Work in progress..  Beam tracking with SAD through ATF combined optics: extraction line and proposed KEK final focus  Three tracking routines (good.

Slides:



Advertisements
Similar presentations
CLIC TeamMAD-X Day, September 4, 2003 MAD-X for CLIC H. Braun, R. Corsini, T.d’Amico, A. Faus-Golfe, M. Korostelev, S. Redaelli, T. Risselada, D. Schulte,
Advertisements

1 Collimation Simulations and Optimisation Frank Jackson ASTeC, Daresbury Laboratory.
THE SMALL ISOCHRONOUS RING PROJECT AT MICHIGAN STATE UNIVERSITY J. Alberto Rodriguez.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Laser interferometric beam size monitor (Shintake-monitor)
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
Bunch compression in the ATF2 M. Pivi, A. Seryi, P. T. February 15, 2005 SLAC Feb 2005.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
SLC  Testbed Proposal Jeff Gronberg  working group SC Linear Collider Retreat June 26 – 29, 2002.
Unit 2 Present Progressive and Simple Present. Unit 2 Present Progressive and Simple Present 2 Present Progressive.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
First investigations of ATF2 at SLAC Axel Brachmann, Thomas Himel, Tom Markiewicz, Janice Nelson, Toshiyuki Okugi, Mauro Pivi, Tor Raubenheimer, Marc Ross,
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Study of High Intensity Multi-Bunch  -ray Generation by Compton Scattering ATF TB 28/May/2006 presented by Tsunehiko OMORI (KEK) on behalf.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Intermediate  configurations at the IP for commissioning and optimization Sha BAI IHEP/LAL Philip BAMBADE LAL.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
Summary of Gamma-Gamma session Tohru Takahashi Hiroshima University Mar LCWS10/ILC10.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
ATF2 background and beam halo study D. Wang(IHEP), S. Bai(IHEP), P. bambade(LAL) February 7, 2013.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Collimation Baseline Configuration and Collimation Studies Frank Jackson ASTeC Daresbury Laboratory.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
For discussion of ATF2 beam time requests SLAC team October 1, 2008.
Optics for x-ing IR Andrei Seryi November 5, 2004.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
LHeC Final Focus System Jose L. Abelleira, PhD candidate CERN, EPFL Thanks to: H. Garcia, R. Tomas, F. Zimmermann 2012 CERN-ECFA-NuPECC Workshop on the.
4 th ATF2 Project Meeting, 31 May 2007 A. Seryi 1 Summary of SLAC simulation study of emittance growth in the ATF extraction line SLAC team: J. Amann,
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
Alignment and stability session
Near IR FF design including FD and longer L* issues
Dynamic Aperture Studies with Acceleraticum
Benchmarking MAD, SAD and PLACET Characterization and performance of the CLIC Beam Delivery System with MAD, SAD and PLACET T. Asaka† and J. Resta López‡
Tuning and Alignment of the ATF2
ATF2:Summary of Tolerance
Beam-Gas Inelastic scattering in CEPC partial double ring
Intra-Beam Scattering modeling for SuperB and CLIC
Updates on IR and FF for super-B factory
ATF Extraction Septa Magnetic Modeling with ANSYS
Beam Delivery System Schedule at ILC2010
Chromatic Corrections in LCLS-II P. Emma, Y. Nosochkov, M. Woodley Mar
First look at final focus part of super-B factory
Final Focus Optics Test at ATF
Optics Design of the CEPC Interaction Region
Final Focus optics for Possible New B-Line
ILC DR instability simulations
Raimondi-Seryi Final Focus for e+e- Factories?
Studies of crossing angle and SR effects for CLIC TENTATIVE
Yasuhiro Sugimoto KEK Feb.4, 2008
Presentation transcript:

Work in progress..  Beam tracking with SAD through ATF combined optics: extraction line and proposed KEK final focus  Three tracking routines (good agreement) Mauro Pivi, Okugi-san, Andrei Seryi

DX (m) BX BY  1/2 (m) SAD: Combined extraction line and final focus

Beam tracking with SAD Not yet combined: only final focus As expected

Beam tracking with SAD All line combined: extraction + final focus DP (%) sigx (m) sigy (m) sigx/sigx0 sigy/sigy E E E E E E E E Is real effect ? Need to re-check combined optics ?!

MAD Bandwidth at “IP”: BX and BY vs energy spread DPSAD