1 UCSB Module Assembly Week of 5/9-5/13
2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su L12sd L34pu ~1002 L56p /49~1002 R5N163031pr248 pr06 R5S95031pr248 pr03 R pr0258 R pr101pr198
3 UCSB Module Assembly – Mech. Specs. Weekly Cumulative ABFABF% A or B L12pu % L12pd % L12su % L12sd % L34p % L56p % R5N % R5S % R % R % Total %
4 UCSB Module Assembly Problems Past Week –U-motor E-stopped twice while picking up the hybrid from the supply position during one day. Has been fine since. –High point on TEC R5N module because much extra work and limited production on Friday the 13 th. –400 storage plates are in production. Should be done by the end of the week.
5 Wirebonding This Week –Bonding kept up with production on a daily basis. – No significant problems encountered.