LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.

Slides:



Advertisements
Similar presentations
ARA Production Status Jiwoo Nam. Overall Still Procurement Stage Mechanics under fabrication Delay on DAQ-stack boards, UW/UMD.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Questionnaire Response
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
TDR2 FM board tests D. Haas Test Setup Test Procedure Functional tests Results Test Schedule.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
ATLAS Liquid Argon Calorimeters Geneva Group Alain BLONDEL Arno STRAESSNER Ahmed ABDELALIM Daniel LA MARRA Eric PERRIN Gabriel PELLERITI Gilbert VIOLLAT.
Uli Schäfer JEM Status and plans Algorithms Hardware JEM0, JEM1 Tests Plans.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Walls crates cables gas chambers electronics CERN adb.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Situation with industry
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Tracker Summary Alan Bross MICE CM October 10, 2007.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Setup, Tests and Results for the ATLAS TileCal Read Out Driver Production J. Alberto Valero Biot IFIC - University of Valencia 12th LECC - September.2006.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
17 Apr 2002 MCLARG Electronics Meeting News HEC Preshaper PRR passed on Thursday Apr 11 LECC02 (Workshop on LHC Electronics) will be held in Colmar, France.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
University of Wisconsin
TOTEM Electronics Status
LKr status R. Fantechi.
News about the WA104 Programme
TileCal upgrade EVO meeting Demonstrator tesks
T1 Electronic status Conclusions Electronics Cards:
EMU Slice Test Run Plan a working document.
10/month is the present production rate 2 FTE + sporadic contributions
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
TileCal ROD Commissioning Counting Room Installation
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005

LAr ROD Status - Arno Straessner2 Recent News from ROD Boards Finalizing the purchasing of components, only a few items missing: –optical receivers from Taiwan –24000 capacitors “lost” at CERN –remaining 225 PCBs The price enquiry procedure for the assembly of the 245 RODs is finished and we received 2 offers: –a french company (ARDELEC) : CHF –an italian company (Seisystem): CHF Daniel and myself visited Seisystem Company made a good impression Decision: assembly will be done in Italy Seisystem started to prepare the mask for the soldering The components and PCB boards are on the way to Italy

LAr ROD Status - Arno Straessner3 Revised production schedule We asked to mount 2 boards as soon as possible, including optical receivers: expected for end of January Annie and someone from LAPP need to go to Seisystem to set up a electronic test system (JTAG) used to control quality directly after production 18 more boards of the pre-series will be assembled on the automatic machines If the 2 first boards pass also the tests on the Geneva test bench the pre- series will be completed Then the pre-series will be tested If the boards are ok the remaining 225 boards will be built

LAr ROD Status - Arno Straessner4 Quality Control 1 st step at manufacturer: JTAG test 2 nd step at Geneva and LAPP Annecy: –Static tests: accessing the active components on the board –Dynamic tests: sending data through the ROD Currently working to finalize software for test bench Static tests for motherboard are already included Dynamic tests are being developed → interaction with LAPP Hardware setup at Geneva nearly complete: –Crate, VME CPU, optical cables, TTC modules, trigger module, transition module, Slink and PC readout –We had a data injector for tests before Christmas –We will get our own injector end of January → complete data flow

LAr ROD Status - Arno Straessner5 Status of Other Items ROD cooling plates are being produced: 20 are already soldered Cooling water connectors need to be glued – they are ordered ROD cooling station for USA15 is being built at CERN Expected to be completed by end of March, including cooling manifolds Cooling drawers need to be build: lower priority than RODs 2 more ROD crates and power supplies arrived at CERN They have the final design: need 3 people to install them in the rack (or 2 strong people) 13 ROD crates are ordered for May older ROD crates need to be updated later

LAr ROD Status - Arno Straessner6 Summary The ROD project is advancing and on schedule We are looking forward to the first boards from series production Now we need to think about installation issues The general installation plan for the hardware of the LArg ROD system needs to be developed/revised