Stephen Milton 12 Jan. 2005 IDR of Undulator System Fixed Supports 12 Jan. 2006.

Slides:



Advertisements
Similar presentations
By Eva Freund, The IV&V Group, Inc.
Advertisements

Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Project Clarification: Objectives Tree BE 20–Engineering Design with Computer Applications Week 4: 15-September-2004.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
XFD – XF Engineering Group October 20, 2005LCLS Undulator Alignment and Motion System1 Precision and repeatability of cam-shaft system in both directions.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Geoff Pile LCLS Fixed support IDR 12 th January 2006 LCLS Fixed Support IDR Introduction and History Are special fixed supports needed?
1 Feel free to contact us at
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
LCLS Undulator Alignment and Motion Review 1 LCLS schematic view LCLS Undulator Alignment and Motion Review.
1 As Class Convenes u Determine your team from the list at the front of the room u Find your team’s table; sit down & introduce yourself u Open up your.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Stability of Mechanical Systems S. Sharma and V. Ravindranath.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
SystematicSystematic process that translates quality policy into measurable objectives and requirements, and lays down a sequence of steps for realizing.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
Slide 1 of 17 Lessons from the Foundation Learning provision for the new 16 to 19 Study Programmes Discussion materials Issue 2: The development of English.
Profession GermanyNorth America Based on international PEERS survey May 2015.
Dr. Stephanie Wynne-Jones Dr. Hayley Saul James Taylor.
IANA Governance Changes – NANOG 62 Lightning Talk John Curran, ARIN.
Creating Pathways for Education, Career and Life Success Webinar: Developing a Pathways Plan January 18, 2013 Facilitated by Jeff Fantine, Consultant.
EvergreenEcon.com ESA 2011 Impact Evaluation Research Plan Public Workshop #1 February 20, 2013 Presented By: Steve Grover, President.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Team: Wolfgang Burkert, Haimo Jöhri, Uwe Barth Mechanical precision and vibration behavior of mechanical supports Johan Wickström GFA-ATK.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
HIGH SCHOOL PROJECT PLANNING MEETING October 14, 2013 Crabtree, Rohrbaugh & Associates, Architects Agenda Schematic Design Concept D Option – 1 Site Floor.
Executive Session Director’s Progress Review of the NOvA Project August 4-5, 2010 Dean A. Hoffer.
Possible Agenda Working Week Day one Introductory session 8: :00 Organization and Goals Cathode Planes Requirements, Assumptions, Alternates Field.
Welcome to AB140 Introduction to Management Unit 6 Seminar – Control Dr. Brenda Harper.
Safety in Practice Learning Session 3 PHO and Facilitator: WPHO – Andrew Jones Team members: Kirsty Laws, Allie Waretini, Mel Lanz, James Recordon Silverdale.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
XYZ Cricket Club Marketing Plan. Executive Summary This is the overview of the marketing plan which serves as a summary for club executives and members.
Welcome Class of 2020 Anchor Fest March 22nd class of th grade principal: Mr. Norris 9 th grade counselor: Mrs. BennewitzFest March 22 nd.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
Executive Session Director’s Conceptual Design Review of Mu2e Project May 3-5, 2011 Jim Yeck.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
XYZ Cricket Club Promotions & Communications Plan
Director’s Progress Review Closeout Meeting
Introduction to Nanomechanics (Fall 2012)
Project Idea Presentation Template
Director’s Progress Review Closeout Meeting
Assessment Workshop September 16, 2009.
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Charge for the LCLS Undulator Magnet Review Committee: Nov. 14th, 2003
Welcome! 6th Grade Science
After Action Review (AAR) Plan
Undulator Integration Test Status
Fixed Support Design & Testing
Undulator Assembly and Installation Planning
Undulator Alignment Plan
Presentation transcript:

Stephen Milton 12 Jan IDR of Undulator System Fixed Supports 12 Jan. 2006

Stephen Milton 12 Jan Agenda 1:00 10 min Charge to the Committee Milton 1:10 15 min History of Design Pile 1:25 60 min Engineering Details Sharma Including Thermal Alignment Installation All modelling etc. 2:25 15 min Break 2:40 40 min Design Details Rusthoven 3:20 10 min Summary Sharma 3:30 60 min Executive Session Closed Committee 4:30 30 min Closeout

Stephen Milton 12 Jan Charge to the Committee The LCLS undulator system requires very stable supports in order to achieve the desired system stability over long periods of time. From the floor upward the supports consist of A fixed support base pedestal A transition plate which allows field adjustments of carried components Cam movers for fine remote position control And a girder system supported on the cam movers

Stephen Milton 12 Jan This review will focus on the support system from the floor up to the base of the cam movers. Although the committee should feel free to comment on all aspects of the items being review, we would like to have in particular comments on the following aspects of the design Can the system, as designed, achieve the required stability performance? Of particular importance is the stability in time of the supports when subjected to expected temperature swings. Is the pedestal sufficiently stiff, both mechanically and thermally? Is the mounting of the pedestal to the floor sound? Will installation be straightforward? Is the concept used to provide field adjustment of the above mounted girder a sensible concept? Four vs. three points of contact and x/y/z positioning Sizing of all transition piece components Ease of use during survey and alignment Durability over time Please comment on the ease of use during survey and alignment Is the concept for mounting the cam movers to the transition piece sound?

Stephen Milton 12 Jan We will use your input to further develop the design into a final design that will be the primary support for the LCLS undulator system. Any and all of your comments are welcome. We would like to have a written report delivered to us within 2 weeks time.