Southern California Integrated GPS Network Budget outlook for long-term operations of the SCIGN project Ken Hudnut and John Galetzka, Chairman & Network.

Slides:



Advertisements
Similar presentations
Maternal and Child Health Bureau Seminars on Adolescent Health: Nutrition and Physical Activity, Part I July 30, 2003 Health Resources and Services Administration.
Advertisements

Charlie Daniels Arkansas Secretary of State HAVA Compliant Voting Systems Security Considerations General Recommendations to Enhance Security and Integrity.
East Bay RTK Network Duncan Marshall East Bay Regional Park District This presentation will probably involve audience discussion, which will.
Investigating Learner Autonomy in a Virtual EFL Classroom Jo Mynard Research in ELT Conference Bangkok, April 2003 This presentation will probably involve.
08/20/101 Ageometer Ananta Bhadra Lamichhane Nana Assyne Pankaj Jaiswal This presentation will probably involve audience discussion, which will create.
2013 Lexus LX570 Armoring process. ETA: 2 weeks This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
December 18, 2002 Communication Preferences of Association of Lutheran Secondary Schools Shelley Novotny Director of Communications Concordia Academy -
Southern California Integrated GPS Network (SCIGN) Kenneth W. Hudnut U. S. Geological Survey This presentation will probably involve audience discussion,
Project Status Group B-4 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Spatial Reference Networks in California Kenneth W. Hudnut U. S. Geological Survey This presentation will probably involve audience discussion, which.
1 Southern California Integrated GPS Network Ken Hudnut USGS League of California Surveying Organizations April 5, 2001.
Al Akhawayn University School of Humanities and Social Sciences Communication Studies Course „Public Relations Communication“ Prof. Dr. Mohammed Ibahrine.
Hospital Management System A complete solution for Hospital Services and Activity This presentation will probably involve audience discussion, which will.
MEDIEVAL UNIT This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action.
THE FUTURE OF GLOBAL TOURISM Miguel Southwell Miami International Airport July 24, 2003 This presentation will probably involve audience discussion, which.
1 Study of the Effectiveness of the Education Specialist with Mild Moderate Disabilities District Intern Program Report to the California Legislature This.
CRESR - Sheffield Hallam University 1 Same Train, Different Compartments: the EES and Structural Fund Programmes in the Regions Dr Tony Gore CRESR Sheffield.
Integrating Technology into Business classes Michael Wong April 24, 2002 This presentation will probably involve audience discussion, which will create.
Ecuador National Executive Committee INTERNATIONAL YEAR OF VOLUNTEERS 2001 IN ECUADOR "NATIONAL EXECUTIVE COMMITTEE" This presentation will probably involve.
Computer Science Program Center for Entrepreneurship and Information Technology, Louisiana Tech University This presentation will probably involve audience.
Final Project Status Presentation May 1, 2003 SPOT Li Geng, Akbar Noorani, Aimee Ronn, Stephen Sisk, Mollie Wendel, Billy.
Breeding Excellence Abroad A Journey In the Caribbean This presentation will probably involve audience discussion, which will create action items. Use.
Chapter 3 – The Analysis Workflow CSC532: Fall 2003 Original presentation by Joshua Hughes Zehra Raoshan Kiran Balagani Guang Li This presentation will.
Lessons from SCIGN and BARGEN Ken Hudnut & Brian Wernicke USGS/Caltech This presentation will probably involve audience discussion, which will create action.
The Kansas Rural Health Plan July 29, 2008 Presented At: State Network Council Meeting, Wichita, KS By: Rochelle Schultz Spinarski, Rural Health Solutions.
Mid Term Report Integrated Framework, Visualization and Analysis of Platforms This presentation will probably involve audience discussion, which will create.
My Life Scott Stillwell This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Karl Marx The German Ideology A Contribution to the Critique of Political Economy Prepared by: Erin Mustard Jackeline Hernandez This presentation will.
US Department of Health and Human Services Health Resources And Services Administration Maternal And Child Health Bureau Diana Denboba This presentation.
Evening High School Ms. Baisden Intro to Computers Intro to Word Processing Typing This presentation will probably involve audience discussion, which will.
CSC 532 Term Paper Topic decision: 10/10/02 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
The Design of MCM1 Cayci Suitt, Sal Ledezma, Jimar Garcia, Gene Wie ICS 125 – Ebert 15 May 2001 This presentation will probably involve audience discussion,
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
JPL Status Report, SCIGN Annual Meeting, 4/26/2004 JPL Update Danan Dong Michael Heflin Sharon Kedar Brian Newport Frank Webb.
THE BOOK BANK MAKERERE UNIVERSITY LIBRARY This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to.
How abstract components are returned when schema.getElementDeclarations() is called – an animation in 3 slides -- schemas that use and July 26, :00pm.
How abstract components are created when reading a schema – an animation in 9 slides -- complexType July 26, :00pm This presentation will probably.
Bridge WG Status Report David Harrington Dan Romascanu This presentation will probably involve audience discussion, which will create action items. Use.
1 M&V Cx Working Group Report New York City - M&V Summit Steve Dunnivant - Chair This presentation will probably involve audience discussion, which will.
Electronic Engineering Dept.1 Final Year Project - Progress Presentation Wifi Controlled Robotics Mark Heneghan This presentation will probably involve.
Project Status [Project Name] [Presenter Name] This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
The Evaluation Matrix: When & Where & Who & How Thomas Shuster, Ph.D. Todd Braeger, M.S. Spectrum Consulting / Safe Food Institute 1770 North Research.
Health Resources and Services Administration Maternal and Child Health Bureau Presentation For DataSpeak May, 2003 Health Resources And Services Administration.
NYCDEP Harbor Survey Program Beau Ranheim Section Chief, Marine Sciences This presentation will probably.
Policy That Works May 5 th 2012 Toronto, Ontario This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
IRRI - Genetic Resources Information Management System (GRIMS) This presentation will probably involve audience discussion, which will create action items.
How abstract components are created when reading a schema – an animation in 6 slides -- complexType with wildcard July 26, :00pm This presentation.
1 LoTAG conference – 11 th May 2015 LoHEG - London Highway Engineering Group Update Co-chair – Dale Foden/Ian Hawthorn This presentation.
The Electronic Board book [Giles County Public Schools] [Robert C. McCracken] This presentation will probably involve audience discussion, which will create.
LoTAG conference – 1st March 2016
Bond-Jini Interoperability Mathew Lowery
Continuous Random Variables
Einstein’s Special and General Theories of Relativity.
Pretest Chapter 17 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Final Project Presentation
Martha Grabowski LeMoyne College
واشوقاه إلى رمضان مرحباً رمضان
Presented by: Arlene N. Baratang
Evaluation of Data Fusion Methods Using Kalman Filtering and TBM
Continuous Random Variables
IEEE Rail Transit Vehicle Interface Standards Committee
Presented by Ingrid Evans- JEDDS Officer
Baseline Matching / Grading
Test Flow: Acceptance & defect criteria The First half RUP summary
Final Presentation Wireless mouse over BLUETOOTH By: David Gabay
Department of Information Technology (DoIT)
* L. E. Turner and M. R. Smith, University of Calgary, Alberta, Canada
Project Design Document
Minnesota Counties Computer Consortium(MCCC) Community Registry
Bay Bulls-Bauline Athletic Association December 2009
Presentation transcript:

Southern California Integrated GPS Network Budget outlook for long-term operations of the SCIGN project Ken Hudnut and John Galetzka, Chairman & Network Coordinator League of California Surveying Organizations May 3, 2001 Long Beach, California

This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab Type in action items as they come up Click OK to dismiss this box This will automatically create an Action Item slide at the end of your presentation with your points entered. Operational Groups: Major Funding: Total $18 M SOPAC SCIGN is an integral part of SCEC

Outline of Responsibilities SOPAC Installationyestrainingsite recon Management permitting Maintenancetech.yes (50)yes (200) & downloadingsupport rapid for Analysisyesyesearthquake response Archivebackupyesdata to SIO Earthquakesupportsupportyes Response Research &analysisanalysis &telemetry Developmentarchive

Staff supported by SCIGN for out-year budget only SOPAC Maintenance00.53 & downloading Analysis111 Archive Earthquake001 Response Research &0.511 Development (In FTE’s) Annual budget$265 K$685 K$780 K

SCIGN budget overview; FY97-FY02

SCIGN funding; FY97-FY00 During the construction phase of the project, we have remained on budget (nearly) Installation delays (especially permitting) mean that we now have only 1+ years’ funding remaining to operate the full network, now that it has been completed $1.5 M remaining Keck funds; ongoing USGS support of approx. $0.5 M per year $1.8 M per year current budget Need to drop annual costs to stretch resources farther Prospects for other funds through CSRC, USGS, PBO, etc. but as yet we cannot count on these After about July 2002, SCIGN will face annual shortfall of $1.3 M if we don’t cut costs, and only have USGS funds for network operations support W. M. Keck$5.92 M NASA$5.76 M USGS$2.02 M NSF$2.00 M SCEC$0.80 M SIO$0.62 M Total$17.12 M Need to figure out how to keep SCIGN going in case CSRC and other funds don’t materialize…

County Surveyors’ support for SCIGN? Could this work? Each county would provide 1-2 people to be be trained and then available for site troubleshooting as needed and directed by Galetzka Trained people would then have SIM access. They’d be called only occasionally, if the sites are having problems and need to be visited by a trained field trouble-shooter (to fix site, or report symptoms to Galetzka for visit by other SCIGN personnel) SCIGN would provide training and direction, spare GPS and other equipment & tools County would provide person and vehicle, PC with internet to make SIM data entries Benefits to Counties - data from key SCIGN stations ensured (those of interest for surveys) - keep network going for a longer time (for long-term control) Benefits to SCIGN - data from SCIGN stations ensured (more rapid station repair by having closer support) - keep network going for a longer time (for better scientific data) - costs to scientific funding agencies can be lowered (drop by ~1.5 to 2.0 FTE’s)

SCIGN project installation: 250 sites by mid-2001