Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Diethard E. C. Moehr, I&S CTF EMC.

Slides:



Advertisements
Similar presentations
Safety for electronic systems High-frequency Filtering of DC Power Lines Technical, constructional and practical issues with filtering on dc power lines.
Advertisements

ELECTROMAGNETIC COMPATIBILITY Dr. Donald Church Senior Staff Engineer International Rectifier Automotive Systems November 17, 2005.
Conducted Immunity IEC
SWITCH-MODE POWER SUPPLIES AND SYSTEMS Silesian University of Technology Faculty of Automatic Control, Electronics and Computer Sciences Ryszard Siurek.
Noise Lecture 6.
"To be or not to be - shielded or unshielded? That is the question!" Presentation title (IMPORT THROUGH MENU View or Insert -> Header & Footer)
VARIABLE SPEED DRIVES AND FILTERS CLASSIFICATION AND APPLICATION.
Chapter Fourteen: Transmission Lines
LP33 Series UPS kVA 400Vac/CE
Designing a EMC Compatible Electronic Meter using AD7755 a.
® 04/29/2002 CISPR 22, Amendment 1 Ferrite Clamps Ghery S. Pettit, NCE Intel Corporation Corporate Product Regulations.
ESE – Andrew Rusek Applications of Computer Modeling in Electromagnetic Compatibility (EMC) Tests (Part1) P8. Field Pattern of Three Radiating.
CORRELATION BETWEEN RADIATED IMMUNITY AND COUPLING ATTENUATION
Instrumentation: ground and noise Temperature Measurement.
ULg - EMC Lab Cost 286 Wroclaw1 Research activities in Liège Ir. V. Beauvois, Ir. S. Coets, Ir. M. Renard and Ir. Ph. Camus
Current research work and plans Zbigniew M. Jóskiewicz Wroclaw University of Technology Institute of Telecommunication and Acoustics Wybrzeże Wyspiańskiego.
EDGE™ prepared by Prof. George Slack (EE) Copyright © 2006 Rochester Institute of Technology All rights reserved. Noise Immunity Transients and ESD Practical.
Industrial Solutions and Services Your Success is Our Goal EMC Hardening for apparatus and special product EMC problems Diethard E. C. Moehr, I&S CTF EMC.
COST286 meeting Barcelona 14/15 April BUTE Part 1 Conducted and radiated disturbance regulations for PLC devices János Löcher; György Varjú BUTE.
May 2005 Radio Research Laboratory Ministry of Information and Communication Designation of Testing laboratories.
ESTeem Training Class Antenna Fundamentals. Decibels (dB) Used for all mathematical calculations in the radio world. – dB is a logarithmic number dB =10.
Director, F-Squared Laboratories Maryland Ohio North Carolina
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
1 High-Speed Digital Test & Measurement Chris Allen Course website URL people.eecs.ku.edu/~callen/713/EECS713.htm.
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
EMC EMC of Power Converters Friday 9 May 2014
Transmission lines.
Cisco 1 - Networking Basics Perrine. J Page 19/3/2015 Chapter 3 Which of the following correctly describes the type of signal that the network media carries?
Electromagnetic Compatibility (EMC) and
1 Technical requirements on electrical goods for low voltage NV č. 17/2003 Sb. Dir. 2006/95/ES General requirements General requirements Goods or documentation.
Single Ended Measuring Modes of ELQ 30A To learn more click on the selected topic! ELEKTR NIKA Receiving Modes Impulse Noise Measurement Spectrum Analyzer.
Origin of Emission and Susceptibility in ICs
TELECOMMUNICATIONS Dr. Hugh Blanton ENTC 4307/ENTC 5307.
Electrostatics. Electric Charge and Electric Field.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Purpose This course discusses techniques for analyzing and eliminating noise in microcontroller (MCU) and microprocessor (MPU) based embedded systems.
Course Introduction Purpose
Measurements using a GTEM cell above 1GHz Dr Tian Hong LOH.
Design of a readout system for RPCs Olu Amoda2 The LODEN Group The group is an association of Fermilab scientists who teamed up to build a cosmic ray.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
KOPEX SCREENFORCE SYSTEMS. Applications: 1. Nuclear power plants and installations. 2. Military applications, naval frigate refurbishment. 3. Military.
© Copyright 2002 TEM Consulting, LP - All Rights Reserved Presentation To Portland & Seattle EMCS ChaptersRev – 04/25/02 - HSB Revision of ANSI C63.4 -
EMI EMC Introduction : Widespread use of electronic circuits for communication, computation, automation, and other purposes makes it necessary for diverse.
Definitions Electromagnetic Compatibility : (EMC) The capability of electrical and electronic systems, equipment, and devices to operate in their intended.
EMC Generals and Testing Technologies
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
TOPIC 1.2 INTRODUCTION TO NETWORKING. OBJECTIVES By the end of the topic, students should be able to: a) List the elements of data communication systems.
Amateur Radio Licensure Week 5: Advanced Electronics Seth Price, N3MRA New Mexico Institute of Mining and Technology February 28, 2016.
Dr.F. Arteche EMC DEPFET Project: A general overview.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
Electrical and RF Safety. Electrical Safety Generators Generators convert mechanical energy to electrical energy. They actually consist of two devices:
Chapter 9 CAPACITOR.
Chapter 9 Capacitors. Objectives Describe the basic structure and characteristics of a capacitor Discuss various types of capacitors Analyze series capacitors.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
The wireless charge will convert the RF signal at 900MHz frequencies into a DC signal,and then store the power into a mobile battery.
TEKLINX PAKISTAN Your Embedded Solution Partner. Industrial Instrument: Coupling Decoupling Network. Equipment for EFT/Surge measurements, together with.
Preamplifier R&D at University of Montreal for the drift chamber J.P. Martin, Paul Taras.
Piero Belforte, CSELT 1999: AEI_EMC_, EMC basics by Flavio Maggioni.
Single Ended Measuring Modes of ELQ 30A+
IEEE NPEC SC2 Equipment Qualification Electromagnetic Compatibility Compliance Type Test-Design Considerations- Installation and Mitigation Standard/Guidance.
NSG 4070 Signal generator and immunity test system Dr. Heinrich
Entrance to EMI.
INDUSTRIAL HYGIENE External EHS Expert Panel Workshop
Safety & EMC Standards & Block-Block Interface Definitions
Safety & EMC Standards & Block Requirements
What is EMC? EMC: Electromagnetic Compatibility
Chapter 9 Capacitors.
What is Radiated Emission Limits?
Presentation transcript:

Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Diethard E. C. Moehr, I&S CTF EMC

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 2 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Measurement procedure according to CISPR 16, Part 1 (VDE 0877 Part 1 and 2) Measurement procedure for conducted emission on power lines and on data and signal lines:  VDE 0877, Part 1 (CISPR ) Measurement procedure for radiated emission:  electrical field  VDE 0877, Part 2 (CISPR )

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 3 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Measuring Standards on EMC The measuring standards for emission are product related. This means that there are standards designated to special products or product groups. The measuring standards for immunity are phenomena related. This means that different immunity phenomena have to be tested independent of the product group. Emission Immunity

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 4 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Measuring equipment needed for emission measurements  LISNs  Screened Rooms  Measuring receivers with Average and CISPR detectors  Auxiliary measuring equipment Conducted emission10 kHz - 30 MHz Radiated emission30 MHz - 1 GHz  OATS with field attenuation according to CISPR 16 and VDE 0877, Part 2  Measuring receivers with Average and CISPR detectors  Auxiliary measuring equipment

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 5 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Measuring procedure for radiated emission Measuring distance: 10 meters No ambient noise OATS according to CISPR 16 and VDE 0877 Part 2 EUT emission maximum has to be recorded  360 ° turning of the turntable  Altitude variation of the receiving antenna meter  Horizontal & vertical polarization Install the EUT like in reality

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 6 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Measuring procedure for radiated emission OATSReceiving antennaEUT Measuring receiverTripod & antenna mastTurntable

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 7 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Measuring procedure for conducted emission - Part 1 1metal sheet 2 m x 2 m 2EUT 3bundled cable 4LISN 5shielded interconnection cable 6measuring receiver Bearthing point Mconnection to measuring receiver Pconnection EUT Measuring set up for an EUT supplied by public mains Measure in cm DIN VDE 0877, Part 1

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 8 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Measuring procedure for conducted emission - Part 2 1metal sheet 2 m x 2 m 2EUT 3power supply cable 4separate connection cable 5LISN 6touchable metal surface of the EUT Aconnection power supply Bconnection earthing point Pconnection EUT Hconnection artificial hand Mconnection measuring receiver Dmetal foils ground separate from power supply EUT with artificial hand Measure in cm DIN VDE 0877, Part 2

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 9 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Measuring procedure for conducted emission - Part 3 1metal sheet 2 m x 2 m 2EUT (Fax machine) 3power supply 4communication cable 5V- LISN 6 - LISN 7measuring receiver Bearthing point Mconnection to measuring receiver Pconnection EUT Measuring set up for an EUT with different supply cables Measure in cm DIN VDE 0877, Part 3

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 10 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Immunity phenomena  Rubbing or heating up of non conductive materials  Triboelectric effect ESD RFI  Radio & TV stations  Walkie talkies  Wireless communication  Mobile phones and others

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 11 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Immunity phenomena  All electrical switches  Contactors  Fluorescent lights and other gas discharge devices BURST SURGE  Lighting  Switching of large Loads COND. IMMUNITY  Coupling of sinusoidal disturbances into cables

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 12 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Measuring equipment needed for immunity tests BURST SURGE CONDUCTED IMMUNITY ESD RFI ESD Simulator Transmitting antennas, generators, power amplifiers, anechoic chambers, field sensors and other auxillary equipment BURST simulator and coupling clamps and devices SURGE simulator and coupling clamps and devices Generators, coupling / decoupling networks (CDNs) For all immunity tests it is at least recommended to use shielded rooms.

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 13 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Immunity test procedures Electrostatic discharge

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 14 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions The Triboelectric Effect Ü The reason for the discharge of static electricity is the Triboelectric Effect. Ü Non conductive material have the tendency to build up static electricity if they are rubbed against each other or if they are heated up. Air Artificial resin Glass Nylon Hair Silk Cotton Wood, Paper Amber Polyurethane Polyethylene Rubber PVC Silicon Teflon + -

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 15 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions The Triboelectric Effect-2

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 16 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Typical output current waveshape of a human body discharge

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 17 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Typical output current waveshape of the ESD simulator

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 18 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Test impulse as per the old IEC Test impulse as per IEC Test Waveforms in IEC Standards -- Time Waveforms

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 19 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Frequency spectrum as per IEC Frequency spectrum as per IEC Test Waveforms in IEC Standards -- Frequency Spectra

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 20 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Circuit diagram of the ESD simulator discharge switch discharge tip (vacuum relay)  10 pF 150 pF

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 21 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Measuring set up for verification of the ESD pulse (direct contact of the discharge tip) power supply Shielded room 50 R 2 R ESD-Simulator Earth cable Discharge Resistor Wall of the shielded room N-Connector 50 cm SUHNER RG 214 U -20dB BNC Connector BNC 50 R Tektronix Printer

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 22 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Immunity test procedures Immunity against radiated fields

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 23 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions wooden table 0,8 meters high power supply filter transmitting antenna feed throughs measuring instruments generator amplifiers feed throughs ferrite or filters for cable decoupling internal cable length < 1 meter anechoic chamber control room amplifier room floor absorbers area of uniform field Setup for radiated field testing

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 24 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Immunity test procedures Low energy fast transients

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 25 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Low energy fast transients Part 1  Power switches vacuum relays, contactors, relays and others  protective devices (fuses, gas discharges and others)  electrical motors with brushes like in vacuum cleaners, hair dryer and motors in industrial applications Sources of Noise Coupling mechanism Receptors  Power lines data lines signal lines communication lines  Electrical and electronic devices of any kind Principle of source  coupling  receptors applied to low energy fast transients (BURST).

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 26 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Low energy fast transients Part 2 Test levels for BURST testing

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 27 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Low energy fast transients Part 3 Principle of the BURST generator Gas Discharge UC S R S C D R M 50 Ohm coaxial output U voltage source charging resistor charging capacitance pulse forming resistor matching resistor decoupling capacitance C D R L C S R S R M

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 28 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Low energy fast transients Part 4 BURST impulse package Pulse repetition rate 5 kHz V O t/msec

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 29 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Low energy fast transients Part 5 Single BURST pulse 50 nsec +/- 30 % 5 nsec +/- 30 %

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 30 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Immunity test procedures High energy transients

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 31 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions SURGE testing Part 1 U high voltage source charging resistor charging capacitance pulse forming resistor matching resistor inductance to adjust the rise time of the pulse L r R C C C R S1 - S2 R m Circuit diagram of the generator (combination wave generator)

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 32 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions SURGE testing Part 2 Rise time:T = 1,67 x T = 1,2 µsec ± 30 % 1 Time of 50 % amplitude: T = 50 µsec ± 20 % 2 Pulse shape of open circuit voltage according to IEC

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 33 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions SURGE testing Part 3 Rise time:T = 1,25 x T = 8 µsec ± 20 % 1 Time of 50 % amplitude: T = 20 µsec ± 20 % 2 Pulse shape of the short circuit current according to IEC

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 34 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions SURGE testing Part 4 Rise time:T = 1,67 x T = 10 µsec ± 30 % 1 Time of 50 % amplitude: T = 700 µsec ± 20 % 2 Pulse shape of the open circuit voltage according to CCITT

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 35 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions SURGE testing Part 5 Coupling network for SURGE pulses for a. c. and d. c. mains

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 36 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions SURGE testing Part 6 Recommended test levels according to IEC

I:Moehr\Folien\B09-09_test_Argentina_03_Logo_03-07.PPT Folie 37 Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Common Technical Functions Comparison of ESD, BURST and SURGE tests

Industrial Solutions and Services Your Success is Our Goal Thank you very much for your attention. Contact: Diethard Moehr I&S CTF EMC Schuhstraße 60 D Erlangen Phone: +49 (9131) Mail: