25.2.04TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.

Slides:



Advertisements
Similar presentations
Present Procedure for cutting stuck casing on Drilling PLATFORM
Advertisements

Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
TRD ROC Status Clemens Adler TRD Status Meeting TRD ROC Status.
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
/06/2015 Christian J. Schmidt GSI Production of ALICE TRDs Progress and Quality Development Alice TRD Chamber Production Meeting Darmstadt Feb.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
TRD Collaboration meeting GSIClemens Adler TRD Production in Heidelberg Manpower/Resources/ Timescales.
TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.
TRD Status meeting GSI Clemens Adler TRD ROC Status.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Walls crates cables gas chambers electronics CERN adb.
Engineering Design Review for TRD-Readout Chamber
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
USA ZAMA BASIC BIS. USA ZAMA What is BIS ?  What does BIS mean? – BIS is an acronym for B alanced I dle S ystem – The BIS system is part of the idle.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
T.Schneider/LHCb Muon EDR
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
GEM tests at BNL Zvi, Sasha, Ilia and others. Triple GEM detector tests Last Tuesday after HBD meeting we exchanged CF4 by Ar/CO2 but still there were.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Leach Backplate and Connector Mount Critical Design Review Iain Marcuson 12/03/2013.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory
Quality Control Chamber Production
new straw end plug: D=10.6 mm straws support frame Levan option
T1 status (a selection from EDR presentations)
Far Detector Activities Late 2017 – Early 2018
After service guide for changing PCB
Presentation transcript:

TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results

TRD Collaboration meeting GSIClemens Adler Production of first Chambers Nov/Dec: Vist from Oleg and Sasha (Dubna): Parallel production of 2 chambers at Heidelberg Test of chambers: Christmas January 2004 New(s) (Challenges): -Glueing of Padplane-panel- assembly (100 cables have to be fed trough holes) -Wacosit Profile extruded in final shape (easier to use than standard G10 parts) -Winding machine after modifications

TRD Collaboration meeting GSIClemens Adler Padplane glueing Feeding cables trough Backpanel cutouts worked well Glueing of Padplane to Honeycomb works, but can still be improved

TRD Collaboration meeting GSIClemens Adler Wacosit profiles Wacosit is behaving good, minor quality improvements are discussed with Manufacturer

TRD Collaboration meeting GSIClemens Adler Wiring Oleg glueing Anode wires

TRD Collaboration meeting GSIClemens Adler What we learned: All current materials behave well. Tooling needed: –Positioning of wire ledges, –Distance ledges –Crane for lifting of winding frame (installed in January) –New winding frames (arrived)

TRD Collaboration meeting GSIClemens Adler Tests Dark current: (Was a Problem with Prototype chambers) At first dark current started at ~ V. After some conditioning (over night at <50 nA) Dark Currents <1 nA Leak Rate Gain uniformity

TRD Collaboration meeting GSIClemens Adler Preparation for tests Grounding of Padplane: –Adhesive copper tape: not reliable –Foldback clips, w. conductive foam: Complicated to use ->use of PCB with real connectors to ensure reliable grounding of Padpane while testing (in devel.) Gas filling: Issue: time Procedure: flush Chamber with l/h Ar/CO2 with open Gas-in-outlets ppm O2 level after 2-3 h. Connect outlet etc. and flush at 20 l/h overnight ->few ppm level next morning

TRD Collaboration meeting GSIClemens Adler Leak rate Determined by measureing O2 concentration (and assuming diffusion leaks) Upper limit: 1,5-3 mbar*l/h Test chamber performance: <0,5 mbar*l/h Problem: very large leaks (some l/h) will also show „reasonable“ leak rates (<3mbar*l/h) with O2 method. Solution: –Check that gas exits chamber down to low flow rates (1 l/h) –Use sniffer to detect leaks

TRD Collaboration meeting GSIClemens Adler Leak rate cont. Leakage of two connected chambers: Sniffer could detect leaks at gas connections. ->grease should be used to improve leak rate

TRD Collaboration meeting GSIClemens Adler Gain Uniformity Chamber1 Left: copper tape grounding Below: foldback clips