Southern California Integrated GPS Network Budget outlook for long-term operations of the SCIGN project Ken Hudnut and John Galetzka, Chairman & Network Coordinator League of California Surveying Organizations May 3, 2001 Long Beach, California
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab Type in action items as they come up Click OK to dismiss this box This will automatically create an Action Item slide at the end of your presentation with your points entered. Operational Groups: Major Funding: Total $18 M SOPAC SCIGN is an integral part of SCEC
Outline of Responsibilities SOPAC Installationyestrainingsite recon Management permitting Maintenancetech.yes (50)yes (200) & downloadingsupport rapid for Analysisyesyesearthquake response Archivebackupyesdata to SIO Earthquakesupportsupportyes Response Research &analysisanalysis &telemetry Developmentarchive
Staff supported by SCIGN for out-year budget only SOPAC Maintenance00.53 & downloading Analysis111 Archive Earthquake001 Response Research &0.511 Development (In FTE’s) Annual budget$265 K$685 K$780 K
SCIGN budget overview; FY97-FY02
SCIGN funding; FY97-FY00 During the construction phase of the project, we have remained on budget (nearly) Installation delays (especially permitting) mean that we now have only 1+ years’ funding remaining to operate the full network, now that it has been completed $1.5 M remaining Keck funds; ongoing USGS support of approx. $0.5 M per year $1.8 M per year current budget Need to drop annual costs to stretch resources farther Prospects for other funds through CSRC, USGS, PBO, etc. but as yet we cannot count on these After about July 2002, SCIGN will face annual shortfall of $1.3 M if we don’t cut costs, and only have USGS funds for network operations support W. M. Keck$5.92 M NASA$5.76 M USGS$2.02 M NSF$2.00 M SCEC$0.80 M SIO$0.62 M Total$17.12 M Need to figure out how to keep SCIGN going in case CSRC and other funds don’t materialize…
County Surveyors’ support for SCIGN? Could this work? Each county would provide 1-2 people to be be trained and then available for site troubleshooting as needed and directed by Galetzka Trained people would then have SIM access. They’d be called only occasionally, if the sites are having problems and need to be visited by a trained field trouble-shooter (to fix site, or report symptoms to Galetzka for visit by other SCIGN personnel) SCIGN would provide training and direction, spare GPS and other equipment & tools County would provide person and vehicle, PC with internet to make SIM data entries Benefits to Counties - data from key SCIGN stations ensured (those of interest for surveys) - keep network going for a longer time (for long-term control) Benefits to SCIGN - data from SCIGN stations ensured (more rapid station repair by having closer support) - keep network going for a longer time (for better scientific data) - costs to scientific funding agencies can be lowered (drop by ~1.5 to 2.0 FTE’s)
SCIGN project installation: 250 sites by mid-2001