1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.

Slides:



Advertisements
Similar presentations
Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
Advertisements

1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
January 6. January 7 January 8 January 9 January 10.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
Magnetic measurements of MICE target stator Ben Shepherd MICE target meeting 11 October 2010.
Magnetic Measurements of MICE Stators & PMs Ben Shepherd MICE Target Workshop RAL, 13 December 2011.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Particle ID in the MICE Beamline MICE Collaboration Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
On MICE Coordinate System Yury Ivanyushenkov RAL.
MERIT Beam Collimator Design Nicholas Olesen 9 August 2006.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
TJR 10/30/031 MICE Beam rates Tom Roberts Illinois Institute of Technology 10/30/03.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
MICE Magnetic forces James Rochford Elwyn Baynham AFC working group meeting RAL 23 April 2004.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
1 Fringe fields for stage V Iouri Ivaniouchenkov, Jim Rochford RAL MICE Video Conference, 9 April 2003.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
March 24th 2010MICE CM26 - Riverside1 Beam Line Paper m. apollonio – Imperial College.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
TJR 7/30/031 Geant4 Simulations of the MICE Beamline Tom Roberts Illinois Institute of Technology 7/30/03.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Solenoid Magnetic Field Measurement. MICE solenoid includes 5 coils First solenoid expected at FNAL for magnetic field measurements in April Measurements.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Applied Science Division MICE Prototype Control System T W Bradshaw April 2004 MICE Proto Control System Organisation.ppt.
1 Effect of staging on module connection and support arrangement Yury Ivanyushenkov RAL.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
Walaron Diagnostics MICE Collaboration Meeting Berkley 9/2/ Beamline Diagnostics Kenny Walaron University of Glasgow / RAL.
MICE Control Issues Paul Drumm ~ Monday August 1 st 2004.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
1 MICE Hall Layout MICE Collaboration Meeting, LBNL, February 12, 2005 Paul Drumm for Yury & the RAL team.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
Project manager report paul drumm CM16 October 2006.
Experimental Setup of the H8-RD22 Experiment Massimiliano Fiorini (on behalf of the H8-RD22 Collaboration) University of Ferrara – INFN Ferrara CARE HHH.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
1 Forces Yury Ivanyushenkov RAL. 2 Goal: find maximal (static and dynamical) possible forces in MICE magnetic system. Method: calculation of axial magnetic.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 Beam and Target Issues Chris Booth 5 th May 2004.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
a b Center at( h,k ) An ellipse with major axis parallel to x -axis c Definition.
1 Search for Worst-Case Forces MICE Video Conference, September 8, 2004 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department,
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
STFC’s National Laboratories Round Table on Synergies and Complementarity among Laboratories John Womersley Chief Executive, STFC 13 th Pisa meeting on.
The reading is 7.38 mm. The reading is 7.72 mm.
Magnet cryogenic system update.
Accelerator R&D for Future Neutrino Projects
Introduction to ASTeC Programmes
CLEX* Status and Plans CTF3 complex CLEX
Alain Blondel 11 October 2010 GDR NEU2012 summary
Completing the Step IV Programme
Alain Blondel. EUCARD meeting NEU April 2010
Literacy Research Memory Skill Practice Stretch!
Magnetic gap calculation
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
66th ISOLDE Collaboration Committee meeting
MERIT Beam Collimator Design
Presentation transcript:

1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004

2 MICE Layout MICE Collaboration CERN, 29 March - 2 April 2004

3 MICE Coordinate System: Definition Centre of ISIS ring (0, 0, 0) MICE target (X T, Y T, Z T ) MICE beam axis (X B, Y B ) MICE apparatus reference point (X M, Y M, Z M ) Coordinate system: centre is located in the centre of ISIS ring at the beam level axis Z is parallel to the MICE beam axis axis Y is vertical ISIS ring (Y = 0 mm) (0,0,0) Z MICE Target (X T, Y T, Z T ) MICE Beam Axis (X B, Y B ) Centre of ISIS accelerator ring at the beam level MICE Apparatus MICE Reference Point (X M, Y M, Z M ) X MICE Collaboration CERN, 29 March - 2 April 2004 MICE Apparatus Local Coordinate System

4 MICE Stages MICE Collaboration CERN, 29 March - 2 April 2004

5 Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 MICE Reference Point & MICE Stages Reference point = Centre of the central absorber MICE Collaboration CERN, 29 March - 2 April 2004

6 Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 MICE Reference Point & MICE Stages (2) Reference point = Beam diffuser MICE Collaboration CERN, 29 March - 2 April 2004

7 MICE Reference Point: Proposal MICE Collaboration CERN, 29 March - 2 April 2004 ZMZM XMXM MICE Reference Point Reference point = Any convenient visible point in between beam line magnets