcharges (Villages of Pasadena Hills) –Sales Taxes –Issuance of Revenue Bonds –Right of Way Donations

*FDOT and/or FHWA Review and Comment periods are built into these tasks. **FHWA Determination of Engineering & Operational Acceptability ***Tentative. It may take a longer period of time based on review periods and coordination between the IJR and the PD&E Studies. PROJECT SCHEDULE (80% Complete)

QUESTIONS ?