DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.

Slides:



Advertisements
Similar presentations
c EDUCATION, TECHNOLOGY AND BUSINESS c EDUCATION, TECHNOLOGY AND BUSINESS The Infrastructure Cable Internet Satellite.
Advertisements

E163: Laser Acceleration at the NLCTA Goal: Demonstrate the technical feasibility of laser-driven particle acceleration Photonic band gap structures made.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
MICE WBS rebuild/extract: Top level: – –PM: (Long acting) Level 2: –MICE Muon.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
Project Update 5/9/06 E. Colby, E163 E163: Laser Acceleration at the NLCTA Goal: Demonstrate the technical feasibility of laser-driven particle acceleration.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
© ABB Group July 3, 2015 | Slide 1 IRC5C second generation Overview Product Management, ABB Robotics, October 2014.
1 MICE Hall Layout MICE Collaboration Meeting, LBNL, February 12, 2005 Paul Drumm for Yury & the RAL team.
The Case: Computer vs. Human. Computer Case Contains the major components of the computer. It helps protect them from outside elements. Cases are usually.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
PXL Rack Layout Draft Leo Greiner January 2, 2013 DateCommentsPersonVersionApproved 01/02/2013Initial versionLG1.0LG 01/09/2013 add additional PS in WAH.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
IRB Space Choice. Considerations Patient access – Most walking, some wheelchair – Access for ambulance stretcher – No line of sight to bench work (?)
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
Modifications assembly zone CRAB Cavity SM18 View assembly zone with Cavitys LHC cryomodule/string CRAB + gantry/cryomodule SPL (plan: LHCACFGA_T0036)
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
DT2 Scientific Tea CLOUD Technical Challenges Antti Onnela PH / DT2.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
PX FY14 Budget PXIE Infrastructure R. Stanek J. Leibfritz.
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
FACILITIES PLANNING ISE310L SESSION 25 Warehouses, November 17, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? Any supply chain or facilities stories or.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
The Next Generation of a Gamma Irradiation Facility GIF++
E4 hall technical specifications
$150K Chicago/ANL seed funding for Braidwood site investigation
CLEX* Status and Plans CTF3 complex CLEX
MICE AFEIIt Timing and Triggering
Racks Coordination 09 September 2011 E. Negodin
Racks Coordination 16 September 2011 E. Negodin
مديريت موثر جلسات Running a Meeting that Works
The Big 6 Research Model Step 3: Location and Access
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
Around the room Orders of operations.
Ameri Energy Group SunShine II Simulations
Presentation transcript:

DAQ&CM Infrastructure Paul Drumm

Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear definition); Start to layout control room –False floor? –Height of racks? –Cable trays at height?

Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear definition); Start to layout control room –False floor? –Height of racks? –Cable trays at height?

Questions How many racks are needed? Where are they needed? How many cables/etc are needed between the control room and the hall?

Rack Count

Black Holes in the MLCR Holes back to the MLCR 5 max Need shielding –Better to have some spare but not to overdo it