MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
D. Huang, MICE video conference1 Proton and Pion productions: preliminary simulation & measurements Dazhang Huang.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Commissioning needs MICO meeting 30 June 2008 MOM ( Roumen Tsenov)
CMPB Alain Blondel 14 April STATUS OF MICE.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
MOM report – part I Roumen Tsenov as MOM ( )
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MOG Aug 2010J.S. GraulichSlide 1 Comments on User Run o All went pretty well but we can always improve Jean-Sebastien Graulich, Geneva.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
‘Dude where's my muon?’ Trigger Efficiency of the Single Station. Edward Overton 1.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
1 Beam and Target Issues Chris Booth 5 th May 2004.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
Early Results from Beam Line Studies Jean-Sebastien Graulich, Geneva
MICE Operations Scenario Run 1
Luminosity Monitor Status
MICE Collaboration Meeting
How to turn on MICE Step IV
A Virtual Implementation of VELA (CLARA)
Presentation transcript:

MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva

MICO 9th Aug 2010J.S. GraulichSlide 2 Last week (1)  Online Optimization Some data taken but mainly code development Some data taken but mainly code development Came to some conclusions: Came to some conclusions: Need “Online” Simulation Need “Online” Simulation Need to asses beam line alignment Need to asses beam line alignment Need access to Beam Line Settings Need access to Beam Line Settings (now entered manually at start of run)  Not from CDB (available only at the end of run)  Not from EPICS (complicate software dependence scheme)  => From data stream (nearly there, need unpacking)

MICO 9th Aug 2010J.S. GraulichSlide 3 Last week (2)  Neutral study We do observe neutrals causing Triggers in TOF1 We do observe neutrals causing Triggers in TOF1 Even if all magnets are Off ! (DS at 100 Amp) Only when we dip the target ! Scales with beam loss About 7 triggers per spill at 2V beam loss 3.2 ms spill 2V ISIS beam loss = ~ 1300 mV in target DAQ Only when the beam blocker is open ! About 40% of the triggers in negative polarities are caused by neutrals About 40% of the triggers in negative polarities are caused by neutrals Irreducible Irreducible Main source of reconstruction inefficiency Main source of reconstruction inefficiency Still need TOF efficiency studies Still need TOF efficiency studies

MICO 9th Aug 2010J.S. GraulichSlide 4 Last week (3)  ISIS is tired No beam on Thursday Very little on Friday Unstable on Sunday   Target delay scan A few data acquired (4-5 points at 2V BL) Rob Fletcher is doing the analysis

MICO 9th Aug 2010J.S. GraulichSlide 5 CDB in Use   We can now reload the magnet configuration from a previous run by a single click ! That really helps Many Thanks to David Forrest and James Leaver   Now also available with tags ReferenceRun (6+200 M0) EndOfShift (all Conventional Magnets at 0A; DS at 400 A) PionScan (200 MeV/c pions, Q789 at 0A)   Please use CDB offline as well   Important Note: All variables not available through EPICS are set to zero Use spread sheet for the time being

MICO 9th Aug 2010J.S. GraulichSlide 6 This week   Alignment studies (Chris Rogers) Pion Beam at 240 MeV Narrower momentum distribution Higher statistics Q789 OFF Straight lines between TOF0 and TOF1 Not a strong effect on trigger rate DS at 100 Amp (call it “Collimator Mode”) Narrower momentum distribution   Scan D1, D2, and the Quads If ISIS allows

MICO 9th Aug 2010J.S. GraulichSlide 7 Machine Physics   Saturday August the 14 th MOM = Roumen Tsenov   From 16h30 to 24:00   Start with ISIS at 50 Hz scan target Delay at 3 V beam loss (1 hour)   Redo Adam Dobbs’ study with positive Up to 10 V Beam Loss   Arrange for radiation measurement in MICE target area soon after the run