Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation.

Slides:



Advertisements
Similar presentations
2N Telekomunikace a.s. VoIP Products.
Advertisements

F-MAN OBT comms Status report Challenges, Issues …
Adding SMS functionality to WhatsUp Gold
Telefónica Móviles España WP3 meeting G Communication Infrastructure.
ActiveXperts Network Monitor Monitors servers, workstations and devices for availability Alerts and corrects.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
PulseHR Time and Attendance software development and coding web development, web hosting IT project management and consulting Str. Ghioceilor.
School On Track. Outlines Introduction Modules Advantages Future Expects Budget Support.
SBahn Database Management Tool Georgi Cholakov, Sam Joachim University of Plovdiv “Paisii Hilendarski”, e-Commerce Laboratory in cooperation with Humboldt.
WP3- Development: Milestone M3 Lisbon 30 January 2004 National Technical University of Athens.
Gateplus Time Attendance and Access Control System.
F-MAN Meeting 10/11 April 2003 EDC Presentation EDC  The TSM ground application OBT Centralised SMS hub  Communications Interface Issues & possibilities.
Figure 6-1: Transport Request Data Entities: CS: Customer OM: Order manager OPM: Operational manager FM: Fleet Manager MM: Maintenance manager OBT: On.
A first Demonstrator for a CAHN infrastructure Bluetooth in CAHN.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
ΑΝΝΕΧ 3 by SCIRO. Task 2.1 – Functional requirements definition Task 2.1 aims at drawing the functional analysis of F-MAN, starting from the users’ needs.
Kranjska Gora, Test plan - PI will test F-MAN tools on: - 2 types of wagons (Uacs, Himrrs) - 2 types of operation (timetable supervision.
1 SCIRO - Bled /09/02 WP2 Functional Requirements and Architecture External Functional Analysis (D4) & Internal Functional Analysis (contribution.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Octopus F-MAN FM OPM OM Standards and Norms Environment MM Wagons F2 F1 F3 Contractual data Wagons owner F4 F5 F6 F9 F7 F8 F10 F11 F12.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Maintaining and Updating Windows Server 2008
© Folens 2008 Transfer of data in ICT systems Using ICT networks.
Make your messaging reliable use it Messaging. A single and global solution Send, receive and process any type of message through the appropriate channel.
AVT2000D is a portable and compact in size magnetic installation vehicle tracking device which is easy in mounting and hiding to where there is the metal.
1 Highly confidential – do not distribute 360°SIMS – In Line System Main Components.
SMS Gateway OZEKI NG Document version: v Adding SMS functionality to SysAid.
History of Telematics, Telemetry, & M2M Technology
State of Delaware Department of Natural Resources and Environmental Control.
Final Design and Implementation
SMS Gateway OZEKI NG Document version: v Adding SMS functionality to Sharepoint.
Asset Management Solution for a Global Engineering Company.
Introduction Mobile Switch is a device which will be helpful to switch on and off any electrical/electronic devices through a SMS. The parameters of these.
IModus User Group 18 th September. Welcome Group Introductions Brand Update Mobilising iModus Introducing the new range Discussion - Mobilising your business.
Ben. Mapetese. Following the Centre’s Strategic Workshop in 2014 the Centre has increased the number of students from 465 in 2014 to 640 in 2015 – Targeting.
WP3 Semivirtual Campus Progress Report Petr Grygarek VSB-CZ.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
1 On Board Terminal  Technical characteristics  Functions  Messages  SIM requirements  Sensors for OBT  Installation.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Presentation by SNCF in 19/20 April 2004 Meeting in Kranjska.
Supervisory Control and Data Acquisition (SCADA) Software.
E-VLBI Software Suite & DRAGON Interoperability Chet Ruszczyk, Jason Soohoo.
Packet Analysis Fluke Protocol Expert & Misc Applications Brian D. Sterck.
Presented by : Team 11 Mathuvathanan M. Jayasinghe S. D. Luckshy S. T. Sujeetha L. Supervised by: Mr. Shantha Fernando Mr. Samantha Senarathne.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Paradox Communication Solution GPRS / GSM
SMS Module Model : SB-DN-SMS/IP Configuration of SMS Module.
Feb 2007WSN Training: XMesh Services1 Lab6 Objectives:  Route Control Interface  Understand XMesh transport services 1.Upstream 2.Upstream with end-to-end.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
INDRIYA TECHNOLOGIES PRIVATE LIMITED BELEIVING IN A SMARTER AND GREENER WORLD.
What is J2EE Platform The Java 2 Platform Enterprise Edition (J2EE) defines the standard for developing multitier enterprise applications.
HDL-MGSM.431. Description MGSM.431 is an automation module based on GSM monitoring and controlling. Being at a great distance you can operate a target.
Timesheet training Version: Introduction Duration: 1.5 hours Purpose: Guide on how to use Timesheet.
©Spectra Technovision (India) Pvt. Ltd.
 Introduction  Tripwire For Servers  Tripwire Manager  Tripwire For Network Devices  Working Of Tripwire  Advantages  Conclusion.
Event Management. EMU Graham Heyes April Overview Background Requirements Solution Status.
Lisbon, Report on OBT installations -50 OBTs and sensors to be installed on wagons: - 35 CP (sggmrss – flat wagon with 102 ton cargo capacity)
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
Maintaining and Updating Windows Server 2008 Lesson 8.
1 Copyright © 2008, Oracle. All rights reserved. Repository Basics.
ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.
IST 201 Chapter 11 Lecture 2. Ports Used by TCP & UDP Keep track of different types of transmissions crossing the network simultaneously. Combination.
Transfer of data in ICT systems
Internetworking JEOPARDY Discovery Module 5 K. Martin.
SAP Business One B1iF Training
EIN 6133 Enterprise Engineering
Serial Data Hub (Proj Dec13-13).
CIM Model Management in a Real-Time Environment Open Systems International, Inc. (OSI)
General Packet Radio Service (GPRS), 2 credits
Presentation transcript:

Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation

2 Task 3.1 Tracking Module  Results  TECNO is providing the OBT  EDC is developing the Centralised SMS Hub (GS)  EDC has provided the SIM cards to be integrated in the first 3 OBTs  SCIRO has defined the interface between the TM and the DPM (XML schema)  SCIRO has defined the Event Messaging procedures  Problems  TECNO should clarify how to manage the OBT installation and configuration and the related SMS messages and procedures  TECNO should provide “how to use OBT functionalities” and SMS message examples  EDC has complete and integrate with the DPM The centralised SMS Hub  The Tracking Module should be integrated with the CP OBTs  SCIRO has to deliver the final version of the XML schema

3 Task 3.1 Tracking Module XML interface between TM and DPM  Results  An XML Schema has be defined, including OBT generated and terminated message sets  Problems  Something may be modified following the TECNO clarification of the meaning and use of some messages  TECNO should clarify how to manage the OBT installation and configuration: some new configuration and diagnostic messages may be introduced

4 Task 3.1 Tracking Module XML interface

5 Task 3.1 Tracking Module OBT generated and terminated message

6 Task 3.1 Tracking Module Event Messaging Procedures  Results  Two different policies have been identified: oThe OBT sends messages on timed events (the OBT switches from sleep mode to active mode and vice versa). Time intervals are defined for: Login in GSM network Position acquisition Send SMS messages oThe OBT is able to work in Timetable Supervision Mode. The DPM sends timetable data to the OBT. The OBT sends messages only if there is a deviation with the configured position or sensor configuration.  Problems  TECNO should clarify how to use some OBT functionalities and SMS messages.

7 Task 3.1 Tracking Module Next Steps

8 Task 3.3 Asset Management Module Definition of hierarchy in wagon types  The Order Manager has to translate the Customer transport request in type and quantity of wagons, providing different alternatives of wagon types and the hierarchy.  No work to be performed by the F-man tool.