GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Advertisements

GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review TVAC at NRL? Status July 12, 2007 Neil Johnson.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 NRL-SLAC Networking LAT Environmental.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 2.2 Budgets & Metrics 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
Mechanical Integration
Environmental Test Planning
Integration and Test GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
Mechanical/Thermal Systems
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Environmental Test Planning Meeting
GLAST Large Area Telescope
Introduction and Overview
LAT Environmental Test Pathfinder F2F NRL-SLAC Networking Update
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL Gamma-ray Large Area Space Telescope

GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 2 Organization  Brett Pugh has agreed to take on “test director” mantle for organizing NRL option.  Billy Greenrock is GD-AIS Point of Contact  Organizing weekly teleconfs – Mondays, 11:30 EDT  Talking with GD experts for needed info  Potential face to face – GD & NRL – in the next week or two  Scott Clough has agreed to organize turn over fixture  Recover GSFC fixture and get it recertified  Will create ICD or Agreements Document (Pugh, Johnson)  Outlining roles and responsibilities  Defining documentation  Required / provided facilities

GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 3 Organization: Continued  NRL Facilities (Mike Van Herpe, Bob Haynes)  Clean tent near TVAC chambers  Staging area in Center High Bay  Need to work power requirements, networking, offices, etc  Mechanical Design, Analysis and Fab – Marc Campell  Turnover fixture adapter plate  TVAC port plates  TVAC Trolley / table adaption to L-Frame  Released drawings – SLAC  Analyses – John Ku  Fab – NRL / SLAC.  TVAC preparation and test: Brett Pugh  GD Rep: Billy Greenrock  Van Herpe will organize chamber, CDAS, power supplies, etc  QA and Safety: ???

GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 4 NRL TVAC Status  No show stoppers except …  Howard Dew suggests that NASCOM connectivity to NRL, if required, will take 240 days  Jack Leibee has action to investigate  Need to understand GD network requirements  NRL Contract  Neil working LAT CR to cover work thru August.  Bakeout of L-Frame at NRL is on the rise – decision 3 Aug.  GD’s first choice does not have needed capabilities  Target date is ~ 24 Aug. availability of L-Frame  Potential assembly and test of WattRod heaters during bakeout  New target for start of TVAC: 15 Oct  Obs arrival at NRL ~ 1 – 7 Oct.  NRL Access and Badging  Should start identifying list of people needing access and begin badging paperwork. Foreign Nationals????

GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 5 NRL Test Flow  L-Frame Bakeout (TBD)  Prep Work  Network connectivity verification  Pathfinding Turnover and TVAC Trolley/Table  TVAC chamber verification (part of bakeout?)  GLAST Arrival, Unpack  EGSE setup and checkout  Post-ship checkout  GLAST turn over  Chamber Installation  Open door CPT  TVAC  ETE and other testing  Post TVAC CPT  Post TVAC Potential Flow  Solar Array ReInst  Prop System Checkout  ETE test  Optical Alignments  Final mass properties  ETE test  Pre Ship Review  Ship to Cape

GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 6 Observatory Turn Over  Ransome Table Details  Model 500-P  Capacity 50,000 lbs  Rotation Torque 600 K in. lbs  Tilt Torque 1175 K in. lbs  C.g. At 12" above and 12" eccentric  Table rotation.007 RPM min.3 RPM max  Weight lbs  460 V 3 phase  Plug, 30A. 480V. 3 phase  Issues  Potential conflicting use by another GSFC project  Ownership and documentation  Certification  Need 2x mass and torque test  If Issues can not be favorably resolved, NRL has ICM turn over fixture that could be adapted. Need to quickly resolve the need for this work. From Scott Clough – GSFC Ransome Table

GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 7 Summary  Critical Paths?  Network connectivity to NASCOM and GD-AIS(?)  Identification, certification, adaptation and installation of turn over fixture  Adaptation of L-Frame to NRL TVAC Trolley / Table and necessary analyses / certifications to demonstrate safety.  Modification of test procedures / plans for NRL environment – Configuration and programming of thermal control system – Programming of TC monitoring and displays  Procedures, Configurations  Everything done to GD procedures and drawings?  Modifications for NRL facility / processes?  Risk Mitigation  Pathfind with version of L-Frame (#1) and mass model