Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.

Slides:



Advertisements
Similar presentations
1 Micro Electric Urban Vehicle Phase III Students: Nathan Golick Kevin Jaris Advisors: Mr. Gutschlag Dr. Anakwa.
Advertisements

Bad News Bots E2 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland Concept Design Review.
Robo-FootballE2 Project Design Review 1 - 1/31/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
AME Senior Design Group E3: Hewlett-Packers Concept Design Review April 24, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Jib Transfer Bench – P /11/2012.  Problem Definition  Customer Needs / Specifications  Functional Decomposition  Benchmarks  First CAD Design.
Robotics Intensive: Day 6 Gui Cavalcanti 1/17/2012.
MOTORS.  Need a Motor That is Capable of Moving the Mirrors to a Fairly Precise Angle.
RAVE Remote-Controlled Assault Vehicle Andy Knutsen Scott Helgeson Susan Jordan Johnny Lam Matt McBurney.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
SERVO MOTORS Tech Topic By Ryan Bidlack. Background A servo motor is composed of a DC, AC, or an AC induction motor and a feedback control. A servo motor.
Robotic Football Group E1 CDR Team Top Gun April 22 nd, 2008.
Bad News Bots E2 Project Design Review 6 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
CUTTHROAT ENERGY Preliminary Design Review. Sponsored by:
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
AME Senior Design Group E3: Hewlett-Packers January 29, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.
AME Senior Design Group E3: Hewlett-Packers February 19, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
PDR: 2/22/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
EDGE™ MAV Control System Project # P09122 Concept Design Progress.
Engineering H191 - Drafting / CAD Gateway Engineering Education Coalition Lab 3P. 1Autumn Quarter DC Motors Lab 3.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Team HazardHawk Team HazardHawk Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
A6: Team Rallye Potable Water Still Presented by: Entire Group September 28, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
A6: Team Rallye Potable Water Still Presented by: Nicole Del Rey October 3, 2006 Eric SabelhausNicole Del Rey Mike McConnellTim Rodts.
Stepper Motors Jason Wells. Background Brushless, synchronous electric motor Brushless, synchronous electric motor No feedback necessary (open loop) No.
Bad News Bots E2 Project Design Review 2 - 2/7/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Low Cost Fundus Camera P15590 December 11th, 2014
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Robotic Artificial Intelligence Toy (R.A.T.) CPE 4521 Final Design Presentation Presented by Shane R. Bright, Erik R. Brown, Wing-Seng Kuan, Micheal T.
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Concept Design Review THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI April 24, 2008.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
EE/CS 480 Fall October, 2007 University of Portland School of Engineering Project Black Cap Robotic Prosthetic Arm Team Josh Triska Corban Monger.
OVERALL ROBOT DESIGN, FTC STYLE PRESENTED BY: ANDY BAKER Sept
Chapter 30 product planning Section 30.1 Product Development
Bad News Bots E2 Project Design Review 4 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Motors & Motor Drivers ECE 450.
Team HazardHawk Team HazardHawk Last Week  Concept Finalization Complete  Preliminary CAD of Concept Complete  Budgetary Estimates Parts Selection.
CSE Senior Design II Ordering Parts for Senior Design Projects.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
John Wloch Wind-Aid Preliminary Design Review 5 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
AME Senior Design Group E3: Hewlett-Packers February 7, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
INTRODUCTION TO ROBOTICS Part 3: Propulsion System Robotics and Automation Copyright © Texas Education Agency, All rights reserved. 1.
MyFloridaMarketPlace Analysis 2.0 Functional Overview.
1 SPIRIT Silicon Prairie Initiative on Robotics in Information Technology Curriculum Overview.
AME Senior Design Group E3: Hewlett-Packers (Robo-football Quarterback) March 27, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Engineering H191 - Drafting / CAD Gateway Engineering Education Coalition Lab 7P. 1Autumn Quarter DC Motors Lab 7.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Bad News Bots E2 Project Design Review 7 - 3/20/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Electrical and Computer System Design
Level 1 height Level 2 width Height = 2, 2 levels Width = 4

Class Greeting.
Senior Design Project 10-25
Preliminary Detailed Design Review: P18001
Presentation transcript:

Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair

Introduction Project Definition: – Develop a Robotic Football Competition and produce a proof-of-concept prototype. Discussion: – Budgeting Review & Revised Concept. – Component Purchasing & Trade Studies.

Previous Week’s Action Items Item 1: Preliminary Budgeting Review – Wrote the first draft of concept design parts list and pricing. – Divided budget into categories and individual components. – Estimated the current total cost at $370.00

Budget Sheet Summary: Component:Cost ($): Motors:50.00 RC, Servo, DC Stepper Electrical: Mini Max, H-Bridge, Batteries, Speed Controller Materials: Rotating Platform, Field, High Density Polyethylene, Velcro, Ball TOTAL:370.00

Previous Week’s Action Items Item 2: Revised Robot Concept Designs – Simplified Quarterback and Running Back/Receiver model. – Based both models on similar chassis design. – Robot Dimensions: Height – 8 1 / 2 ” Depth – 5” Width – 5” Thickness – 3 / 16 ”

Current Status of Concept Status of the Design – Conceptual design phase. – Established first draft of budget. – Developed revised prototype sketch with dimensions and CAD model.

Current Graphic

Next Week’s Action Items Item 1: Purchase Budgeted Components – Investigate concept design components. Component options unrelated to trade study topics: – Second Mini-Max/PIC. – Speed Controller. – H-Bridge. – Research supplier pricing. – Buy components necessary to concept design.

Next Week’s Action Items Item 2: Develop Trade Studies – Investigate individual trade study topics. – Build programs and models for each topic. – Meet to report individual progress to the group on 2/19 and 2/21.

Conclusion Important Points: – Budgeting Review. – Revised Concept. – Component Purchasing. – Trade Studies Development.

Questions? Any questions?