RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.

Slides:



Advertisements
Similar presentations
RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Advertisements

Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
RPC project Upgrade phase I Pierluigi Paolucci. RPC system in the forward region The forward region of the RPC project consists of: 4 disks equipped with.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
RPC tasks and manpower P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.
RPC project chart Pigi Paolucci. RPC structure Project Manager1 0 level Deputies - Resource Manager2 0 level Istitution – Editorial – Conference2 0 level.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Link Board Upscope Frascati group Napoli group Warsaw group.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
Management Committee Summary Effort at CERN Operational Tasks Cost Sharing and New Expenses ZDC Collaboration Management roles Papers, Conferences and.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
LV and HV status of the RPC system RPC detector and trigger group.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Run Coordination Report 4th RPC General Meeting (CMS week) Luigi BENUSSI, Hassan SHAHZAD, Nicolas ZAGANIDIS.
Tracking Task Force Predrag Buncic Offline Week, 19 March 2014.
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
Objectives 4 Understand the importance of communication in projects 4 Understand the need and importance of project management.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
SG 27/1/2014. Muon week format MondayTuesdayWednesdayThursdayFriday MorningSoftware Smaller upgrades / Pashe 2 PerformanceNSWPlenary Afternoon LS1 and.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
Muon Conference Pigi Paolucci. Front-End Control and Monitoring System for the Resistive Plate Chambers at the CMS Experiment Contributed to be given.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
DPS/ CMS RRB-T Core Software for CMS David Stickland for CMS Oct 01, RRB l The Core-Software and Computing was not part of the detector MoU l.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Commissioning and run coordination CMS week Commissioning plenary 28-February 2007 DQM and monitoring workshop MandateGoals.
Management hoo-hah Created short list for DPG coordinator ( ) – Talked with several people to converge on the list – Tiziano now has the list and.
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
Offline week meetings CERN – June 25, 2009 CAF user experience Maria Nicassio (INFN Bari)
BIS 303 Week 3 DQ 2 What is your organization’s policy regarding the replacement or upgrading of hardware and software? Are there scheduled replacements.
P. Paolucci G. Pugliese M.Tytgat
Senior Staff Meeting November 12, 2008
Electronics for RPC Upscope
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
Quicken technical support number SDFGFFGGDF. QUICKEN TECHNICAL SUPPORT NUMBER QUICKEN TECHNICAL SUPPORT NUMBER
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
HV Imon in 1th MTCC period
LINK BOARD PROJECT UPGRADE
RPC Detector Control System
RPC Detector Control System
DQM for the RPC subdetector
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC Detector Control System
LINK BOARD PROJECT UPGRADE
Presentation transcript:

RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli

RPC workshop ? Why ? Pigi Paolucci RPC Consolidation Workshop 2  RPC system is working very well and during the 2009/2010 data taking has showed a very uniform behavior with a very high running efficiency (> 98%)  This workshop has been organized “to think about” the following very important questions: 1. What have we learned during the data taking ? 2. How can we improve our hardware, monitoring and software systems ? 3. Are we ready for a very long 2011/2012 data taking ?

Workshop Goals Pigi Paolucci RPC Consolidation Workshop 3  Discuss and Identify:  “week parts” of the system  tasks/services needed  core group of people at CERN  Discuss and organize:  how to consolidate our system (from the hardware to the data analysis)  how to cover all the tasks/services needed  support the core group and all the experts  2011/2012 Organization chart  2011 Financial budget commitment  2012 Financial budget plan

Manpower & Tasks Pigi Paolucci RPC Consolidation Workshop 4 Manpower Run CoordinationTechnical Cood.DPGUpgrade L. Benussi (LNF)A.Dimitrov (CERN)D. Piccolo (LNF)S. Park (Korea) …………..S. Buontempo (Napoli)M. Maggi (Bari)………. ………….. Tasks Technical CoordDPG ManagerS. Buontempo (Napoli)ConfigurationKarol (Warsaw) Deputy…………..Database? Gas…………..

Conclusions & CMS week Pigi Paolucci RPC Consolidation Workshop 5  4 sessions: Technical Coordination, Run Coordination, DPG and Upgrade  All the talks are focused on “how to improve our present system”  We will collect from the sessions all the requests, proposal and tasks.  They will be presented and discussed during the RPC General Meeting of the CMS week (Tuesday 7 Dec 9:30/13)  Tasks/Manpower, people at CERN and Organization chart will be discussed at the RPC IB (Tuesday 7 Dec 15-16:30)  Full picture of RPC project, organization chart, not covered item and problems will be presented at the 3 Feb 2011 Management board