CONSTRUCTION PLANNING PLANNING WHAT CONTROL PLANNING PROCESS COSTRUCTION PLANNING CONSTN ACTIVITIES BAR CHART ARROW NETWORKG LOB CASHFLOW.

Slides:



Advertisements
Similar presentations
PEMBUATAN DASAR & ANALISIS DASAR.
Advertisements

Constructionsite Construction Procedure Ron Gatepain.
Planning & Monitoring. The Purpose of Planning and Monitoring To ensure that the project is produced on time, within the cost constraints and at the quality.
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Managing the Information Technology Resource Jerry N. Luftman
Analisis Kos-Faedah Rujukan: Hall, J.A Information systems auditing and assurance. Boston: South-Western College Publishing. (halaman: )
Minggu 1 Pengenalan Kepada Sistem Maklumat Berasaskan Komputer Copyright 2001, Prentice-Hall, Inc. Sistem Maklumat Pengurusan Ibrahim Mohamed Jab. Sains.
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
PERANCANGAN DAN PENGURUSAN PROJEK
Construction Procedure. Identifying potential site Initial site appraisal Initial feasibility study Discussion with statutory bodies Detailed feasibility.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
MultiMedia by Stephen M. Peters© 2002 South-Western Operations Management.
BCEN 1400 Introduction to Business
Dr. Hany Abd Elshakour 9/7/ :22 PM1. Dr. Hany Abd Elshakour 9/7/ :22 PM2 Engineering Project: Participants and Life Cycle.
Project Management HNC Computing 2000 Unit 8 Quality Management Prepared by S Hargrave.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Topic1b: Project Life Cycle
* * Chapter Nine Production And Operations Management Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management (1) Chapter 16, Part 1. Overview of Management 326 Operations and Operations Strategy Products, Processes, & Quality Operations Planning.
PROGRAMMING Frank Ellis B.Sc. ARSM Thursday 26th March 2015
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
EBS 339/3 Ekonomi Mineral ( Mineral Economics ) Pensyarah : Prof.Madya Dr. Eric Goh Dr.Syed Fuad Saiyid Hashim Jadual Waktu : Isnin 2.00 – 4.00 ptg Rabu.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Phases of construction
Network analysis Homework:
Systems Implementation,
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
Financing Land Development Projects
Project Activity and Risk Planning
DCE 3105: PENILAIAN LATIHAN Semester Pertama 11/12
BAB 2 PLANNING Objektif: Pengenalan kepada perancangan projek
TABLE OF CONTENT CONSTRUCTION MANAGEMENT PRACTICE
PEMBELAJARAN MASTERI.
C5011 CONSTRUCTION MANAGEMENT
Pengurusan Antarabangsa
DCE 3105: PENILAIAN LATIHAN Semester Kedua 10/11
PERANCANGAN, MEMBUAT KEPUTUSAN DAN KAWALAN
PEKELILING KEMAJUAN PENTADBIRAN AWAM
Pre-contract Planning and Practice
MODULE 3 : HARDWARE : MONITOR CORRECTIVE MAINTENANCE WORK
TEKNIK-TEKNIK PERANCANGAN PROJEK BINAAN
Pencapaian UTM berasaskan Balanced Scorecard (Januari-Mac 2016)
REKABENTUK RANGKAIAN MUDAH
MANAGEMENT AND ORGANISATION
PLANNING.
PERANCANGAN & PENILAIAN PROGRAM (FEM3303)
PENJAMINAN KUALITI MERUPAKAN PIAWAIAN UNTUK MENENTUKAN KUALITI PELAKSANAAN PA DAN PB MENGIKUT GARIS PANDUAN YANG DITETAPKAN.
CIS12-3 IT Project Management
Penyerahan & Pembentangan Perancangan Tugasan
BAB 2 PLANNING Objektif: Pengenalan kepada perancangan projek
Pengurusan Antarabangsa
Introduction DEFINATION :-
KONSEP PENGURUSAN KEWANGAN BAGI INSTITUSI PENDIDIKAN
Project Management CPM/PERT Professor Ahmadi.
Muhamad Shukri Saud PRODUCTION ORGANIZATION
Muhamad Shukri Saud PRODUCTION ORGANIZATION
DCE 3105: PENILAIAN LATIHAN Semester II 11/12
Struktur & Fungsi Struktur ialah cara bagaimana komponen berhubungan di antara satu sama lain. Fungsi ialah operasi komponen2 individu sbg sebahagian drpd.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Pengurusan Antarabangsa
Presentation transcript:

CONSTRUCTION PLANNING

PLANNING WHAT CONTROL PLANNING PROCESS COSTRUCTION PLANNING CONSTN ACTIVITIES BAR CHART ARROW NETWORKG LOB CASHFLOW

ECONOMIC SECTOR AGRI, MANUFACTRING SERVICES, TOURISM, CONSTRUCTION

SECTOR SOCIALS, POLITICS, ECONOMY, PUBLIC AND PRIVATE SECTOR, FINANCE CONSTRUCTION PROJECT

CONSTRUCTION PROJECTS TYPE OF PROJECTS, PUBLIC AND PRIVATE, FINANCE, PROJECT MANAGEMENT, TYPE OF PROCUREMENTS CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION INPUT/OUTPUT, CONSTRUCTION RESOURCES, BURUH, MESIN, BAHAN2 CONSTRUCTION PLANNING

CONSTRUCTION PLANNING PROJECT PLANNING, SITE PLANNING SCHEDULING, PROGRAMMING; BAR CHART ARROW NETWORKING LINE OF BALANCE (LOB) PRECEDENCE DIAGRAM CONTRACTORS CASHFLOW

PERANCANGAN “PERANCANGAN IALAH PROSES PEMBUATAN KEPUTUSAN TERDAHULU TERHADAP APA YANG PERLU DIBUAT DAN BAGAIMANA” K&R 478 IA MELIBATKAN MISSI KESELUROHAN, KENALPASTI PENYELESAIAN UTAMA, TENTUKAN OBJEKTIF, KEMBANGKAN POLISI, PROGRAM, PROSEDUR UNTUK MEMCAPAINYA. CIRI-CIRI: MASA DEPAN TINDAKAN PLAN TINDAKAN/PENCAPAIAN

FASA RAMALAN FASA PERANCANGAN FASA PELAKSANAAN DATA/ MAKLUMAT ASAS PERANCANGAN JGKA PANJANG JGKA SEDERHANA JGKA PENDEK KAWALAN/ MANTAUAN SEMAKAN PROSES PERANCANGAN

PERANCANGAN BINAAN IALAH PROSES PEMBUATAN KEPUTUSAN TERDAHULU TERHADAP AKTIVITI-AKTIVITI PROJEK BINAAN DAN CARA BAGAIMANA AKTIVITI2 TERSEBUT PERLU DIJALANKAN BAGI PENCAPAIAN OBJEKTIF PROJECK.

PERANCANGANKAWALAN/PEMANTAUAN PEMBETULAN SELEWENG PERANCANGAN DAN PEMBETULAN

BAR/GANTT CHART

NETWORK DIAGRAM

TAWARAN PROJEK BINAAN – SATU PROSES

CLIENT INTENTION LAND MATTERS ACQUISITION CONVERTION AMALGAMATION  MARKET STUDY  FEASIBILITY STUDY  DESIGN CONCEPT PENGURUS PROJEK JURUNILAI JRUUKUR TANAH JURUUKUR BAHAN ARKITEK PLANNER RESEARCHER

PENGURUS PROJEK JURUUKUR BAHAN ARKITEK PLANNER  DRAWINGS BILL OF QUATITIES SPECIFICATION RATES CALL FOR TENDER SUBMISSION OF TENDER EVALUATION OF TENDER AWARD OF CONTRACT

 LAYOUT PLAN  ARCHITECTURAL DESIGN  C & S DESIGN  DETAILINGS  M & E DESIGN  LANDSCAPE DESIGN  AUTHORITIES APPROVAL – o PLANNING – o SUB-DIVISIONS – o BUILDING DESIGNS – o STRUCTURAL DESIGN  M & E DESIGN PENGURUS PROJEK JURUNILAI JRUUKUR TANAH JURUUKUR BAHAN ARKITEK PLANNER RESEARCHER

 TAKE OVER SITE  MOBILIZATION OF RESOURCES – o MANPOWER – o CONSTRUCTION MATERIAL AND COMPONENTS – o CONSTRUCTION PLANT AND EQUIPMENT  ACTUAL CONSTRUCTION  PRACTICAL COMPLETION  OBTAINED O.C. PENGURUS PROJEK JURUUKUR BAHAN ARKITEK C & S M & E CONTRAKTOR

– HANDING OVER – DEFECT LIABILITY PERIOD (DLP) – FINAL ACCOUNT PENGURUS PROJEK JURUUKUR BAHAN ARKITEK C & S M & E CONTRAKTOR

COST TIME QUALITY SATISFACTION

PROSES PELBAGAI INPUT

BINAANLEPAS BINAAN PRA BINAAN

PERANCANGAN SEMASA TENDER PERANCANGAN PEMBINAAN PERSEDIAAN PEMBINAAN “FASA YANG MERANGKUMI BERMULANYA PENENTUAN HARGA DALAM SESUATU PROJEK OLEH KONTRAKTOR SEHINGGALAH TARIKH PENGAMBILALIHAN TAPAK OLEH KONTRAKTOR.”

SKOP KERJA: PERANCANGAN TAPAK PERANCANGAN BAHAN BINAAN PERANCANGAN TENAGA KERJA PERANCANGAN LOJI DAN PERALATAN PROGRAM KERJA PERANCANGAN KOS PERATURAN DAN UNDANG-UNDANG

MANAGING CONSTRUCTION RESOURCES MANPOWER MATERIALS AND COMPONENTS PLANT AND EQUIPMENT TIME MONEY

Materials What When Where CONSTRUCTION PRODUCTION INFORMATION THE PROSES

CONVERSION PROCESS OUTPUT INPUT

TYPE OF PLANT COMPRESSOR DELIVERY TRUCK TOWER CRANE EXCAVATOR LORRIES MONTH REMARKS PROVIDE WTH N METRES OF HOSE AND 2 GUN MAINTAIN IN 6 MONTH MOBILE CRANE TO OFFLOAD + FITTER TO ASSEMBLE HIRED IN FROM ABC CO. HIRED FROM ABC CO. A TYPICAL PLANT SCHEDULE

Analysis Of M/power Requirement Investigation Of Sources Utilisation On Site Operating Within The Law MANPOWER SCHEDULE

TYPE OF M/POWER TECHNICAL STAFF GENERAL WORKERS BRICKLAYER CONCRETOR SCAFFOLDERS MONTH REMARKS OWNED OWNED WORKERS SUB-CONTRACTOR HIRED IN FROM XYZ CO. HIRED FROM ABC CO. A TYPICAL MANPOWER SCHEDULE

PROGRAMMING AND SCHEDULING TECHNIQUES: BAR CHART ARROW NETWORKING CRITICAL PATH METHOD PRECEDENCE DIAGRAM RESOURCE AGGREGATION & LEVELLING LINE OF BALANCE

PROGRAMMING AND SCHEDULING TECHNIQUES: COMPUTER SOFTWARES: MICROSOFT PROJECT PRIMAVERA