BABAR Status and Upgrade Plans David B. MacFarlane for PEP-II MAC Meeting December 13, 2004.

Slides:



Advertisements
Similar presentations
Sharpening the Physics case for Charm at SuperB D. Asner, G. Batignani, I. Bigi, F. Martinez-Vidal, N. Neri, A. Oyanguren, A. Palano, G. Simi Charm AWG.
Advertisements

IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
LHCf: a LHC Detector for Astroparticle Physics LHCf: a LHC Detector for Astroparticle Physics Lorenzo Bonechi on behalf of the LHCf Collaboration * University.
16 May 2002Paul Dauncey - BaBar1 Measurements of CP asymmetries and branching fractions in B 0   +  ,  K +  ,  K + K  Paul Dauncey Imperial College,
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
BABAR Status & Plans David B. MacFarlane SLAC EPAC Meeting January 25, 2006.
Jan 28th, 2009Colin Jessop at Notre Dame An experiment to measure CP violation in B mesons Colin Jessop University of Notre Dame.
BABAR Physics Results and Future Plans David B. MacFarlane SLUO Annual Meeting September 26, 2005.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
BaBar: The Detector Richard F Boyce 21 October 2003.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Radiative and Rare B-Decays at BaBar All results are preliminary unless journal ref. is given limit values are 90% CL unless otherwise specified Carsten.
Sergio Grancagnolo Activity Summary 9 Jan work in BaBar The apparatus Physics with BaBar Data analysis.
Preliminary Measurement of the BF(   → K -  0  ) using the B A B AR Detector Fabrizio Salvatore Royal Holloway University of London for the B A B AR.
June 2000Status of BELLE1 Beyond e + e - Workshop The Homestead Glen Arbor, MI Daniel Marlow BELLE Princeton University June 17, 2000.
July 2000Results from BELLE1 IV th Rencontres du Vietnam Hanoi, Vietnam Daniel Marlow BELLE Princeton University July 22, 2000.
Moriond EW, 3 Mar 2008Tagir Aushev (EPFL, ITEP)1  B → K S  0  0  B → K S K S  B → K S  0  B → D *+ D *-  B → a 1 , a 1 K, b 1 , b 1 K...  
The BaBarians are coming Neil Geddes Standard Model CP violation BaBar Sin2  The future.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
Wolfgang Menges, Queen Mary Measuring |V ub | from Semileptonic B Decays Wolfgang Menges Queen Mary, University of London, UK Institute of Physics: Particle.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Philip J. Clark University of Edinburgh Rare B decays The Royal Society of Edinburgh 4th February 2004.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
M. Gilchriese ATLAS Upgrade Introduction January 2008.
25/07/2002G.Unal, ICHEP02 Amsterdam1 Final measurement of  ’/  by NA48 Direct CP violation in neutral kaon decays History of the  ’/  measurement by.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
M. Adinolfi - University of Bristol1/19 Valencia, 15 December 2008 High precision probes for new physics through CP-violating measurements at LHCb M. Adinolfi.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Vienna Fast Simulation LDT Munich, Germany, 17 March 2008 M. Regler, M. Valentan Demonstration and optimization studies by the Vienna Fast Simulation Tool.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Precision Drift Chambers for the ATLAS Muon Spectrometer
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Comparing Luminosity Scans and Profile Monitor Results The size of the overlap of the two beams can be calculated from the individual beam sizes using:
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Performance and Aging Studies of BaBar RPC’s Henry R. Band University of Wisconsin for the BaBar IFR-RPC group RPC 2005 VIII Workshop.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Straw man layout for ATLAS ID for SLHC
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Tagir Aushev For the Belle Collaboration (EPFL, Lausanne ITEP, Moscow)
BaBar LST Upgrade Mark Convery SLAC 13 Jun 07.
David B. MacFarlane SLAC EPAC Meeting January 25, 2006
DCH Electronics Upgrade: Overview and Status
Francesco Forti University and INFN, Pisa
Kevin Burkett Harvard University June 12, 2001
14 paesi, 62 universita’ e laboratori
Radiative and electroweak penguin processes in exclusive B decays
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
RPC and LST at High Luminosity
Francesco Forti SuperB Workshop LNF, March, 2006
The IFR Online Detector Control at the BaBar experiment at SLAC
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Long term projections summary
Limited Streamer Tube Project Summary
Charmed Baryon Spectroscopy at BABAR
Presentation transcript:

BABAR Status and Upgrade Plans David B. MacFarlane for PEP-II MAC Meeting December 13, 2004

MAC - Dec 13, 2004BABAR Status and Upgrade Plans2 BABAR Collaboration Gathering at SLAC, July Countries 80 Institutions 593 Physicists Sep 2004

MAC - Dec 13, 2004BABAR Status and Upgrade Plans3 BABAR & Belle physics results BABARBelle Publications Papers submitted to ICHEP 7270 Parallel session talks at ICHEP 2221 A hundred flowers blossoming at ICHEP04 from both Collaborations: far too many results to cover here! Link to ICHEP04 talks and conference papers from BABAR

MAC - Dec 13, 2004BABAR Status and Upgrade Plans4 Initial goals for B Factories Exploring CKM picture or alternative origins for CP violation

MAC - Dec 13, 2004BABAR Status and Upgrade Plans5 sin2  results from charmonium modes BABAR PUB-04/038 Update for ICHEP04 Limit on direct CPV B elle B A B AR Belle CONF-0436

MAC - Dec 13, 2004BABAR Status and Upgrade Plans6 Summary of constraints on  Mirror solutions disfavored BABAR & Belle combined

MAC - Dec 13, 2004BABAR Status and Upgrade Plans7 Combined GLW and ADS constraint on  BABAR & Belle combined

MAC - Dec 13, 2004BABAR Status and Upgrade Plans8 B Factories have been very successful!  First precise test for CKM picture of CPV  sin2  = 0.726±0.037, precision measurement (5%)  Progress on other angles   from S  and  Dalitz o 2  from   from (w/ D Daltiz)  And on sides o Paradigm change! Now: looking for New Physics as correction to CKM

MAC - Dec 13, 2004BABAR Status and Upgrade Plans9 Possible New Physics addition: SUSY  MSSM parameters > 100!  squark/slepton mass matrix o Sensitive to SUSY breaking mechanism. o New sources of flavor mixing [masses + mixing angles + phases] Off-diagonal terms Flavor Physics at luminosity frontier Diagonal terms: LHC/ILC at energy frontier b and  are both 3rd generation: probe both 3  2, 3  1 transitions

MAC - Dec 13, 2004BABAR Status and Upgrade Plans10 Potential New Physics contributions “Internal Penguin” SUSY contribution with new phases New physics in loops?

MAC - Dec 13, 2004BABAR Status and Upgrade Plans11 Averages for sin2  and s-penguin modes 3.6 s from s-penguin to sin2 b (cc) No sign of Direct CP in averages

MAC - Dec 13, 2004BABAR Status and Upgrade Plans PEP II Luminosity Projections x ab -1 Original run plan from Sep 2004 Calendar Year

MAC - Dec 13, 2004BABAR Status and Upgrade Plans13 Projections for Penguin Modes K*K* 5  discovery region if non-SM physics is 0.30 effect 2004=240 fb =1.5 ab -1 Similar projections for Belle as well Projections are statistical errors only; but systematic errors at few percent level Luminosity expectations : f 0 K S K S  0  K S  ’K S KKK S

MAC - Dec 13, 2004BABAR Status and Upgrade Plans14 BABAR Detector DIRC  PID) 144 quartz bars PMs 1.5T solenoid EMC 6580 CsI(Tl) crystals Drift Chamber 40 layers Instrumented Flux Return iron / RPCs or LSTs (muon / neutral hadrons) Silicon Vertex Tracker 5 layers, double sided strips e  (3.1GeV) e  (9GeV)

MAC - Dec 13, 2004BABAR Status and Upgrade Plans15 RPC replacement & DCH readout upgrade  Replacing barrel RPCs with Limited-Streamer Tubes o Major collaboration effort involving SLAC and other west coast institutions, Princeton, OSU, and Italian institutions o Fast tracked: 1/3rd for installation in summer 2004, 2/3rd in summer 2005  DCH readout modifications o Potential DAQ bottleneck (deadtime source) in 2005 & beyond FADC decimation implemented this summer Hardware upgrade planned for summer 2005, which could be implemented in 1 month down Major hardware intervention: involves significant number of people and resources, originally planned on the basis of summer 04 & 05 installation

MAC - Dec 13, 2004BABAR Status and Upgrade Plans16 IFR upgrades o 6 layers: filled with brass o 12 layers: LSTs replace RPCs o 2 sectors completed in summer 2004 o 4 more in future Barrel: in progress Fwd Endcap: complete o 6 layers: filled with brass o 12 layers: RPCs replaced o New outer RPC, corner coverage

MAC - Dec 13, 2004BABAR Status and Upgrade Plans17 Barrel RPC average efficiency  Overall efficiency trend for barrel has stabilized since 2002 shutdown  But looking in more detail…reduced negative trend is still there  With the current slope, average barrel RPC efficiency could drop to ~20% by summer 2006  Concurrently, the fraction of dead modules is steadily increasing Dead module fraction

MAC - Dec 13, 2004BABAR Status and Upgrade Plans18 Muon identification efficiency —2000 NN —2003 NN —2001 NN —2004 NN —2002 NN  2000 cut-based Improvements in the muon selectors have significantly alleviated the effect of decreasing RPC efficiency ~90% ~70%

MAC - Dec 13, 2004BABAR Status and Upgrade Plans19 QC & selection of LST modules CEH assembly area

MAC - Dec 13, 2004BABAR Status and Upgrade Plans20 LST bottom sextant installation Backward side Before: Aug 15 After: Sep 4

MAC - Dec 13, 2004BABAR Status and Upgrade Plans21 LST top sextant installation Brass z-strips LST Modules Installation: Sep 16-29

MAC - Dec 13, 2004BABAR Status and Upgrade Plans22 Cosmic ray muon in new BABAR IFR Recorded Sept 30, 2004

MAC - Dec 13, 2004BABAR Status and Upgrade Plans23 DCH electronics upgrade  Motivation: o Reduce deadtime due to serialization and shipping of data from DIOM to ROM  Upgrade in two steps: o Phase 1 (2004): Ship only half the waveform information (32  16 bytes)  firmware change o Phase 2 (2005): Modify FPGA to do feature extraction before transmission  hardware change

MAC - Dec 13, 2004BABAR Status and Upgrade Plans24 DCH electronics upgrade  Phase I successful: o Firmware modifications (new PROMS) tested on Proto-II o All FEAs taken off the chamber, modified and mounted again o Cosmics taken at IR2 (EMC trig, no B-field) and put through OPR o FastMon plots show no problems  Plans for Phase II: o Design review Dec 7 o Install one FEA-2 board after X-mas shutdown o Full system ready for installation summer 2005

MAC - Dec 13, 2004BABAR Status and Upgrade Plans25 Future shutdown requirements  Installation tasks o Open barrel to allow LST installation in remaining 4 sextants (4 months) o Remove and modify DCH front-end assemblies (few weeks in parallel) o Remove support tube, install new diamond sensors for SVT radiation monitoring, but not SVT modules (3 months, mostly in parallel)  In process of optimizing timing of shutdown, with constraint of maintaining competitiveness Have concluded that replacement of horizontal modules in SVT is not warranted Long-standing BABAR goal: 500 fb -1 of 4S data by summer 2006 = double present data sample

MAC - Dec 13, 2004BABAR Status and Upgrade Plans26 5Mrad limit: Soft S/N deterioration S/N = 10 at 5 Mrads, S/N = 6 at 10 Mrads Radiation damage limits of SVT

MAC - Dec 13, 2004BABAR Status and Upgrade Plans27 o Resolution is degraded o Roughly 6µm/10% o Double at 20% occupancy 20% HOT RMS Residuals Occupancy affects performance both in terms of resolution and efficiency 20% occupancy limit is our working hypothesis Hit efficiency Hit efficiency vs. occupancy studied using data collected during vacuum leak SVT occupancy limits

MAC - Dec 13, 2004BABAR Status and Upgrade Plans28 Non-midplane modules: not a problem Midplane modules: starts to be a problem in 2006 Petersen 4 Mrad Radiation dose extrapolations 5 Mrad

MAC - Dec 13, 2004BABAR Status and Upgrade Plans29 Studies on the impact of physics results have been performed for a number of scenarios where we lose the functionality of a different number of chips in the mid-plane 35.3% 34.5% B  J/  s Example from most sensitive modes: soft  from B  D* 56% 51% Set E = 2 midplane chips off in L1& 2 (32 ICs) Scenarios with mid-plane L1-2 modules off: (UNREALISTIC) Mazur Impact of middle plane loss

MAC - Dec 13, 2004BABAR Status and Upgrade Plans30 Use fitted background parametrization from present experience to extrapolate to future running conditions Petersen YEAR 2004 YEAR 2007 For many chips, occupancy could be the real limiting factor independent of radiation damage Extrapolated occupancy

MAC - Dec 13, 2004BABAR Status and Upgrade Plans31 Shutdown length for LSTs and support tube  Open detector, clear slots, install LSTs, close detector o 11 rigging shifts/week; 6x10 hour LST installation shifts/week o 3.5 days for brass, 8 days for z-strips + modules, both per sextant o Total of about 4 months calendar time  Remove and install support tube (not yet integrated) o About 3 weeks in each direction based on previous experience o Assume 1+1 week in calendar time can be saved by work in parallel o Open SVT to allow access to Be bellows, but not module replacement  Total of 5 months for both tasks

MAC - Dec 13, 2004BABAR Status and Upgrade Plans32 Readiness for LST installation  Modules and brass o LST modules will be complete in early January o Brass will be on site by March  Tooling o Requires design load transfer tooling for EMC o Requires design, testing & approval of installation platforms Lateral support arms EMC installation fixtures Expect all preparations complete by July, 2005

MAC - Dec 13, 2004BABAR Status and Upgrade Plans33 Run options under consideration  “Early 2006 shutdown” o Ensure Run 5 is long enough to allow PEP-II to demonstrate 1.3x10 34, accumulate data for Winter 06 before LST shutdown o Run 5 extends until Dec 2005; shutdown from Jan-May 2006; Run 6 starts Jun 2006 o Advantage: Earliest LST insertion, smaller pressure on FY06 budget, long 06 run o Disadvantage: Only 400 fb -1 4S data for summer 06, PEP-II runs over summer run

MAC - Dec 13, 2004BABAR Status and Upgrade Plans34 Run options under consideration  “Late 2006 shutdown” o Run 5 extends over 19 months from Jan 05 to Aug 06, with Dec 05 off for PPS, rf installation; LST shutdown from Sep 06 to Jan 07 o Advantage: Over 530 fb -1 4S data for summer 06 o Disadvantage: Very late LST installation, pressure on FY05 and FY06 budgets; PEP-II running in summers of 05, 06, long-term loss of ~60-75 fb -1, short 06 run

MAC - Dec 13, 2004BABAR Status and Upgrade Plans35 Run options under consideration  “Mid 2006 shutdown” o Run 5 extends until we hit 500 fb -1 goal in April 06; shutdown from May-Sep 06 (extended summer down); Run 6 starts in Oct 06 o Advantage: ~500 fb -1 4S data for summer 06, PEP-II does not run over summer months, smaller pressure on FY06 budget, summer installation and manpower, more time for PEP-II upgrade components o Disadvantage: Later LST installation 1.Have not reconciled luminosity predictions with PEP-II; nor have we factored in the detailed PEP-II upgrade schedule 2.Shutdown start dates are flexible and illustrative Caveats

MAC - Dec 13, 2004BABAR Status and Upgrade Plans36 Options for 5 month down period o Early 06 shutdown = 5 months, Jan-May o Mid 06 shutdown = 5 months, May-Sep o Late 06 shutdown = 5 months, Sep-Jan

MAC - Dec 13, 2004BABAR Status and Upgrade Plans37 Closeup with summer 2006 outlook o Early 06 shutdown = 5 months, Jan-May o Mid 06 shutdown = 5 months, May-Sep o Late 06 shutdown = 5 months, Sep-Jan

MAC - Dec 13, 2004BABAR Status and Upgrade Plans38 Penguin performance comparison Penguin modes Charmonium modes BABAR late 06 BABAR mid 06 Belle estimate

MAC - Dec 13, 2004BABAR Status and Upgrade Plans39 Impact on muon physics performance Run 1-4Run 1-6: 19 month run Run 1-6: 2005 shutdown Luminosity Assume constant RPC efficiency K +  K *0  Assume declining RPC efficiency K +  K *0  RPC efficiency: 69% (potentially declining to 20%) LST efficiency: 92%

MAC - Dec 13, 2004BABAR Status and Upgrade Plans40 Conclusion Mid-2006 shutdown looks like best option Corollary: Run 5 should extend continuously through at least Dec 2005 o Allows SLAC, BABAR, PEP-II, DOE and other funding agencies to plan for calendar 2005 on this basis o Decisions on 2006 run optimization needs further discussion & study o May well depend on factors that will not be clear for some time yet, including budget requirements, LCLS, and success of Run 5 o Advantage: ~500 fb -1 4S data for summer 06, PEP-II does not run over summer months, smaller pressure on FY06 budget, summer installation and manpower, more time for PEP-II upgrade components o Disadvantage: Later LST installation