GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 3 of 12 SE Overview 1 GLAST Large Area Telescope LAT Pre-Shipment Review Systems.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST Large Area Telescope:
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectDOE/NASA Stratus Review, March 30 & 31, 2004 Systems Engineering 1 GLAST Large Area Telescope: Pat Hascall SLAC System Engineering Manager.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectGSFC Monthly, 24 May 2005 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Systems Engineering Bob Goeke.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Introduction and Overview
GLAST Large Area Telescope:
Overview Cost to Complete
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 2 Topics Action Item Status Technical Baseline Management Issues Interface Control Documentation RFA Closure Key Metrics Risk Management

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 3 Monthly Action Item Status Action Item IDActioneeDescriptionStatus B. Estey Define and maintain the production readiness/execution plan to include vendor selection and associated schedule to ensure unit availability dates are met OPEN: Draft production plan completed & provided to GSFC. Refinement required as vendors are selected. Update provided early December, Next update and process for update: TBD. Schedules for TEM/TPS provided to B.Graf, action to be closed when similar schedules are provided for the rest of the boxes. Harness schedule provided. SIU/EPU expected Jan 19, Heater Control Box expected Jan 26.

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 4 Technical Baseline: Flight Drawing Release Status details (DAQ reported separately) –Tracker 141 of 141 completed (total is 15 over original plan) –ACD One assembly drawing remains, no impact to delivery –Mech Completed 61 of 81 (total is 22 part over original plan) 16 MLI drawings pending interface resolution with S/C –Design Integration Major drawings: 1 of 6 signed off

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 5 Technical Baseline: DAQ Flight Drawing Release Group Total In Config Control To Go In Sign offNotes TEM/TPS48 0 PDU34 0 GASU to close with FPGA docs EPU/SIU to close with FPGA docs Harness Brackets/hardware Heater Control Box21120

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 6 Issues

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 7 Issues (continued)

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 8 Interface Management

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 9 Interface Document Status SC-LAT ICD ICN Status –LAT signed this month ICN-80 LAT Power-Off Message Length ICN-83 SOW Reference in LAT ICD ICN-84 LAT SIIS PPS Accuracy ICN-85 LAT Analog Sampling Rate –Currently under signature review None –Currently in draft or revision None Internal LAT ICD’s –Signed Off TKR-LAT Electrical ICD –Currently in signature review TKR-LAT Mech, Therm ICD –Currently in update Electronics-LAT ICD (Comments being incorporated as they are received) CAL-LAT ICD

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 10 GFE Deliverables/Receivables LAT GFE Deliverables –Dec: None –Jan: ISIS –Feb: None Scheduled –Mar: None Scheduled LAT GFE Receivables –Dec: SC-LAT Test Flexures –Jan: SIIS –Feb: None Scheduled –Mar: None Scheduled

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 11 RFA Closure 37 CDR RFAs total, submitted 36 answers –Radiator MGSE response – have preliminary information from vendor that the margins are positive. Waiting for analysis. Peer review RFAs –177 pre CDR RFAs, one outstanding Draft ACD handling plan for blankets in subsystem review –21 post CDR RFAs, 1 outstanding X-LAT thermal test approach – answer drafted and passed by NASA. One additional analysis required to close.

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 12 Key Design Metrics

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 13 LAT Mass Status

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 14 LAT Power Status Calorimeter CR approved to change allocation to 67W

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 15 LAT Power Status (Continued) Survival Power

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 16 FSW Resource Usage Current Estimates ResourceTotal AvailableCurrent Usage Margin Factor EPU Boot PROM256 kB128 kB2 SIU Boot PROM256 kB128 kB2 EPU EEPROM6 MB1.5 MB4 SIU EEPROM6 MB MB3 EPU CPU cycles200% in 2 EPUs30%> 6 SIU CPU cycles100% in 1 SIU25%4 EPU memory128 MB16-32 MB4-8 SIU memory128 MB< 16 MB8

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 17 Instrument Bandwidth Resources ResourceMax Total BW limited by Hardware Max limited by SC- ground transmissi on Ave current BW at 10 KHz max trigger rate* Ave current BW at 2 KHz nominal trigger rate* Margin Factor (for 10 KHz rate) Detector to GASU-EBM45N/A GASU-EBM to EPU-CPU20N/A514 EPU-CPU to GASU-EBM *0.02*2 GASU-EBM to SIU-CPU *0.015*2 SIU-CPU to Spacecraft *0.015*2 EBM: Event-Builder Module EPU: Event-Processing Unit SIU: Spacecraft Interface Unit LAT communication, bandwidth (BW) in Mbyte/sec * Present performance of event filter for EPU- CPU, still being optimized. Eventually the physics filter will be adjusted/loosened to take advantage of the max average bandwidh

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 18 Key Science Performance Metrics

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 19 Risk Management

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 20 Risk Management Activity No new risks identified this month

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 21 Top risks ID #Risk Rank Risk DescriptionRisk MitigationStatus Proj Mgt Moderate If completion of Tracker subsystem qualification is delayed due to EM or MCM electronics closure; then start of LAT I & T and schedule will be impacted Manufacturing Eng assigned to close MCM issues Increased team integration with Italian partners GSFC audit/support to Tracker EM closure Consider second source for tray and flex cable production Restructured SLAC engineering support Additional INFN support in place Have 3 proposals for trays, downselect shelved. Identified second source (Titan), development cables in work. Evaluating design mod to simplify production Proj Mgt Moderate If ASICs fail to meet qualification requirements; then schedule impact will occur Focused review & test. Margin for re-runs protected where possible Individual risks Identified by subsystem Extensive use of DAQ test bed to drive out system issues Cal/ACD ASIC’s continued testing Test Bed operating No new issues Proj Mgt Moderate If TEM Power supply fails qualification; then final implementation may exceed schedule impacting delivery to I&T Key focus item identified for DAQ TEM/PS extensive EM use as EGSE Implementation plan in place and proceeding Fuse audit completed First article flight boards December

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 22 Top risks ID #Risk Rank Risk DescriptionRisk MitigationStatus SE-007Moderate If a critical component fails post LAT integration; then de- integration will result in cost & schedule impact Extensive use of EM test bed to support flight H/W & S/W development Thorough qualification and acceptance tests Pre planned I&T actions for de- integration Qual & acceptance planning in-place I&T developing re- work contingency plans. Integration plan baselined Elec- 004 Moderate If target hardware, requirement development or manpower is delayed; Then Flight-Software development schedule will be impacted Detailed incremental development program Ensure sufficient software test on target hardware during development to drive out any requirement disconnects. Include adequate peer reviews before each spiral cycle prior to release Include monthly Demos to verify functionality/measure progress Adapting monthly demos Tracking EGSE resource utilization Hired FSW manager Successful FSW review on 16 September Continuing monthly demos Updated detailed test plan released

GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 23 Top risks ID #Risk Rank Risk DescriptionRisk MitigationStatus Proj Mgt Moderate If parts and vendor orders are delayed or bids exceed expectations; then flight production costs & delivery schedule will be impacted Manufacturing engineer added to expedite minimum cost closure Clarification and purchase package review to ensure accurate bids Increase production management staff Purchase order tracking/monitoring system in place to highlight roadblocks Design documentation release plan prioritized by vendor selection and component fabrication need dates Workarounds implemented for late parts Hired additional head to manage production IT Moderate If logistic or facility integration issues are found during LAT environmental test program; then re-work will delay schedule LAT I&T to plan a roadmap of activities from LAT building 33 to completion of environmental testing LAT I&T to consider and develop opportunities to path find key activities required prior to LAT shipment to NRL Follow up Environmental Planning TIM held on 1 October at SLAC, I&T driving AIs to conclusion Continuing periodic TIMS