Arch 04 UNIVERSITY OF MINHO 0 Daniel Oliveira & Paulo Lourenço U N I V E R S I T Y O F M I N H O Barcelona, November 17-19 2004 REPAIR OF STONE MASONRY.

Slides:



Advertisements
Similar presentations
Alireza Mahdizadeh - Jamaledin Borzouie
Advertisements

Actions and Retrofit of Post Earthquake-Damaged Bridges
6 Structures © Goodheart-Willcox Co., Inc Permission granted to reproduce for educational use only.
TED 316 – Structural Design
Drystone Retaining Walls Presentation to Bridge Owners Forum at Kings College, Cambridge 13 May 2008.
Hunterdon County’s Stone Arch Bridges H unterdon County’s interest in stone arch bridges began in 1992, when a developer wanted to a raze a stone arch.
Introduction to Bridge Building
Version RAILER SMS Track Structure Condition Index (TSCI)
By: Adil Godiwalla, P.E. Houston Airport System
Let’s Learn About Bridges
Chapter 34 Bridge Construction.
Bridge Engineering: Lessons from Rome to Tacoma
The development of wall structures After the foundations have been completed the external walls are set out and construction commenced. There are many.
C. Modena, M.R. Valluzzi, F. da Porto, F. Casarin and C. Bettio Dept. Of Structural and Transportations Engineering, University of Padova, Italy STRUCTURAL.
Reconstruction of the Eads Bridge Highway Deck
Foundation Systems.
Bridge Vulnerabilities Oct What puts bridges at risk? Ability to withstand seismic forces and displacements.
Increased load capacity of arch bridge using slab reinforced concrete T.G. Hughes & M. Miri Cardiff School of Engineering Arch 04, Barcelona, Nov ,
CONSTRUCTION.
Structure Strength Lecturer: Professor Stephen T. Thornton.
Competency: Draw Foundation Plans
University of Minho Czech Technical University in Prague University of Padova Technical University of Catalonia ARCCHIP- ITAM Investigation of the Use.
Basic Civil Engineering-Foundation
 The biggest difference is the distance they can cross in a single span.  A modern arch can safely span up to 800 or 1,000 feet.  While a suspension.
COLUMNS.
Chapter 18 Foundations.
Principles of Joints & Sealants Chapter 9. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
There are many types of bridges including:
The ground must push up as hard as the building pushes down
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Bridging the Gap Bridges make it possible to cross gaps without falling in, getting wet, or going the long way around. The first bridges were probably.
Main Goals of this Activity
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
Approaches to Historic Bridge Rehabilitation Case Study #4
Other Construction Projects
Introduction to a pit installation
STRUT & TIE MODELS (S-T-M)
Bridge Engineering (5) Substructure – Abutments and Piers
The Schoharie Creek Thruway bridge collapse
What do you think civil engineers do?
Ninoska Ruiz. Sarahy Carrillo.
Standard 6 Deteriorated historic features will be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive.
Structures What things do I need to find out in order to predict if what I design will stand up to the use I intend to put it through?
Bridge Engineering (2) Bridge Forms 1. *Introduction 1.1 Beam bridges (Dongming YR Brdg)Dongming YR Brdg 1.2 Arch BridgesArch Bridges 1.3 Cable-supported.
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
Competency: Draw wall sections and details
Bridges.  A bridge provides passage over some sort of obstacle: a river, a valley, a road, a set of railroad tracks... Etc…  The type of bridge used.
Bridges and Loads Modified by Matthew Silbernagel.
SIGMA INSTITUTE OF ENGINEERING. MODULE :MASONRY CONSTRUCTION.
The Alberta Context Larry Pearson, M.E.Des. (Arch) Director, Historic Places Stewardship Programs Alberta Culture and Tourism.
Types of Bridges Source:
CIVI 6061-Strengthening of bridges using FRP
High Bridge Re-Deck Project
METHODS OF CRACK REPAIRS
Gothic Architecture.
Project Purpose and Objective
New hazards and transport infrastructures
MASONRY STRUCTURE DOS III UTSAV KOSHTI.
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
Wood Structures Topic 8 Quality Workmanship
Bridge Engineering: Lessons from Rome to Tacoma
Board of Commissioners Meeting
Arch205 building construction wall systems- Masonry
Pont du Gard.
ROOFS.
Let’s Learn About Bridges
BUILDING CONSTRUCTION
BUILDING CONSTRUCTION Foundation
Presentation transcript:

arch 04 UNIVERSITY OF MINHO 0 Daniel Oliveira & Paulo Lourenço U N I V E R S I T Y O F M I N H O Barcelona, November REPAIR OF STONE MASONRY ARCH BRIDGES 4TH. CONFERENCE ON ARCH BRIDGES

arch 04 UNIVERSITY OF MINHO 1 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, INTRODUCTION Masonry Arch Bridges in Portugal:  - Roman Period, Medieval Age and Modern Period (Priceless architectural and cultural legacy, but often showing signs of damage) Major Causes of Damage:  - Deep change of loads for which bridges were built - Lack of adequate maintenance - Ageing processes (decay of the materials)

arch 04 UNIVERSITY OF MINHO 2 INTRODUCTION Generalized Damage:  - Absence of mortar in the stone joints - Existence of vegetation and biological colonization - Presence of humidity and efflorescences - Accelerated decay of the materials Localized Damage:  - Longitudinal cracking of the arches - Movement of abutments - Lack of plumbness of the spandrel walls 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, But damage can be “minimized”… - By performing periodical inspections - By reducing the traffic load - By carrying out repair and strengthening measures… (Preventive maintenance)

arch 04 UNIVERSITY OF MINHO 3 INTRODUCTION Principles of Intervention in the Architectural Heritage (ICOMOS):  - Minimum repair to assure safety and durability - Respect of the original conception - Compatibility between existing and new materials 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, … Survey and Repair of 2 Portuguese Masonry Arch Bridges  - Boutaca Bridge - Donim Bridge When dealing with architectural valuable constructions…

arch 04 UNIVERSITY OF MINHO 4 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, INTRODUCTION BOUTACA BRIDGE (stone masonry)  - Local: Batalha, center of Portugal BOUTACA BRIDGE - Dimensions: 60m length, 7m width (5m span ) - Purpose: roadway (belonging to the former road Lisbon-Porto) - Date of construction: 1860 Pointed Arches Flat roadwayTie rods + anchorages Buttressing System Uncertain safety conditions  Survey requested

arch 04 UNIVERSITY OF MINHO 5 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, Results of the Survey carried out:  - Vegetation & lost of plaster (lack of maintenance) - Humidity & biological colonization (deficient drainage system) - Cracking in the buttress walls - Existing anchorages much deteriorated and rather deformed (outward movement of masonry) (Buttresses overloaded) INTRODUCTION BOUTACA BRIDGE

arch 04 UNIVERSITY OF MINHO 6 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, Recommended Remedial Measures:  - Lightening the buttresses  Tie rods + patress plates INTRODUCTION BOUTACA BRIDGE A) Structural Strengthening Additional “buttressing system” Patress plate Tie rod

arch 04 UNIVERSITY OF MINHO 7 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, Waterproofing of the pavement and reconstruction of the drainage system INTRODUCTION BOUTACA BRIDGE B) Other measures: - Cleaning and removal of vegetation - Replacement of plaster - Need for periodical visual inspections

arch 04 UNIVERSITY OF MINHO 8 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, DONIM BRIDGE (stone masonry)  - Local: Guimarães, North of Portugal - Dimensions: 62m length, 4m width (larger span ≈ 12m) - Purpose: roadway (major importance untill 2 centuries ago) - Date of construction: 15 th – 16 th century INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE Semicircular Arches Flat roadway Pier + Cutwaters Flood arch Precarious safety conditions  Survey requested

arch 04 UNIVERSITY OF MINHO 9 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, Results of the Survey carried out:  - Extensive longitudinal cracking in the left arch - Infesting vegetation all over the bridge INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE - Longitudinal cracking in the flood (right) arch - Cutwater of the right pier highly damaged

arch 04 UNIVERSITY OF MINHO 10 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, block foundation missing (underwater inspection) INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE - A numerical analysis (3D, non-linear) carried out allow to confirm the damage observed and helped understanding its causes - Spandrel walls out of plumb (Incremental principal strains) Major problems :  - Outward movements of spandrel walls - Longitudinal cracking in the left and right arches - Pre-collapse of a cutwater (right pier)

arch 04 UNIVERSITY OF MINHO 11 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE Recommended Remedial Measures:  - Remove of the infill A) Left Arch (return joint’s thickness to its original width) - Voussoirs placed in their original positions by means of rope-strechers - Fastening of stainless steel U profiles placed in a U shape above the arch and close to the spandrel walls - Tie rod to bind the spandrel walls - Infill put back into its place ] profiles U shape tie rod Anchor rods

arch 04 UNIVERSITY OF MINHO 12 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE - Full width anchors across the arch B) Flood (right) Arch (prevent further spreading of the arch) - Stitching anchors linking the arch to the spandrel walls Stitching anchors Full width anchors

arch 04 UNIVERSITY OF MINHO 13 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE - Dismantling and rebuilding of the right cutwater (same stones + steel cramps + steel latches) C) Other measures: - Replacement of the missing foundation stone block - Waterproofing of the pavement and reconstruction of the drainage system - Cleaning and removal of vegetation - Repointing of the deteriorated masonry joints

arch 04 UNIVERSITY OF MINHO 14 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A, Final Remarks  - Cleaning and removal of vegetation INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE FINAL REMARKS - Adoption of repair measures compatible with modern principles of structural intervention in the architectural heritage - Waterproofing and drainage of the pavement Common features to both examples Thank you for your attention