1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu851280672230247 L12pd000672230247 L12su000672230249.

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the TOB Group Tracker General Meeting December 7, 2005 Slides.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the illustrious TOB Group Tracker General Meeting October 26,
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Brussels Gantry Ê Problems with vacuum chambers in plate 4 mostly solved by the workshop in Aachen (thanks) Ë Problem with rotation motor (U-motor) 4 motor.
Status Brussels GANTRY
Hybrid & Module Testing Status
US Module Production Status
Vienna Module Production
FNAL Module Testing Status
TEC Module Production Overview
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
FNAL Module Testing Status
Module Production in Brussels
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
Module Production in Brussels
Module Testing Status Week of 6/14-6/20.
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
Operations/Failure Analysis
FNAL Hybrid Testing Status
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Wirebonding UCSB FNAL Machines
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
FNAL Hybrid Testing Status
Presentation transcript:

1 UCSB Module Assembly Week of 5/9-5/13

2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su L12sd L34pu ~1002 L56p /49~1002 R5N163031pr248 pr06 R5S95031pr248 pr03 R pr0258 R pr101pr198

3 UCSB Module Assembly – Mech. Specs. Weekly Cumulative ABFABF% A or B L12pu % L12pd % L12su % L12sd % L34p % L56p % R5N % R5S % R % R % Total %

4 UCSB Module Assembly Problems Past Week –U-motor E-stopped twice while picking up the hybrid from the supply position during one day. Has been fine since. –High point on TEC R5N module because much extra work and limited production on Friday the 13 th. –400 storage plates are in production. Should be done by the end of the week.

5 Wirebonding This Week –Bonding kept up with production on a daily basis. – No significant problems encountered.