UoA, NTUA, AUThATLAS Overview week 1-7 Oct 2004 BIS Integration and Commissioning Status All 112 bare BIS chambers are at CERN All but 5 are equipped with.

Slides:



Advertisements
Similar presentations
EE Chamber Commissioning By: Eric Seabron. How to find Momentum using MDTs Find To Values => t – to = td Create R-T functions to find drift radius (rd)
Advertisements

GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS BIS36 ) chambers University of Athens (UoA) Tube wiring/assembly (30,000.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
PPS telescope – main idea Have 10 layers of PPS in one test-bench The entire construction is between scintillators (top and bottom) for external trigger.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
ATLAS BIS MDT wiring facility D. Fassouliotis P. Ioannou C. Kourkoumelis V. Pancheluga D. Pappas E. Stefanidis V. Birioukov (engineer from Protvino) UNIVERSITY.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
14/11/03 CERN-ilo presentationC.Kourkoumelis,UoA1 ATLAS Muon Drift Tube wiring and testing in Greece Joint effort UoA+NTUA* Athens,14/11/03 Christine KOURKOUMELIS.
D-ES-x-xxx Rev A 5/17/10 1 of 21 (Title) – Final Design Review (FDR) (name) PI (name) PA Date of Review First Use Acknowledgements Image of diagnostic.
The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS BIS36 ) chambers ALL since Sept 04 University of Athens (UoA)
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
FNAL testbeam planning Jan 27, 2014 Alain Bellerive.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Muon commissioning status and plans G.P. C. De Plano.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
NSW SG 29 Oct Oct 2014 S. Zimmermann, NSW SG 1.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Dec
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Installation of the T600 at Fermilab CSN2, September 22,
By: Eric Seabron. B-Field Sensors: Used for magnetic field mapping. Tube Gases: No leaks, 93% Argon/ 7% CO2 at 3 bars. MDC Temp. Sensors: Accounts for.
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
LKr status R. Fantechi.
Preparation for CERN test beam
Status of upgrade works at Clermont-Ferrand
TPC Detector Control System
Presentation transcript:

UoA, NTUA, AUThATLAS Overview week 1-7 Oct 2004 BIS Integration and Commissioning Status All 112 bare BIS chambers are at CERN All but 5 are equipped with gas bars, FC’s and HH cards 78 chambers (156 ML’s) have been leak tested 29 chambers are kept pressurized at 3bars, to be measured periodically. They will be certified at the 283 leak test set up 3 chambers are fully equipped with cables sensors and electronics 1 chamber was measured in the cosmic stand

UoA, NTUA, AUThATLAS Overview week 1-7 Oct BIS Chambers have been leak tested 156 ML’s pass the leak test 4 ML’s have a pressure drop > 4mbars/day

UoA, NTUA, AUThATLAS Overview week 1-7 Oct BIS chambers has been equipped with mezzanine cards, RO cables, T-sensors and alignment cables Open issues -Missing items Define the procedure to fix the stiff RO cables in order to respect the chamber envelope Some of the CCC platform placement tools Protective covers and their fixing procedure

UoA, NTUA, AUThATLAS Overview week 1-7 Oct 2004 A BIS chamber -12 mezzanines (36 tube/layer)- is measured at the cosmic stand at Bldg 283 Maximum Drift Time variation for the 12 mezzanines < 20μsec (mezz for the trigger is used)

UoA, NTUA, AUThATLAS Overview week 1-7 Oct 2004 Summary for BIS integration BIS chamber integration proceeds without major problems and delays The main effort is now concentrated in the logistics of chamber handling for cabling Cosmic test has taken off. Online monitoring is now running on root. Improvements are envisaged