1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
Progress Energy Florida 2007 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 23, 2007.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Westar Energy Emergency Preparedness and Restoration TFR Meeting June 26, 2012 Jim Tyler Director, Distribution Services.
Duke Energy Ohio Standby Rates Jim Ziolkowski, P.E., Rates Manager September 13,
Ward 21 Reliability Cedarvale and Surrounding Area Prepared for Councillor Mihevc Toronto Hydro System Planning March 25, 2015.
Learning Forum: Regulatory Issues Affecting Contracts and Operations in the Near Term Presented to the SEE Joint Use Committee by Charles A. Zdebski Troutman.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
Dayton Power and Light Patrick Slone EMS Safety Coordinator.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
OSS Reconciliation Billing December 2004 Project Operation Support System (OSS) Cost Recovery Billing TOMMY WILLIAMS, SR. PRODUCT MANAGER TITANIA ALEXANDER,
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Experience you can trust. Hurricane Hardening Commission Staff Workshop on Electric Utility Infrastructure Richard E. Brown, PhD, PE Tallahassee,
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
Why Make NJ Energy Strong? Sandy, Hurricane Irene and the October 2011 snow storm represent extreme weather patterns that may become commonplace. For.
Introduction & Opening Remarks l Hurricanes of 2004 & 2005 highlight the need for a fresh look at these issues l We support this effort and will be active.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Net Metering Fall 2009 Customer Meetings. What is Net Metering?  Net metering allows the meter to “run backwards” and record generation in excess of.
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Outage Communication – Improving the Flow of Information Presented at the EEI Transmission, Distribution, and Metering Conference Tucson, Arizona October.
Chicago Advanced Energy Demand Response & CSP Evolution Kellen Bollettino Comverge Inc. 10/23/14.
Standards Review Subcommittee Update August 17, 2010.
Electric Utility Infrastructure Commission Staff Workshop January 23, 2006.
Hurricane Rita October 12, Hurricane Rita’s Aftermath Second worst storm in Entergy history At the peak, 766,000 customers without power in Texas.
Florida Municipal Electric Utilities May 6, 2009 Paul Kalv, Director City of Leesburg Electric Department Florida Public Service Commission Docket No.
Tampa Electric Company 2009 Hurricane Season Preparation Regan Haines Director, Energy Delivery May 6, 2009.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2014 Hurricane Season Preparation Informal Meeting for Electric Utilities with Florida Public Service Commission Staff March 26, 2014.
2009 Hurricane Preparedness Richard Shaheen Sr. Director, Engineering & Technical Services May 6, 2009.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
© 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Wildfires, Vegetation Management and Powerlines Presented to Senator.
2009 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 6, 2009.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
2015 Storm Readiness Report Kurt Miller, Director of Engineering Suwannee Valley Electric Cooperative, Inc.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
A Preliminary look at Peak Loads and Resources for 2007 and Policy Issues to Consider David Ashuckian, P.E., Manager Electricity Analysis Office Joint.
Informal Meeting with FPSC Staff 2015 Hurricane Season Preparation March 18, 2015.
Bywater Reliability Update Gary Huntley Entergy New Orleans, Inc. Regional Manager Entergy New Orleans, Inc. July 28, 2010.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Application of Northern Virginia Electric Cooperative PUE
2008 Hurricane Season Preparations
Florida Public Service Commission
Hurricane Preparedness Plan 2008
Progress Energy Florida 2008 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 1, 2008.
GMD Data Request NERC Rules of Procedure Section 1600
2007 Hurricane Season Preparations
2018 Attachment O customer meeting
Florida PSC 2014 Hurricane Season Preparation
Florida PSC Hurricane Preparedness Meeting May 6, 2009
2007 Hurricane Season Preparedness Briefing
DISTRIBUTED GENERATION in Massachusetts
New York State Utility Inspection & Testing
Presentation transcript:

1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop

2 Presentation Topics Goals  Increase efficiency while increasing the scope of subject matter being reviewed  Promote self-critical reviews Old v New March Reporting Step through Vegetation Management as an example Normalizing reliability indices  “Actual” – adjustments = “Adjusted” Report appendices: all the various metrics

3 What is our goal? Storm Hardening efforts first discussed at the November 29, 2005 Internal Affairs Storm Hardening Goals – are general public interest goals  Minimize damage due to major weather related events  Minimize restoration times following major weather events  Minimize the number and magnitude of rate increases Reliability activities affect non- storm days and storm days. Efficient use of resources Promote utility self-critical review through reporting

4 Old Report Process (Storm Hardening, Pole Inspections & Other Reliability Indices) File summary data – without utility self-critical discussion or analysis  Staff requests selected detailed data  Trends in detailed data discussed/disputed with utility  Interpretations of trends in data discussed/disputed with utility  Management Audits  Drill-down audits of data records supporting summary reports.

5 A Complete Reliability Report Storm Hardened Facilities Wood Pole Inspection Program Vegetation Management Other Storm Hardening Initiatives  Overhead/Underground Overall Reliability Adjustments Resultant Reliability  Overhead / Underground Customer Complaints Appendix with supporting data Appendix

6 Storm Hardened Facilities Describe each storm hardening activity undertaken in the field during 2006 Describe the process used by your company to identify the location and select the scope of storm hardening projects Provide the costs incurred and any quantified expected benefits Discuss any 2007 projected activities and budget levels

7 Wooden Pole Inspection Program Docket Nos EI & EU Provide a detailed description of the Company’s wood pole inspection program Discuss 2006 accomplishments Discuss projected accomplishments for 2007 Include the requirements of the applicable Orders (Appendix)

8 Vegetation Management Program Docket EI Provide a complete description of the Company’s vegetation management program (policies, guidelines, practices) for 2006 and 2007 in terms of both activity and costs  Transmission  Distribution Feeders Laterals Service Drops  Define terms such as danger tree, spot-trim, demand trim, and mid-cycle trim  Describe the criteria used to determine whether to remove a tree, replace a tree, spot-trim, demand trim, or mid-cycle trim, etc  Provide an analysis of the cost and benefits of the Company’s program vs. a three-year trim cycle program

9 Vegetation Management Program (Continued) Describe tree clearing practices in utility easements and authorized rights-of-ways Identify relevant portions of utility tariffs pertaining to utility vegetation management activities within easements and authorized rights-of-ways Tree removal practices for trees that abut and/or intrude into easements and authorized rights-of-ways

10 Vegetation Management Program (Continued) Describe tree clearing practices outside of utility easements and authorized rights-of-ways Identify relevant portions of utility tariffs pertaining to utility vegetation management activities outside of easements and authorized rights-of-ways Tree removal practices for trees outside of easements and authorized rights-of-ways Identify relevant portions of utility tariffs pertaining to customer vegetation management obligations as a term or condition of electric service

11 Vegetation Management Program (Continued) Describe Company practices regarding customer trim requests Describe the criteria used to determine whether to remove a tree, replace a tree, spot-trim, demand trim, or mid-cycle trim, etc Discuss any 2007 projected activities and budget levels. Include the requirements of applicable Orders

12 Other Storm Hardening Initiatives Docket EI For each of the other ongoing storm hardening initiatives provide a detailed discussion describing the activity and costs incurred for 2006 and projected for 2007 Overhead/Underground  Describe the process used by your company to identify the scope of storm hardening projects  Provide any quantified expected benefits  If benefit quantification is not practical or possible at this time, explain when or how the cost-effectiveness of the activity is assessed.  Include the requirements of applicable Orders

13 Storm Season Ready Status Describe the efforts the Company is taking to be storm-ready by June 1, 2007  Revise/update June 5, 2006 Internal Affairs Presentation

Reliability Performance (Rule F.A.C) Discuss overall performance absent adjustments (Form 102)Form 102 Describe the level of detailed reliability data the Company tracks Describe Company efforts to increase critical review of detailed reliability data Describe the process used by your company to identify and select the level of detailed reliability data Discuss adjustments Generation Events Transmission Events Distribution Events Extreme Weather Discuss adjusted performance

15 Generation Events - Adjustments (Rule F.A.C continued) Discuss EACH generation event that resulted in customer outages Address whether the event was localized or system-wide Describe the Company’s efforts to avoid or minimize any similar events in the future in terms of the level of costs incurred and outage duration (Appendix) Provide the 2006 service reliability data for each generation outage event that is excluded from your Company’s 2006 Annual Distribution Reliability Report pursuant to Rule  A table  Electronic file  Date, C, CMI, CI, Total Repair Cost, Replacement KW & KWH Costs, etc

16 Transmission Events - Adjustments (Rule F.A.C continued) Discuss EACH transmission event that resulted in customer outages Address whether the event was localized or system-wide Describe the Company’s efforts to avoid or minimize any similar events in the future in terms of the level of costs incurred and outage duration (Appendix) Provide the 2006 service reliability data for each transmission outage event that is excluded from your Company’s 2006 Annual Distribution Reliability Report pursuant to Rule Appendix  A table  Electronic file  Date, C, CMI, CI, Total Repair Cost, etc

17 Extreme Weather (Rule F.A.C continued) Include in the discussion, the type of weather event, strength (wind speeds/surge-flood levels), locations affected, source of meteorological information, and the performance of overhead and underground systems Describe the Company’s efforts to avoid or minimize in terms of costs incurred and outage duration any similar events in the future.  For Example: reference specific storm hardening activity If the method of deriving the weather exclusion is different from the method used for 2005, please explain the changes and provide the CMI and CI for 2006 using the prior method. (Appendix) Provide the 2006 service reliability data for each extreme weather outage event that is excluded from your Company’s 2006 Annual Distribution Reliability Report pursuant to Rule Appendix  A table  Electronic file  Overhead & Underground statistics & forensics C, CMI, CI, L-Bar, Repair Cost, etc

18 Other Distribution - Adjustments (Rule F.A.C continued) Discuss the Causation of each type of distribution event that resulted in customer outages Describe the Company’s efforts to avoid or minimize any similar events in the future in terms of the level of costs incurred and outage duration (Appendix) Provide the 2006 service reliability data for each distribution outage event that is excluded from your Company’s 2006 Annual Distribution Reliability Report pursuant to Rule Appendix  A table  Electronic file  Causation, Date, CMI, CI, Total Repair Cost, etc

19 Distribution Substation (Rule F.A.C continued) Describe the five year patterns/trends in reliability performance of distribution substations Describe Company efforts to track the reliability of distribution substations Describe the process used by your company to identify and select the actions to promote substation reliability (Appendix?) Provide the number of distribution substations inspected during normal operations (non-storm related) for 2004, 2005, and 2006.

Adjusted Reliability (Rule F.A.C continued) Causes of Outages Events:  5-Yr patterns/trends in outage causation for each of the top 10 causes of outage events, including the frequency, duration, restoration time, cost incurred to restore service, remediation programs and remediation program costs  The process used to identify and select the actions to improve the performance in each of the top 10 causes of outages  2007 activities and budget levels addressing each of the 10 causes of service outage. Three Percent Feeder List:  Identify whether any feeders appear on the 3% listing more than once within a consecutive 5-Yr period and any actions implemented to improve feeder performance  The process used to identify and select the actions to improve the performance of feeders in the 3% feeder list, if any  2007 activities and budget levels directed at improving feeder performance. Regional Reliability Indices:  5-Yr patterns/trends in each regions reliability for each index and on any overall basis  The process used to identify and select actions to improve the regional reliability trends  Discuss any 2007 projected activities and budget levels directed at improving regional reliability performance.

21 Overhead – Underground Reliability Describe the five year patterns/trends in reliability performance of underground systems vs. overhead systems Describe Company efforts to separately track the reliability of overhead and underground systems Describe the process used by your company to identify and select the actions to promote underground distribution systems (Appendix) Provide Overhead and Underground MetricsAppendix  miles, number of customers, CMI, CI, MAIFIe, CEMI5 and L-bar for calendar year

22 Reliability Related Customer Complaints Describe the five year patterns/trends in reliability related customer complaints Describe Company efforts to correlate reliability related complaints with reliability indices for applicable feeder, lateral and subregion Describe the process used by your company to identify and select systemic actions to improve reliability due to customer complaints  If no such program exists explain why.

23 Appendix: 2006 Reliability Data Form 102 is the unadjusted Actual Data  Adjustments to the Actual Data supporting Form 102 Generation Events Transmission Events Distribution Events Extreme Weather Form 103 is the net Adjusted Data OH/UG Comparative Data  Extreme Weather Performance  All Other Weather Performance Pole Inspection Summary Data Storm Hardening Metrics (Electronic file) Feeder Specific Data and attached laterals  OH/UG Comparative Data: Miles, C, CMI, CI, Looping, etc  Feeder load growth, peak load, number of complaints