W. Aalders FPU CDR 1-3 July 2003 HIFI 1 FPU CDR MCS HIFI MECHANISMS 1.Focal Plane Chopper (FPC) 2.Diplexer Rooftop Mirror Translator (DRT) 3.Pivot development.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
SXC meeting SRON, July 19-20, SXC meeting 19-20/07/2007 Alignment Positioning of mirror with respect to detector (internal). Positioning of total.
Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)1 First Stage Cryogenic IF Amplifier Carmen Diez.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
DM - COA Housing. DM - COA Housing with mirrors and alignment devices installed Alignment cubes Alignment devices Dummy chopper.
Development of the IF2 Chain for the FPU of the HIFI Instrument Alexander Megej July 1 st, 2003, Groningen.
 Design  Manufacturing  Recent X-Ray tests  Status Vadim Burwitz, Peter Friedrich on behalf of the eROSITA team.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Rotating Coils - Giordana Severino – Rotating Coils PACMAN meeting Printed Circuit Coils – Future developments.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
Applied Precision Design 1 of 8 Strictly Confidential HIGH TEMP ROTARY SPINDLE IN VACCUM MULTI-AXIS SHUTTER MECHANISM RELIABILITY CYCLING TEST-BED MECHANISM.
Mechanical Structure „Pi of the Sky” robotic telescope mgr inż. Robert Pietrzak mgr inż. Piotr Wawer mgr inż. Roman Wawrzaszek –
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
G.Barber: Mice-International Meeting Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
End of phase A meeting CNES (Toulouse) 2/02/2012 Ph. Gorodetzky APC - Paris Diderot1 Euso-balloon Lenses A)Design: - Alex Zuccaro (now at ESTEC) - Yoshiyuki.
The Active Optics System S. Thomas and the AO team.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
Optimisation of the PACS Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
Carlo Pagani University of Milano & INFN Milano - LASA WP8 Tuner Status & Perspective ILC-HiGrade Kick-Off Meeting DESY, Hamburg 29 August 2008 Material.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Leiden, 3 June 2002Consortium Meeting1 First Stage Cryogenic Amplifier IF1 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN.
Periscope Configuration
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Simbol–X workshopMay 14th, 2007 The Simbol-X Detector Payload P. Laurent CEA/Saclay & APC.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
FIELDS Fabrication Review Board FRB SearchCoil Magnetometer SENSOR S/N 4 Ferrite cores cracks P. LEROY 1MMS SCM FRB, 20 APR 2012.
Apr 29, 2003SSWG - CDR Comments1 PFIS Critical Design Review Comments Detailed response available in document SALT- 3100BP0011 (PFIS web site) Responses.
MPI Semiconductor Laboratory, The XEUS Instrument Working Group, PNSensor The X-ray Evolving-Universe Spectroscopy (XEUS) mission is under study by the.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
THEMIS INSTRUMENT SUITE
Feasibilty/Concept Study Mid Term Status Review
Planning Quality control - Manufacturing logbook Photos Conclusions
First Stage Cryogenic IF Amplifier
QPM delivers value over the life cycle of the product
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
APTM and GRID interface requirement PBIP and PBW
Main information on the «WORLD SPACE OBSERVATORY» project
Globus-M2 will be constructed by the end of 2015
Presentation transcript:

W. Aalders FPU CDR 1-3 July 2003 HIFI 1 FPU CDR MCS HIFI MECHANISMS 1.Focal Plane Chopper (FPC) 2.Diplexer Rooftop Mirror Translator (DRT) 3.Pivot development Presented by Wim Aalders

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders2 Focal Plane Chopper 1 DM to be delivered to the FCU-DM; 2 QM’sone to be delivered to the FCU-CQM, another to be subjected to long duration qualification tests 1 FM to be delivered to the the FCU-FM 1 set of critical spare parts (pivots, connectors, motor) to refurbish a QM to FM spare when necessary. During the development of the FPC there shall be:

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders3 FPC Requirements Functional Requirements Rotation of M6 from –4.8º to 8º Fast movement from –4.8º to 0º -3 to 0 arcmin at the sky 20 msec full amplitude change 5 Hz square, 80% duty cycle Slow movement from 0º to 8º i.e Calibration mode HBB & CBB

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders4 FPC Requirements Additional Requirements Positional accuracy: 1 arcmin (0.6 sky) Lifetime 10 8 cycles fast mode 10 5 cycles slow mode (i.e. calibration mode) Power consumption < 2 mW in fast mode < 3 mW in calibration mode

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders5 FPC Layout (DM)

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders6 FPC Layout (DM)

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders7 FPC Layout (DM)

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders8 FPC Layout (DM)

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders9 TESTS (on FPC-DM) Performance RT) –Angle vs current –Angle vs time Vibration RT) Cryo-performance –Health check

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders10 Rotation vs current

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders11 Rotation vs time

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders12 Vibration response (FPC DM)

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders13 Diplexer Roof top mirror Translator 1 DM type A to be delivered to the FCU-DM; 2 QM’stype A to be delivered to the FCU-CQM 6 FM’s type A to be delivered to the the FCU-FM 4 FM’s type B to be delivered to the the FCU-FM 1 FMtype A as a spare 1 FMtype B as a spare During the development of the DRT there shall be:

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders14 DRT Requirements Functional Requirements Translation of rooftop mirror of ± 150 µm Precision and stability 0.2 µm Power consumption < 0.5 mW Aperture > 15 mm Nominal Optical Pathlength Difference 12.5 mm for type A (channels 3,4 and 5) 20.8 mm for type B (channels 6-low and 6-high)

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders15 Translation principle

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders16 DRT Layout

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders17 Monolithic Roof top mirror

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders18 Roofmirror Fabrication Tool

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders19 DRT-QM#1

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders20 Detail

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders21 Hysteresis without ringing Sigma= 89.9 nm, FWHM=211.7 nm

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders22 Hysteresis with ringing Sigma= 63.4 nm, FWHM=149.2 nm

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders23 Mechanisms QM and FM schedule

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders24 DRT-QM AIV Schedule

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders25 DRT QM’s  Production Documents complete  Manufacturing complete  Assembly 90% finished  Alignment (TPD) August  Test Programme on time  Delivery Dec on time

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders26 DRT FM & SFM AIV Schedule

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders27 DRT FM  Parts production put out  Assembly Aug/Sep 2003  Test equipment adaptations  Testing on time  Delivery on time

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders28 FPC QM  Model (re)design complete  Manufacturing drawings  Manufacturing put out  Assembly is late  Test equipment adaptation  Qualification testing is late  Delivery is late

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders29 Planning Compilation

W. Aalders FPU CDR 1-3 July 2003 HIFI 30 Flexible PIVOT Development

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders31 Pivot requirements 1.Strength [N] 2.Fatigue resistance [N] 3.Torque rate [N.mm/rad]  Launch survival  Life time, cycles  Power and response time

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders32 Pivot Construction

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders33 Pivot Buckling

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders34 Pivot development (1) History TRW-Lucas Bendix Chromium steel 420 Used in balloon and ISO instruments Deemed risky for crystalline structure Inconel Bendix Specials Little guarantees for quality Too expensive

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders35 Pivot developments (2) Developments of other parties –BE-System (CNES, LAM): inadequate –Zeiss monolithic CuBe: inadequate SRON’s own development –Monolithic SS-304 version: abandoned –C-Flex CuBe welded/brazed Inconel brazed/brazed

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders36 Pivot selection

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders37 Inconel fully brazed

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders38 TC-1

HIFI FPU CDR 1-3 July 2003MECHANISMS W. Aalders39 TC-2