CIRSGSFC 26-28 April 2004 dej-1 CIRS Instrument Overview CIRS Team Meeting Observatoire de Paris - Meudon April 26 – 28 2004 CIRS Instrument Group presented.

Slides:



Advertisements
Similar presentations
Aqua MODIS Cold FPA Performance and Operation MODIS Characterization Support Team (MCST) April 25, 2012.
Advertisements

NAIC-NRAO School on Single-Dish Radio Astronomy. Arecibo, July 2005
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Solar System Objects.
2 - 1 WCRP Denver 2011 Measurement of Decadal Scale Climate Change from Space Marty Mlynczak, Bruce Wielicki, and David Young NASA Langley Research Center.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
Doppler Wind and Temperature Sounder: A breakthrough technique GATS Proprietary Larry Gordley, GATS Inc. Dave Fritts, GATS Inc. Tom Marshall, GATS Inc.
GWDAW-8 (December 17-20, 2003, Milwaukee, Wisconsin, USA) Search for burst gravitational waves with TAMA data Masaki Ando Department of Physics, University.
A rough guide to radio astronomy and its use in lensing studies Simple stuff other lecturers may assume you know (and probably do)
Lesson 7: Remote Sensing Dr Andrew Ketsdever MAE 5595.
CIRS Ring Observations: Submm, Temp and Stellar Occultations Linda Spilker, Scott Edgington, Rich Achterberg, Stuart Pilorz, Shawn Brooks April 26, 2004.
CIRS Data Archiving Status Presentation to the Cassini CIRS Team Meudon, France - April 2004 Conor A Nixon (University of Maryland) Mike Flasar (NASA GSFC)
Rachel Klima (on behalf of the MASCS team) JHU/APL MASCS/VIRS Data Users’ Workshop LPSC 2014, The Woodlands, TX March 17,2014 MASCS Instrument & VIRS Calibration.
A. Ealet Berkeley, december Spectrometer simulation Note in ● Why we need it now ● What should.
Burst noise investigation for cryogenic GW detector TITECH NAOJ Daisuke TATSUMI 2nd Symposium ‐ New Development in Astrophysics through Multi-messenger.
J.M. Wrobel - 25 June 2002 PROPOSALS 1 PROPOSAL WRITING TUTORIAL Outline 30 minutes: Lecture on Generic Issues 60 minutes: Small Groups Write Proposals.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/15/2012Preliminary Design Review.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Thermal Infrared Multispectral Mapper Computer Model of the Experiment It is a model of the EXPERIMENT, it is not a model of the DEVICE Special models.
Solar observation modes: Commissioning and operational C. Vocks and G. Mann 1. Spectrometer and imaging modes 2. Commissioning proposals 3. Operational.
STIS Closeout Plan Paul Goudfrooij 2005 HST Calibration Workshop, 10/26/2005.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
14 October Observational Astronomy SPECTROSCOPY and spectrometers Kitchin, pp
Infrared Interferometers and Microwave Radiometers Dr. David D. Turner Space Science and Engineering Center University of Wisconsin - Madison
PACS Page 1 NHSC Data Processing Workshop – Pasadena Sept 10-14, 2012 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
SPIRE Consortium Meeting La Palma, Oct. 1 – SPIRE FTS Pipeline Trevor Fulton Blue Sky Spectroscopy, Lethbridge, Canada.
Long-term monitor on Mrk 421 using ARGO-YBJ experiment S.Z Chen (IHEP/CAS/China, On behalf of the ARGO-YBJ collaboration  1. Introduction.
18 October Observational Astronomy SPECTROSCOPY and spectrometers Kitchin, pp
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
6/11/2012 Building on NEAT concept - M. Gai - INAF-OATo 1 Building on NEAT concept M. Gai – INAF-OATo (a) Extension of science case (b) Payload implementation.
Transit Spectroscopy w/ WFC3 March 11, 2014 Avi M. Mandell NASA GSFC Collaborators: Korey Haynes Evan Sinukoff Drake Deming Adam Burrows Nikku Madhusudhan.
Rings Node Migration Plan Mark & Mitch PDSMC, UCLA November 28-29, 2012.
CE 401 Climate Change Science and Engineering solar input, mean energy budget, orbital variations, radiative forcing January 2012.
Gamma-Ray Bursts observed with INTEGRAL and XMM- Newton Sinead McGlynn School of Physics University College Dublin.
 a mathematical procedure developed by a French mathematician by the name of Fourier  converts complex waveforms into a combination of sine waves, which.
Final Presentation By Matthew Lewis 17 th March 2006 “To Determine the Accuracy that GOES True Numbers can Reproduce the Full X-ray Spectrum of the Sun”
1 Leonardo Pinheiro da Silva Corot-Brazil Workshop – October 31, 2004 Corot Instrument Characterization based on in-flight collected data Leonardo Pinheiro.
FTS Test Definition Summary Kaley Walker Test Readiness Review January 29, 2003.
COST 723 Training School - Cargese October 2005 OBS 3 Radiative transfer for thermal radiation. Instruments Bruno Carli.
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
CALVA : A test facility for Lock Acquisition F.Cavalier 1 on behalf of CALVA team : M.-A.Bizouard 1, V.Brisson 1, M.Davier 1, P.Hello 1, N.Leroy 1, N.Letendre.
The Very Small Array Angela Taylor & Anze Slosar Cavendish Astrophysics University of Cambridge.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
The Australia Telescope National Facility Ray Norris CSIRO ATNF.
Cosmic rays at sea level. There is in nearby interstellar space a flux of particles—mostly protons and atomic nuclei— travelling at almost the speed of.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
Implementation and Processing outline Processing Framework of VIIRS instrument monitoring System Processing Framework of VIIRS EV data Monitoring SD/SDSM.
NHSC SPIRE Data School – Pasadena 28 th - 30 th June 2010 PACS page 1 SPIRE Imaging Fourier Transform Spectrometer (FTS) Pipeline Data Processing Nanyao.
VIIRS Product Evaluation at the Ocean PEATE Frederick S. Patt Gene C. Feldman IGARSS 2010 July 27, 2010.
Kinetic Temperature Retrievals from MGS TES Bolometer Measurements: Current Status and Future Plans A.A. Kutepov, A.G. Feofilov, L.Rezac July 28, 2009,
The Critical Importance of Data Reduction Calibrations In the Interpretability of S-type Asteroid Spectra Michael J. Gaffey Space Studies Department University.
GSFC/Spinhirne 03/13/2002 Multispectral and Stereo Infrared Cloud Observations by COVIR (Compact Visible and Infrared Imaging Radiometer) J. Spinhirne,
MPI Semiconductor Laboratory, The XEUS Instrument Working Group, PNSensor The X-ray Evolving-Universe Spectroscopy (XEUS) mission is under study by the.
XRT SOT Alignment DeLuca With comments from Tarbell & Metcalf 21-Jan-2006.
ISUAL Design Concept S. Mende. SDR 7 Jun NCKU UCB Tohoku ISUAL Design Concept S. Mende Sprite Example Sprite Image obtained by Berkeley/NCKU 1999.
MEx and VEx DATA WORKSHOP - PFS and SOIR experiments - 27 June - 1st July 2011, ESA/ESAC,Spain.
An Experimental Approach to the Prediction of Complete Millimeter and Submillimeter Spectra at Astrophysical Temperatures Ivan Medvedev and Frank C. De.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
Pre-launch Characteristics and Calibration
TEMPO Instrument Update
E. Ponce2-1, G. Garipov2, B. Khrenov2, P. Klimov2, H. Salazar1
COS FUV Flat Fields and Signal-to-Noise Characteristics
CALET-CALによる ガンマ線観測初期解析
VIRTIS Operations at Lutetia
Image Stabilization System (ISS)
Chapter 35-Diffraction Chapter 35 opener. Parallel coherent light from a laser, which acts as nearly a point source, illuminates these shears. Instead.
Instrument Considerations
SLAC DOE Program Review
Early calibration results of FY-4A/GIIRS during in-orbit testing
HMI Top Level Requirements
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

CIRSGSFC April 2004 dej-1 CIRS Instrument Overview CIRS Team Meeting Observatoire de Paris - Meudon April 26 – CIRS Instrument Group presented by Don Jennings CIRS Instrument Overview

CIRSGSFC April 2004 dej-2 Instrument Operations/Performance Overview

CIRSGSFC April 2004 dej-3 Instrument Operations/Performance Overview  All aspects of instrument performance and functional operations working well – Thermal stability, lasers, interferometers, cooler, arrays  Performance re calibration parameters (response, instrument emission, NESR) essentially same as measured during ground testing in the instrument development phase  Instrument performance was fully checked in 24 hr calibration test Sept Includes array’s performance at 5 focal plane temperatures. Results posted to WEB.  Saturn approach phase C43 sequence covers Feb 20 – April 1, 2004; Saturn angular diameter less than 2.5 mrad

CIRSGSFC April 2004 dej-4 C43 - Optics Assembly Temperatures

CIRSGSFC April 2004 dej-5 C43 – Primary Mirror Temperatures

CIRSGSFC April 2004 dej-6 C43 – OA Operational Heater Powers

CIRSGSFC April 2004 dej-7 C43 - Cooler FPA Temperatures

CIRSGSFC April 2004 dej-8 FP1 Chronological Response Summary - Unapod

CIRSGSFC April 2004 dej-9 FP3_5 Chronological Response Summary - Unapod

CIRSGSFC April 2004 dej-10 FP4_6 Chronological Response Summary - Unapod

CIRSGSFC April 2004 dej-11 Saturn Calibration Status

CIRSGSFC April 2004 dej-12 Saturn – ISS Image 12 Mar 2004

CIRSGSFC April 2004 dej-13 Saturn Calibration – Calibration Data Acquisition Guidelines  FPA Setpoint Temperature: Run at lowest temperature possible for maximum sensitivity of FP3 and FP4 arrays. In approach phase, running mainly at 75.5K, plus occasionally at 76.3K. Need to get through first few orbits for full test of environmental fluxes on cooler before trying to standarize on one base FPA temperature. For reference, Jupiter FPA temps were 76.3, 77.0, 77.7K.  Acquire adequate deep space and shutter calibration data within given science sequences. Essential if instrument is not in full thermal equilibrium due to sun on instrument radiators, etc.

CIRSGSFC April 2004 dej-14 FP3: Avg Response and Instrument Emission for Ten Detectors

CIRSGSFC April 2004 dej-15 FP3: NESRs for Average of All Ten FP3 Detectors

CIRSGSFC April 2004 dej-16 FP4: Avg Response and Instrument Emission for Ten Detectors

CIRSGSFC April 2004 dej-17 FP4: NESRs for Average of All Ten FP4 Detectors

CIRSGSFC April 2004 dej-18 Saturn Calibration – Calibration Datasets Three types of calibration data:  DSCALs – Specific calibration sequences of 3 – 6 hrs duration, obtained during downlinks (usually rolling).  Internal to science sequence – Deep space and shutter closed data obtained within a science sequence.  Shutter closed data only – Serves as a relative monitor of internal optics assembly temperature changes. Can not directly be used in calibration without associated deep space data

CIRSGSFC April 2004 dej-19 Pipeline Status – Changes Needed for “Routine” Automated Calibration  Saturn calibration presently frozen. Need following changes:  S/C Navigation Data – Finish algorithms for automated nav data acquision from JPL, and automated conversion to Vanilla parameters. This data is a prerequisite to calibration; s needed to establish deep space spectra within a science sequence. For Jupiter, the criteria was that all data more than two fov’s from the edge of a target was deep space. This criterion needs to be reviewed for Saturn, rings, Titan, icy satellites. Work is needed to identify the deep space spectra within the rings sequences.  Calibration algorithm for FP3 and FP4 arrays – Modify algorithm in order that calibration is accomplished with science and calibration data obtained with the same FPA temperature, pixel combination, coadd/noadd, RTI. This criterion is most troublesome for 0.5 cm -1 data; may need to go 1-2 months either side of the science data to achieve this. Only part of this was implemented for Jupiter.

CIRSGSFC April 2004 dej-20 Pipeline Status – Changes Needed for “Routine” Automated Calibration (Con’t)  Calibration data blocks – Establish the minimum number of deep space spectra needed for averaging a calibration data block plus the time period needed to acquire this block.  Spikes (8 Hz, 1/2 Hz, others?) – Most relevant to 400 and 224 RTI data. Too many spikes, amplitudes too large, some durations large (3- 5 words). Calibrated spectra not really useable. Lower resolution data may be ok to first order. Spikes preventing us from reaching detector noise level.  Sine wave interference in FP1. Variable in frequency and intensity. Frequency varies with electronics temperature; range is cm -1, usually below 100 cm-1.

CIRSGSFC April 2004 dej-21 Change in Spike Period

CIRSGSFC April 2004 dej-22 Saturn Observed Spectrum FP3_5 – March 2004

CIRSGSFC April 2004 dej-23  Saturn Obs Spec FP3_5 – March 2004, with noise

CIRSGSFC April 2004 dej-24 Saturn Obs Spec FP3_5 – March 2004, with noise

CIRSGSFC April 2004 dej-25 Saturn Ring Spectrum (from Conor Nixon)

CIRSGSFC April 2004 dej-26 Saturn Observed Spectrum FP4 – 14 Feb 2004

CIRSGSFC April 2004 dej-27 Saturn Observed Spectrum FP4_6 – March 2004

CIRSGSFC April 2004 dej-28 Interference in Co-add Interferograms

CIRSGSFC April 2004 dej-29 Interference in No-add Interferograms

CIRSGSFC April 2004 dej-30 Jupiter Calibration Status

CIRSGSFC April 2004 dej-31 Jupiter Calibration Status  Spectral calibration accomplished.  Global calibration of FP1 awaiting pipeline implementation.  Global calibration of FP3 in progress.  Changes in pipeline calibration algorithms were needed for both Jupiter and Saturn. Will now be implemented for Saturn first.  Little to no work on Jupiter calibration in last 3-4 months. Lower priority than tour programming changes in health and safety, tour data handling programming, preparation of approach phase calibration sequences, monitoring of downlinked approach phase data.

CIRSGSFC April 2004 dej-32 Sine Wave Interference  Sine wave was missed during Jupiter encounter. Seen when we examined individual Saturn interferograms.  Originally seen in ICO 1. Always present at some level.  Varies in frequency between 600 and 0 cm -1 ; usually below 100 cm - 1. Drifts with electronics temperature, but cause unknown.  Phase not correlated with ZPD (different from BIU spikes). Amplitude varies somewhat.

CIRSGSFC April 2004 dej-33 Sine Wave Interference (cont’d)  In Jupiter data, phase drift caused cancellation in large averages, so problem was not recognized.  Frequency approaches 0 cm -1 as electronics temperature stabilizes.  Adds spurious structure to cm-1 region.  Ideally, should be removed from individual interferograms in data reduction, possibly by fitting and removing.

CIRSGSFC April 2004 dej-34 Interference in FP1 at Jupiter

CIRSGSFC April 2004 dej-35 Sine Wave Frequency vs Electronics Temp

CIRSGSFC April 2004 dej-36 Electronics Temperature at Jupiter Sine wave Frequency (cm-1)

CIRSGSFC April 2004 dej-37