Missouri City, TX TV Antenna Collapse 1985 Based on Texas A&M engineering ethics web site.

Slides:



Advertisements
Similar presentations
BENDING MOMENTS AND SHEARING FORCES IN BEAMS
Advertisements

1 The New Steel Erection Rule: Highlights. 2 Steel Erection Final Rule Published January 18, 2001 Implemented January 18, 2002 Includes exceptions for.
A video dramatization on engineering ethics
Consider a section x-x at a distance 6m from left hand support A
Lecture 3: Take-off Performance
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Hyatt Regency Walkway Collapse & the TV Antenna Collapse
Strut Jack Operation The TeleCrib® Strut Jack is a removable 8,000 lb jack which fits over the strut body and gives the rescuer a controlled means for.
Mechanics of Materials – MAE 243 (Section 002) Spring 2008
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
CM 197 Mechanics of Materials Chap 8: Moments of Inertia
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Cranes and Slings 29 CFR and 184.
HSE TRAINING LADDER SAFETY January TMD-8303-SA LADDER SAFETY Whereas all other categories of occupational injury / illness and fatality statistics.
Key To Successful Tower Installations:
Today’s Objectives: Students will be able to :
Professor Joe Greene CSU, CHICO
Copyright © 2011 Pearson Education South Asia Pte Ltd
CON 4003, CVE 4073, CVE 5073 Construction Estimating Prof R. V. Locurcio, PE.
ENGR/PHIL 482--Engineering & Ethics Responsible Engineers.
Somerset College Safety, Health and Environment Toolbox Talk: Manual Handling.
Warm-Up: February 17, 2015 Write down a definition for equilibrium.
8. SHEAR FORCE AND BENDING MOMENT
Engineering Mechanics: Statics
Shear Forces & Bending Moments Shear & Moment Diagrams
Group 02 – Ethics Presentation Anthony Shillingburg Olumuyiwa Oyeleye Kyle Whetzel Scott Hamrick.
MECHANICS OF MATERIALS 7th Edition
Hands-on Activity: Machines and Tools, Part II Contributed by: Integrated Teaching and Learning Program, College of Engineering, University of Colorado.
CRANE TIP OVER Date: May 12 th, INCIDENT A galloway was being pre-assembled to determine proper fit. It was then to be disassembled and sent underground.
CS 481 Group 2 Jonathan Rile Brandon Strickland.  A company named Antenna Engineering designed a new TV antenna to be put up.  They hired Riggers, Inc.
KMA 4113 Log Periodic Antenna for 49 Mhz to 1.3 Ghz
SHEAR IN BEAMS. SHEAR IN BEAMS Introduction Loads applied to beams produce bending moments, shearing forces, as shown, and in some cases torques. Beams.
Utility Deregulation 10 Lessons Learned (the Hard Way) George R Owens PE CEM, President Energy and Engineering Solutions, Inc
Engineering Ethics Presentation “TV Antenna Collapse” Group 17 -Maputi Botlhole.
 Part One: Material Properties  Part Two: Forces and Torque  Assessment.
Static Equilibrium; Elasticity and Fracture
Hyatt Regency Walkway Collapse
All Canadian Training Institute Inc Meeting the challenge of change through safety training.
Static Equilibrium; Elasticity and Fracture
Buckling of Slender Columns ( )
Engineering Mechanics: Statics
WELCOME! STRENGTH OF MATERIALS SPRING LESSON 1 Introduction Review of Syllabus So, you thought you were done with Statics… Stress related to materials,
Theoretical Mechanics STATICS KINEMATICS * Navigation: Right (Down) arrow – next slide Left (Up) arrow – previous slide Esc – Exit Notes and Recommendations:
Finite Element Analysis of the Ellis Island Ferry Finite Element Analysis of the Ellis Island Ferry Li Ma and Tim Foecke, Metallurgy Division National.
Principle Stresses Under a Given Loading
Structure Analysis I. Lecture 7 Internal Loading Developed in Structural Members Ch.4 in text book.
CONTINUATION OF COMPONENTS OF FORCES Realize in these problems that a right triangle will represent a FORCE and the COMPONENTS of the force, when the.
Free Body Diagrams. Weight Free Body Diagrams Net Force Present.
009 (M3) ½”-2” 009 (M3) ½”-2”. Modification Overview- 009  009 ¾-1” ( ) (1” ) ¾-1” ( ) (1” ) 1¼ -2” ( ) 1¼.
RPZ 2½”- 10” RPZ 2½”- 10”. Modification Overview  Production of the RPZ in sizes 2½ - 10” began in 1993 and is current.
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. 1 Part 3 - Chapter 8 Linear Algebraic Equations and Matrices.
Quebec Bridge Collapse
The copyright to this material belongs to the Korea Occupational Safety and Health Agency. Unauthorized use and distribution are prohibited. If an individual.
Navigators Team Roseanne DeBellis Allison Esrig
İNŞ 239 LAW AND ETHICS IN CIVIL ENGINEERING Lecture Notes -2
Escalator Installation
Engineering 1 Structural Analysis Tom Rebold.
Tilt N’ Store Design Analysis
Chapter 9 Static Equilibrium; Elasticity and Fracture
Calculating Truss Forces
Calculating Truss Forces
Units of Chapter 9 The Conditions for Equilibrium
Kevin Dahya Critical Design Review 3/6/01
4000B (M3) ½”-2”.
Tilt N’ Store Design Analysis
Notification of Concern (NOC)
Examples.
Calculating Truss Forces
Vectors and Free Body Diagrams
Analysis of Perfect Frames (Analytical Method)
Presentation transcript:

Missouri City, TX TV Antenna Collapse 1985 Based on Texas A&M engineering ethics web site

The Cast of Characters Antenna Engineering, Inc. Designed and built the antenna William (Bill) Harris -- President. Harris recommended to Jordan that Antenna Engineering, Inc. not get involved with Riggers problems regarding lifting the antenna tower, due to legal liability issues. Harry Jordan -- Head of the Engineering Division. Jordan told Riggers that they could not authorize removing the microwave baskets, yet he also told Riggers that the engineering firm signed off responsibility once Riggers accepted their design plans. Riggers, Inc.: Contracted to assemble the antenna Frank Catch -- President. Randall Porter -- Vice President. Made initial call to Antenna Engineering, Inc., detailing the problems Riggers was having lifting the top antenna section with the microwave baskets on it. Bob Peters -- Lead Lift. One of the workers killed in the collapse. Kevin Chapp -- Cable Operator. Talked to Peters before the catastrophe, asking about the safety of the operation. The Problem: Riggers, Inc. could not hoist the last antenna section using the lifting lugs that Antenna Engineering provided due to interference with microwave baskets. Antenna Engineering refused permission for Riggers to remove the basket and reassemble after hoisting.

Analysis of the Antenna Lift MODEL RIGGERS THOUGHT WAS CORRECT Calculation of stress in bolts = Total Antenna Weight / (2 * Total Bolt Cross-sectional Area)

MODEL RIGGERS SHOULD HAVE USED: FREE BODY DIAGRAM OF LIFTING BAR AND ANALYSIS OF RIGGERS' SOLUTION Assuming that the angle that the tower hangs is relatively small, which it was, and that the bolts were about 1 foot apart, and that the supporting channel was about 6 feet long, the load in the bolts is actually a combination of direct shear (as found previously, plus the load due to the moment caused by the length of the channel. Thus: Sum of Moments about the bolt on the left end of the channel = 0 = Weight of antenna * 6 feet - Added force in bolt * 1 foot, such that Additional force in bolt = 6*weight of antenna, which when added to the direct force of 1 * Weight of Antenna gives a total load on the right hand antenna bolt of 7*Antenna Weight.. The corresponding shear stress on each bolt is thus: Stress = (7*Antenna Weight)/Area of bolt or, in other words, the stress (for these assumed numbers) in the bolts is seven times what the Riggers thought it would be.

Ethical Issues Of The Case - Points for Discussion 1)Where does the responsibility of Antenna Engineering end and Riggers begin? Should Antenna Engineering have provided adequate hoisting lugs in their original design? 2) Should Riggers have looked at the original design more carefully? 3) Should Antenna Engineering have allowed Riggers to remove the microwave baskets? 4) Should Riggers have devised their own hoisting solution without consulting an engineer? What is their responsibility for contracting a consulting engineer? 5) Should Antenna Engineering have recommended another consulting engineer to assist Riggers? Should they have notified their professional society? Was it ethical for the engineers at Antenna to wash their hands of the project without attempting to find a resolution for Riggers? What other measures could they have taken to assist Riggers without becoming legally entangled? 6) Should Antenna Engineering have refused to review the new hoisting design? 7) If social responsibility comes before legal liability, surely there were other things Antenna Engineering could have done. What would you do in a similar situation?