LAYOUT AND DESIGN.

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

PRODUCTION FUNCTIONAL MANAGEMENT Creation of utilities by converting raw material to final product by various scientific methods and regulations Very important.
Section 8-2 The HACCP System.
Creating a functional, aesthetic service area
Product Receiving, Storing, and Issuing
Food & Beverage Management
HAZARD ANALYSIS CRITICAL CONTROL POINT Food Safety in Action for Transported Meals North Carolina Department of Public Instruction Safe and Healthy Schools.
MARKETS AND ABATTOIRS The construction sites should be free of nuisance conditions, contamination, should have available adequate water supply for cleaning.
Inventory Control, Cost & Deterministic models Unit-III Revised version.
Location Strategy and Layout Strategy
Warehousing Decisions
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
Facility Planning & Design Prepared by: Brannon McGrotha.
Operations Management
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
1 Facility Design-Week 1 Introduction to Facility Planning Anastasia L. Maukar.
Food and Beverage Management Facility Design, Layout and Equipment.
BY: GROUP 2 Food Safety Regulations and Standards.
Chapter 4 Food Product Flow.
Engineering Manufacturing Facilities
Process Selection and Facility Layout
Plant Layouts Prepared by Bhakti Joshi June 20, 2013.
Operations Management Layout Strategy
Chapter 4 Office Layout.
Design and Layout of Foodservice Facilities John C. Birchfield 2008
Designing Goods and Services and Process Selection
Design & Layout of Foodservice Facilities
Planning and Purchasing for Your Event. Lesson Objectives After completion of this lesson, occasional quantity cooks will be able to: Manage factors necessary.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection Facilities Layout Line Balancing.
1 ISE 195 Fundamentals of Industrial & Systems Engineering.
Prepared by Bhakti Joshi June 27, 2014
Planning Back- of-House Support Areas Chapter 4 (c) 2014 by John Wiley & Sons, Inc.
How is a manufacturing facility planned?
The Safe Food Handler H.A.C.C.P. Test Review FD2.05 FC 4.05.
KITCHEN LAYOUTS AND DESIGNS
Receiving: The Process l Inspect delivery and check against P.O. »blind receiving »invoice receiving »electronic receiving l Check against the invoice.
Preparation for Design Planning 1. Study trends 2. Update on design and equipment possibilities »personal visits »read catalogs & trade journals »ask others.
Unit 6 Production Chapter 9: Production Chapter 10: Food and Beverage Service.
C h a p t e r 20 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Break-even analysis Break-even point Budget.
PLANNING & UTILIZING AN EFFICIENT SPACE
Goal  designed so employees can do their job efficiently  designed so customers can enjoy their dining experience without distraction 1. Balance.
MH...CH LECT011 What is Material Handling? Materials handling is the science and art both involving the moving, packing and storing of substance.
Welcome to Developing Standard Operating Procedures Heidi Dupuis, RD, SFNS ODE – Child Nutrition Ode.state.or.us/services/nutrition.
Foodservice Assessment. Demographic ●~6,500 guests per week o Middle aged o Middle class ●Sales ~$130,000 per week.
11-IE IE IE-60  Facilities design for manufacturing systems is extremely important because of the economic dependence of the firm.  Facility.
Chapter 6 Facilities Layout.
L – 5 Distribution Channel - Warehousing and Inventory Management.
Facilities and Equipment Management National Food Service Management Institute The University of Mississippi 1.
CHAPTER TEN-PLANNING AND EQUIPPING THE KITCHEN Factors to Consider When Planning a Kitchen’s Layout Selection Factors for Purchasing Kitchen Equipment.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Aim - Customer satisfaction at optimum cost. PRODUCTION MANAGMENT.
Basic Layout Types Product layouts Process layouts
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Auxiliary Services Requirement Space
Materials Management Intro, Definition, Functions, Objectives, Stages, Factors responsible, Importance.
Layout Strategies UNESCO-UNITWIN UUOOI-2015 Prepared by
Process Layout Chapter #6.
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Bell Work List 3 safety procedures that we have here at school-why we have them- and the purpose behind them. 6/30/2018.
A Manager’s Responsibilities
A Road Map to Food Safety
Preparation for Design Planning
FACILITY LAYOUT Facility layout means:
CHAPTER TEN-PLANNING AND EQUIPPING THE KITCHEN
Process Selection and Facility Layout
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Facilities Planning and Design Course code:
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

LAYOUT AND DESIGN

FACILITY PLANNING Know objectives, goals, and basic functions of department Menu and menu pattern Purchasing system Production and service system Workload and personnel data Quality standards

SPACE ALLOCATION Profit vs non-profit Dining space > heaviest customer lead at any time > speed of service > menu variety > length of serving period > space allocation per seat Production and service space > Initial: based on number of beds – 20-30sq. Ft./bed > Later: menu, purchasing system, production system, service system

PATIENT SERVICE SET-UP Type of tray service Number of patients served Menu variety for regular and modified diets

STORAGE Menu – market form of food purchased most important Stock level required Frequency of delivery Dry storage Refrigerated and low-temp frozen Receiving and inspection of deliveries

SPACING Equipment = 30% of space Work areas, aisles, space for cleaning and ease of operation = 70% Width of main aisle = 60” Width of aisle for mobile carts = 50”

EQUIPMENT SELECTION Menu is basis for determining needs Performance Materials, gauge and finish of metals Sanitation and safety (NSF, UL, US Dept. of Health and Human Services)

LAYOUT Work centers – smallest area where related tasks are performed Work areas that allow use of two hands most efficient U shaped work areas discourage through traffic Function Volume to be prepared Number of employees Kind and amount of equipment

CONCEPT OF FLOW Most direct and quickest rout without criss-crossing, backtracking, interference, or delay Functions proceed in a direct, straight forward sequence Smooth, rapid production and service, minimum of time spent by workers Eliminate delay and storage in processing and serving Ensure minimum handling of materials and tools, minimum worker attention for equipment Maximum utilization of space Quality control at all critical points Minimum cost of production

FLOW Work aisles separate from traffic aisles RECEIVINGSTORINGPREPARINGCOOKINGDISTRIBUTING SERVING

OTHER FACTORS Efficient use of utilities Efficient use of equipment Efficient use of personnel Safety sanitation Environmental factors: lighting temperature noise