TOF Front End electronics

Slides:



Advertisements
Similar presentations
T0 offline status Alla Maevskaya Institute for Nuclear Research, Moscow 8 October 2007 ALICE offline week For T0 group.
Advertisements

100[ch] 0.28[ps/ch] 200[ch] 0.54[ps/ch] TDC-calibration.
Mice VC Nov 2005Jean-Sébastien GraulichSlide 1 The ADC Problem in MICE o Reminder: Spill, Readout and Digitization o Acquisition Rate vs dead time o Conventional.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
TOF0 calibration The resolution in a given pixel can be measured before the absolute time calibration (see the plot) The expected total resolution of the.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
M. Bonesini - 08/06/06 Fermilab1 M. Bonesini INFN Milano MICE TOFes construction & planning.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
STaRBoard Jamal Rorie 5/09/06. Data Collection TDC Leading Edge Lo Level Discriminator Mean Timer 1:3 Splitter ADC Leading Edge Hi Level Discriminator.
Dec 2005Jean-Sébastien GraulichSlide 1 Improving MuCal Design o Why we need an improved design o Improvement Principle o Quick Simulation, Analysis & Results.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
Investigation for Readout Electronics of WAC in LHAASO Shubin Liu University of Science & Technology of China April 22nd, 2009.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
M. Bonesini DAQ Meeting1 M. Bonesini INFN Milano Some Considerations for MICE TOF Stations FE electronics (mainly TOF0)
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
A Study of Time over Threshold (TOT) Technique for Plastic Scintillator Counter 高能物理研究所 吴金杰.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
A. Rivetti Gigatracker meeting, dec 2009 Charge measurement with the TDC per pixel architecture A. Rivetti, G. Dellacasa S. Garbolino, F. Marchetto, G.
B.Satyanarayana. B.Satyanarayana INO Weekly meeting June 8, Rise time: 2 to 3ns Pulse height: mV.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
9 th Workshop on Electronics for LHC Experiments 2 October 2003 P. Antonioli (INFN/Bologna) A 20 ps TDC readout module for the Alice Time of Flight system:
1 New TOT design for the LAV F.E. electronics M. Raggi, P. Valente G. Corradi, D. Tagnani LNF electronic service TDAQ Working Group 29/05/2009.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
STaRBoard Jamal Rorie 5/09/06 Physics 476. Why do we need ToF info? Used to determine species of particle –Central Drift Chamber records path –ToF records.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
KEK Test Beam Phase I (May 2005) Makoto Yoshida Osaka Univ. MICE-FT Daresbury Aug 30th, 2005.
5/9/03Andrei Sukhanov. Phobos BWMeeting1 Andrei Sukhanov – measurements, analysis Ioury Sedykh – software, calculations Piotr Kulinich – measurements,
Nuclear Instrumentation. CEU 2014 Waikoloa Resort Hawaii.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Timing capabilities of Ultra-Fast Silicon Detector 1 A parameterization of time resolution A program to calculate Time resolution UFSD Timing capabilities.
Digitization at Feed Through Wu, Jinyuan Fermilab Feb
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Page Detector and Electronics R&D for picosecond resolution, single photon detection and imaging J.S. MilnesPhotek Ltd T.M. ConneelyUniversity.
A Low-noise Front-end ASIC design based on TOT technique for Read-out of Micro-Pattern Gas Detectors Huaishen Li, Na Wang, Wei Lai, Xiaoshan Jiang 1 State.
Prospect of SiPM application to TOF in PANDA
"North American" Electronics
Beam detectors performance during the Au+Au runs in HADES
V. Tocut, LAL/IN2P3 Orsay H. Lebbolo LPNHE/IN2P3 Paris
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Update of test results for MCP time measurement with the USB WaveCatcher board D.Breton & J.Maalmi (LAL Orsay), E.Delagnes (CEA/IRFU)
Jean-Sebastien Graulich, Geneva
MoNA detector physics How to detect neutrons. Thomas Baumann NSCL.
Alternative FEE electronics for FIT.
Hellenic Open University
Conceptual design of TOF and beam test results
PID electronics for FDIRC (Focusing Detector of Internally Reflected Cherenkov light) and FTOF (Forward Time of Flight) Christophe Beigbeder and Dominique.
Presented at 2016 IEEE Nuclear Science Symposium - N28-32
Particle ID Diagnostics in the MICE Beamline
V. Tocut, LAL/IN2P3 Orsay H. Lebbolo LPNHE/IN2P3 Paris
TOF read-out for high resolution timing
BESIII TOF Digitization
Beam Beam electronics Block diagram disc gated disc gate disc gated
Presentation transcript:

TOF Front End electronics Reminder: TOF requirement Time Walk correction Open options Constant Fraction Discriminator Charge Measurement Time over Threshold Measurement Feb 2006 Jean-Sébastien Graulich

Jean-Sébastien Graulich TOF Requirements Time resolution: 50-70 ps resolution -> Choice of TDC: CAEN V1290 (25 ps LSB, >1000 Evt buffer) Particle rate ~ 2 MHz in TOF0 Charge measurement is not required Feb 2006 Jean-Sébastien Graulich

Jean-Sébastien Graulich Time Walk Correction Timing is affected by the signal amplitude 2 Usual Solutions: Use Constant Fraction Discriminator (CFD) Measure amplitude and correct Time Walk Time Walk Correction Thresh. Time over threshold Example from Harp Feb 2006 Jean-Sébastien Graulich

Jean-Sébastien Graulich Possible Options Option 1. Constant Fraction Discriminator (CFD) The time walk is corrected automatically in the discriminator Threshold value depends on the amplitude Advantage: Easy Cabling and No ADC Drawback No information at all on the charge (Energy Deposit) Cost: TDC + ~ 125 EUR/ch (CFD) BNC Cable PMT CFD TDC Trigger Logic Feb 2006 Jean-Sébastien Graulich

Jean-Sébastien Graulich Possible Options Option 2. Measure the Charge with a QDC Advantage: More Precise and Good Charge Measurement Drawback General MICE ADC problem (No suitable QDC exists yet!) Requires Splitters More cabling Cost: TDC + ~ 125 EUR/ch (DISC) ~ 200 EUR/ch (QDC) ~ Delay Cables (~20 m/ch) (Assuming free splitters) Gate Signal PMT DISCRI Cable Delay TDC Trigger Logic Splitter QDC BNC Cable Feb 2006 Jean-Sébastien Graulich

Jean-Sébastien Graulich Possible Options Option 3. Measure the Charge with any available Solution Same Advantages and Drawbacks as 2. Cost: TDC + ~ 125 EUR/ch (DISC) ~ ??? EUR/ch (ADC) ~ Delay Cables (~20 m/ch) (Assuming free splitters) Feb 2006 Jean-Sébastien Graulich

Rising edge + Trailing edge Time Measurement Possible Options Option 4. Measure the Charge with Time Over Threshold Principle Advantage: Easy Cabling and Charge Measurement (not linear though) Good Precision for Time Walk Correction NINO = ASIC developed by CERN/MIC for Alice TOF Discriminator with ToT “proportional” to the Charge (at low amplitude) Proven technique, providing 50 ps resolution (IEE TNS Vol 51-5 (2004) 1974-1978) Very Cheap: 2 EUR/ch Drawback Requires Board development ! Cost: TDC + Discri. board production (~50 EUR/ch) PMT NINO TDC Rising edge + Trailing edge Time Measurement Trigger Logic Width ~Charge Feb 2006 Jean-Sébastien Graulich

Jean-Sébastien Graulich Plan Options 1. and 2. Will be tested in June/July at BTF Additional Test with TDC CAEN V775 to allow comparing with previous results (HARP) Options 3. and 4. are under investigation Feb 2006 Jean-Sébastien Graulich