Fall 2007 Schedule of Due Dates M/F: due at 3pm in ERC 536 W: due at class time start oral reports on 10/17 overview of project in 5-10 minutes.

Slides:



Advertisements
Similar presentations
1 CS Tutorial 2 Architecture Document Tutorial.
Advertisements

1 CS 446 – Tutorial 6 Frid. Nov. 6 th, 2009 Implementation Tutorial.
COMP4710 Senior Design Process Documentation and Deliverables.
ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
Lecture 9: May 4 Instructor: Craig Duckett. Announcements Assignment 2 Assignment 2 has been graded and returned! Assignment 2 Revision is on LECTURE.
Best Practices for . Overview List Targeting Content Creation Pre-headers Test! Best Practices: Subject Length Best days to send Best time of day.
Team Name Conceptual Design Review Team Members Date Fall 2011 Rev A
Game Inception and Design Project 1 Due dates: –Wednesday, January 18th: First-draft –Monday, January 23rd: Peer Review due –Thursday, January 26th: Final.
Happy Halloween! notebooks and task list due today revisit schedule of upcoming assignments –ABET essay –timeline/effort matrix –technical specifications/standards.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
Topics electronic version of professional biography posted: schedule: upcoming due dates teams: currently 2 people.
Project Management Module 3. Keep focused on the timeline Week Prepare for Kick-off Meeting Assign teams Team forming Review and execute.
Schedule. Team Notebook Grading Contents: meeting logs (date, time, duration, who is present, topics discussed, action items) graded assignments expenses.
6/19/2015Sample Presentation1 CS Software Testing Fall 2009 Project Title Team Name List names of all members of your team.
MdH/IDt1March 11, 2003 Software Engineering Lesson 8 Project preparation Andreas Sjögren.
Team Name Conceptual Design Review Team Members Date Fall 2010 Rev A
Scenario Assignment IS 485, Professor Matt Thatcher.
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Game Inception and Design Project 2 Due dates: – Friday, September 8 th, 11:59pm.
Your Presentation Title Names of Team members Advisor name EE496A Midterm Presentation Fall, 2006.
CS & ECE Senior Design Project Winter 2008 Karen Davis Chia Han Altan Ferendeci.
Topics electronic version of professional biographies: –9 not yet submitted –late penalty: 10% per day starting after 7pm tonight ~27 teams –1 missing.
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
Mechanical Engineering 1010 Design Reports How to make them better David Bayless, Ph.D., P.E., Fellow of ASME and NAI Gerald Loehr Professor October 14,
EG1003: Introduction to Engineering and Design Milestone Presentation Format.
INFORMATION X INFO415: Systems Analysis Systems Analysis Project Deliverable 3 Requirements Models.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
Goal and Scope Where are we going and what path will we be taking?
The Biography Unit An Online Learning Experience.
On your note card… Your student’s name Your name The best way to contact you Anything I may need to know about your student that I might not already know.
IENG 471 Facilities Planning
ATOMIC CONCEPT SEPTEMBER 16, DO NOW – 9/16/2015 From the In-Class Folder, take out the Chemistry Assignment Schedule. ◦ Glue the sheet to the inside.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
Topics results of ABET survey of skills vs. importance announcements –start oral reports on 10/18 –schedule tbd schedule: upcoming due dates –electronic.
Monday, November 5 th Entry Task Take the next couple of minutes to review for your 4.1 quiz Schedule: 4.1 Quiz Investigate Chemical Weathering Pre-Lab.
How to start Milestone 1 CSSE 371 Project Info There are only 8 easy steps…
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Work Day Check Robot Against Budget Work on Oral Report Work.
Team Presentations & Written Report Dates & Guidelines 25 minute Presentations Monday Nov 26 Team 4 start 5:45 - 6:10 Team 5 start 6:15 – 6:40 Wednesday.
1 Career PowerPoint Presentation Carla Burns Senior Seminar February 22, 2011 Choose a career you’d be or you are interested in! Total points: 100.
HS-210 Medical Office Management. Why Medical Assisting? Why did you choose to become a medical assistant/MOM? Everyone please post a response.
CSCE 496/896 Self-Managing Computer Systems Ying Lu 106 Schorr Center
Overview of the Midterm MIME 4200 Senior Design Projects Fall 2011.
6/3/2016 IENG 471 Facilities Planning 1 IENG 465 – Final Design Project Report & Presentation Requirements.
1 CS Tutorial 5 Frid. Oct 23, 2009 Design Document Tutorial.
PRJ566 Project Planning & Management Work Breakdown Structure.
Request for Proposal (RFP)
11/7/07 ABET constraints essay due today timeline/effort matrix due on Friday –read the requirements! –use real dates system requirements due a week from.
Materials: Agenda Pencil Science Notebook 2/9/16 Agenda: Agenda Bell work Field Study No gum, candy or chewing please! DO: Today we will conduct an ecological.
22C:082:001 Human-Computer Interaction. Fall Copyright © 2013 Juan Pablo Hourcade. 1 Group Project Phase Four.
Overview of the Proposal MIME 4200: Senior Design Projects.
Materials: Agenda Pencil Science Notebook 2/12/16 Agenda: Agenda Bell work Field Study No gum, candy or chewing please! DO: Today we will conduct an ecological.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
2/27/2016 IENG 471 Facilities Planning 1 IENG 464 – Conceptual Design Project Report & Presentation Requirements.
TA Meetings ECE 445: Senior Design - 09/15/15. Overview  Meeting expectations  How to prepare  Evaluation.
* Project Name Progress Report 2 Date Presented by:
Rube Goldberg Project/Bottle Rocket Project Friday, May 13, 2016.
Bottle Rocket Project Tuesday, May 17, Unit: Bottle Rocket Tuesday, 5/17 Think back to your Rube Goldberg Project. What did you learn from the design.
Project Charter 1.Overview / Background Section 2.Governance / Authority Section 3.Approach Section.
HCIS 410 AID Experience Tradition /hcis410aid.com
Project Name Progress Report 1
<Funding Request Title>
Insert subhead here Project Status.
Irony Assignment.
CS 490M Software Testing fall 2006 Project Title
Effective Project Management: Traditional, Agile, Extreme
Milestone Presentation Format
Project Sizing Guidelines
Project Sizing Guidelines
Planning Services Meeting Client Communications
Periodic Workflow Review
Presentation transcript:

Fall 2007 Schedule of Due Dates M/F: due at 3pm in ERC 536 W: due at class time start oral reports on 10/17 overview of project in 5-10 minutes

Upcoming Due Dates Friday 10/19: electronic project description –use html template – to Monday 10/22: design diagrams level 0 and 1 Monday 10/29: design diagram level 2 Wednesday 10/31: –project notebook –task list

Design Diagrams Design 0: give highest level view of your project Design 1: elaborate modules or subsystems given in Design 0 Design 2: further elaborate Design 1 Explain diagram conventions: what do boxes mean? what do lines between them represent?

Requirements for Design Diagrams Levels 0 and 1 Make sure to include the title and advisor for your project. Include a one sentence description of the project at the top. It is difficult to guess what the level 0 diagram represents without it. At the bottom of the diagram, put a legend where any acronyms are spelled out. Include a few sentences describing the conventions used in the figure (e.g., what do boxes represent? what do arrows represent?)

Reminder about Notebooks and Design Reports keep all graded assignments in your project notebook revise assignments that go into your design report format all documentation uniformly for the design report –individual assignments such as biographies and essays may have to be reformatted so that all team members’ assignments use the same style –assignments become sections in the design report; all sections should use compatible styles

Task List due: Wednesday 10/31/07 based on the subsystems identified in your Design Diagram Level 2, what activities need to be conducted to complete your project? consider any subgoals listed for your project as well include project title, one sentence summary, team members and advisor write tasks in complete sentences identify 8-25 tasks

Task Timeline Wednesday 11/19/07 deliverables and milestones associated with tasks weekly granularity up to 4/30/08 (target completion date) include actual inception and completion dates for each task tasks on one axis persons on the other axis estimated effort (high, low, medium, none, or percentage) for each person on each task Effort Matrix

Example Timeline and Effort Matrix

Example Timeline

Example Timeline and Effort Matrix