GLAST LAT Project ISOC 5/17/2004 – Bill Craig1 ISOC Risk Analysis Process –Discussion with I&T personnel on risks –Internal discussion performed in concert.

Slides:



Advertisements
Similar presentations
GLAST LAT Project ISOC 5/17/2004 – Seth Digel1 ISOC Lessons Learned RFA09 Issue –No writeup on lessons learned from visits to other instrument/mission.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 71 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument Science.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Management 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting Management March 9th,
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-ISOC Subsystem1 RFA 1 – Management Plan, Documentation, Schedule  Specific Request – Part 1.
GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
Identify steps for understanding and solving the
2011 Project Prioritization Troy Anderson ERCOT Program Management Office April 2010.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
2006 CMBG Conference Sam Melton Supervisor, Configuration Management Brunswick Nuclear Plant Progress Energy June 11-14, 2006 Richmond, VA CM04 Facility.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 NRL-SLAC Networking LAT Environmental.
LAT HSK Data Handling from B33 Cleanroom. ISOC Software Architecture.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
Know More. Do More. Spend Less. Gloria Hejna Solution Architect Oracle Project Resource Management.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.
Proposal Processing Proposals, Staffing Profiles, Financial Summary Hewlett-Packard Project & Portfolio Management Project & Portfolio Management Slide.
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
GLAST LAT Project SLAC-NRL Data Connection for GLAST Environmental Test 3/15/05 1 GLAST Large Area Telescope: SLAC – NRL Data Connection for the GLAST.
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
GLAST LAT Project ISOC 1 ISOC Status Review June 3, 2004.
The OSG Stakeholders’ Request System Oct 9, 2012 Gabriele Garzoglio for the Project Office.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
M ANAGKEMENT COMPONENTS OF SOFTWARE QUALITY. M ANAGEMENT COMPONENTS OF SOFTWARE QUALITY The three basic SQA management tools offered here are: Project.
Camera PDR/CD1 Planning 19 September 2008
I&T&C Organization Chart
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
How to Successfully Implement an Agile Project
RFA 8 – Command & Control System Definition
GLAST Large Area Telescope
GLAST Large Area Telescope:
PCC Update 08/26/09 Planning Phase
GLAST Large Area Telescope
PCC Update 10/28/09 Planning Phase
PCC Update 09/23/09 Planning Phase
PCC Update 10/28/09 Planning Phase
Project Execution Activities
GLAST Large Area Telescope:
LAT Environmental Test Planning and Design Review
Introduction and Overview
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
Project Progress Summary - Week 18
SOFTWARE PROJECT MANAGEMENT KEY TOPICS
GLAST Large Area Telescope:
IT Managed Services Transition Weekly Activity Report: June 11th, 2019
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project ISOC 5/17/2004 – Bill Craig1 ISOC Risk Analysis Process –Discussion with I&T personnel on risks –Internal discussion performed in concert with RFA’s from peer review –Review and approval by ISOC stakeholders Followup –Entry into LAT risk management database by 06/01/04 –Weekly tracking, updating by ISOC management

GLAST LAT Project ISOC 5/17/2004 – Bill Craig2 RFA 3 – ISOC Risk Analysis NumberDateRankOriginatorDescriptionMitigation ISOC-00015/15/041B. CraigISOC lacks accepted architecture and plan for software implementation. Trade study between possible front ends to be completed by 6/15/04. Hires into s/w architecture position. ISOC-00025/15/043B. CraigNo response to PDR RFAs Schedule and track RFA’s weekly. ISOC-00035/17/042B. CraigInadequate staffing plan for ISOC. Draft staffing plan in progress, to be released by 06/01 First req issued an offer out to highest priority position. ISOC-00045/21/044B. CraigNo facility location identified for ISOC Long-term solution identified, short term space to be requested from SLAC management.

GLAST LAT Project ISOC 5/17/2004 – Bill Craig3 RFA 3 – ISOC Risk Analysis NumberDateRankOriginatorDescriptionMitigation ISOC-00055/21/042B. CraigNo requirements levied on I&T and Flt S/W subsystems Mechanism in place with I&T, pending with Flt S/W. Implement these only after architecture is defined and accepted. ISOC-00065/21/041B. CraigISOC will be unable to hold schedule due to staffing delays and unscoped work Definition of work plan follows architecture development. If needed additional support will be requested from LAT management.