SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Advertisements

1 Background: Use of TKR Trigger One-Shots individual TKR strip channels “true” when analog shaped pulse is above threshold. strips in a plane are OR’d.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
SVACInstrument Analysis Meeting, October 7, 2005 Anders W. Borgland 1 CAL Calibrations And High Energy Muon Gain Anders W. Borgland Science Verification,
SVAC/ISOCInstrument Analysis Meeting, April 14, 2006 Anders W. Borgland 1 The LAT In Every Which Way You Want It! Anders W. Borgland Science Verification,
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 1 Instrument Analysis Activities Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectTrigger Scheduler, Engines, and Rates 6 Feb 2006 J. Eric Grove Naval Research Lab Washington DC Trigger Scheduler, Engines, and Rates.
SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Summary and Future Plans Eduardo do Couto e Silva Instrument Analysis.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
SVAC/ISOCInstrument Analysis Meeting, April 21, 2006 Anders W. Borgland 1 LAT Data taking! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project Managers F2F 6/15/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT ProjectIA Meeting – June 17,2005 E. do Couto e Silva 1 New additions to the main page.
SVACInstrument Analysis Meeting, January 13, 2006 Anders W. Borgland 1 Data Is (Nearly) Here! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
SVACInstrument Analysis Meeting, September 23, 2005 Anders W. Borgland 1 GEM Discarded Events Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
SVACInstrument Analysis Workshop IV Quatorze Juillet, 2005 Anders W. Borgland 1 Overview of Data Taking Anders W. Borgland Science Verification, Analysis.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
Sep/26/05Trigger test plan Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST LAT ProjectInstrument Analysis Workshop, June 2004 J. Eric Grove Naval Research Lab Washington DC Gamma-ray Large Area Space Telescope CAL Detector.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, February, 27, 2006 CAL features and idiosyncrasies. Alexandre Chekhtman NRL/GMU Gamma-ray Large.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Single-CAL Test and Calibration
GLAST Large Area Telescope Instrument Science Operations Center
Overview of Instrument Analysis Effort
Calorimeter calibrations with Flight Software.
Overview Goal Study GEM variables in SVAC ntuple
Imaging crystals with TKR
Mini Tower Preliminary Results
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST LAT System Engineering
LAT Environmental Test Planning and Design Review
Eduardo do Couto e Silva Feb 28, 2006
Studies of the Time over Threshold
Shaped Digital Readout Noise in CAL
SVAC Configuration Verification
CAL crosstalk issues and their implications
GLAST Large Area Telescope: I&T Test Readiness Review
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo

SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 2/7 The rationale for SVAC Data Taking Assumptions behind today’s proposal –Tests of 8 tower testing + ACD will be the last opportunity to take SVAC data before LAT is assembled –Remaining 8 towers will be delivered in “one bunch” »Most likely limited testing time: mostly LPT and CPT Reasons behind SVAC data taking requests –Study ACD before we use it to assess performance –ACD is a substitute for the muon telescope »discussions with Mike Huffer –Tests that address quality of data and can not easily be done in a testbed should have priority –Offline issues can be assigned lower priority »Even if Eduardo is freaking out… –Some tests are needed to address issues that have been presented in the Instrument Analysis Workshops –Some test are viewed as preparation for 45(?) days of system testing –After LAT Is fully assembled

SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 3/7 ACD performance and TKR readout redundancy (2 in 1 to save time) Objective –Verify that TKR readout redundancy does not affect hit/cluster multiplicity Method –Trigger on ACD –Not sure how much to prescale yet –Define a MIP in the CAL –Select muons –Compare TKR variables under different readout configurations Flight configuration for all registers –Just ACD_ROI1 allowed to trigger –ROI1: topological »ACD tiles shadow the towers underneath. »Configure the test for 8 towers »Side tiles are also allowed to trigger »May need to prescale »Need to sharpen the definition of ROI after discussions today –We need to look at MC right now Data Taking Runs –Read TKR from both sides –Read TKR from LEFT side only –Read TKR from RIGHT side only –Read TKR from RIGH, LEFT, RIGHT, LEFT,.... Data Taking Time –2 hours per run –need to verify that with MC muon For the time being avoid CAL_LE as a trigger but do not dismiss it, it is just to expedite the test CAL re-triggering needs to be understood if we want to use CAL_LE as a trigger E. Grove is writing a test plan (STR) for that Mike asked us to consider placing a muon telescope paddle underneath to use as a cross check

SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 4/7 Multiple Trigger Engine Test Objective –Verify functionality required for on- orbit operations Trigger Engine –Configure one trigger engine to Flight settings –Configure another trigger engine to CAL 4 range readout –autorange ACD –Should ACD participate in the trigger? –If so, need to prescale Data Taking Time –4 hours –If ACD does not trigger need to verify estimates based on existing data –If we decide ACD should trigger we need to verify time estimates with MC Snapshot of SVAC Config Report for current test runs Mike has already checked to some level that the digital functionality actually works (GEM tester) We recommend to still do that test but with lower priority compared to the ACD tests

SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 5/7 ACD “Inefficiency” test Objective –Verify what are the “holes” when the ACD is in VETO mode Register configuration –Flight –To study ACD performance ACD is set to VETO Data Taking Time –2 hours –It is a functionality test –Do we need a longer run? Muon to probe ACD inefficiency

SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 6/7 CAL runs (after discussions with E. Grove) Short runs –Full Mode High Energy Muon gain (10 min), similar to B13 (minus TEM diag.) –4 range, auto range –Unsuppressed –FLE ~ 100 MeV –FHE ~ 1 GeV –LE gain = 5 –HE gain = 0 –TEM Diagnostics disabled –Full Mode Flight Gain (10 min) –1 range, auto range –Unsuppressed –FLE ~ 100 MeV –FHE ~ 1 GeV –LE gain = 5 –HE gain = 15 (this is new) –TEM Diagnostics disabled This is to be compared to the solicited trigger tests which now is part of the CPT for pararellized tests done right before! If online is not ready we still want this test “Long” runs –Flight (1 h): Will become the new B2 –1 range, auto-range –Zero suppression (LAC=2 MeV) –FLE ~ 100 MeV –FHE ~ 1 GeV –LE gain = 5 –HE gain = 15 (this is new) –TEM Diagnostics disabled –Muon Calibration auto-range (15 h): Same as current B10 runs –4 range, auto-range –Zero suppression (LAC=2 MeV) –FLE ~ 100 MeV –FHE ~ 1 GeV –LE gain = 5 –HE gain = 0 –TEM Diagnostics enabled HE gain = 13 (saturates at 50 GeV) HE gain = 15 (saturates at 20% higher value) Level III(?) Spec now requires saturation >60 GeV

SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 7/7 Definition of ROIs ROI has to be adapted to 8 towers. –Some of the regions will have to be made much larger than for 16 towers: –To account for the fact that all the towers on the right side of the grid are not present. –Will also need special ROI: –Shadow the towers in the grid for TKR Right/Left readout test. –Coincidence between tiles on the sides (also for TKR Right/Left readout test).

SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 8/7 Summary 8 towers: –We will calibrate all the CALs with parallelized scripts –That is the plan –We will take the usual B2, B10 and B13 SVAC data runs. 8 towers + ACD: –We have proposed a certain number of runs: –They replace the usual B2, B10 and B13 SVAC runs. –Are there additional test runs you would like to see? Runs done differently? –This is the time to tell us!