CAMCube Interim Review 1 Sam Baker Tom Freestone Brian Madge Steve Pfau Brian Roberts Jennifer Uchida.

Slides:



Advertisements
Similar presentations
EMS1EP Lecture 3 Intro to Soldering Dr. Robert Ross.
Advertisements

1 Micro Electric Urban Vehicle Phase III Students: Nathan Golick Kevin Jaris Advisors: Mr. Gutschlag Dr. Anakwa.
Engineering Roles We will be forming groups of 3 students
Misconceptions Battery stores electricity Electricity from both ends of the battery Electricity is used up in a circuit Battery runs.
Group E Gyrobot Senior Design Project Mid-Term Presentation October 30, 2002.
Univ. of XXXXXXXXX 1 Things To Include: Team Photo Team Logo/Name.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Connecting VEX and ROBOTC
The Pied Pipers Alyssa Visitacion Ken Shum Joanne Flores.
Progress on Target Design Chris Booth Sheffield 14 th July 2004.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Team Impact Intelligent Helmet Impact System Preliminary Design Review January 29 th, 2008 Amanda Brodbeck Wei-Chu Liao Wei-Shen Liao Chris Mintle.
Proposal Presentation Micromouse Spring 08 8” Comb.
CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.
Justin Harger | Adi Kapoor | John Kolodick | Captain Morgan Rebels.
3-6. Conductors in Static Electric Field
Team Engine Control Jon Stoker Brian Patterson Avishesh Dhakal 1.
Team HazardHawk Team HazardHawk Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.
Preliminary Design Review Micromouse Spring 08 8” Comb.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Codey Lozier Christian Thompson Advisor: Dr. Mohammad Saadeh
Magnetism and Electric Motors Jim Neathery, University of Kentucky, Center for Applied Energy Research 2540 Research.
Russ Hersberger Motor Math for SUMO Robots. Russ Hersberger Traction Force He who has the most friction wins Two things determine the force of friction.
Team 1.1. Networked orientation sensor (optical) Sponsor: Freescale
Motor Vehicle Level 3 Electronics and Electronic Components Resource 1.
1 DIABLO De-rotated Imager of the Aurora Borealis in Low-Earth Orbit Interim Review 1 Nicole Demandante Laura Fisher Jason Gabbert Lisa Hewitt Lang Kenney.
Automated Bridge Scour Inspection FSU/FAMU College of Engineering Team 7 Proposal 10/27/2010.
Project Status Report Presenter Name Presentation Date.
ZUBAIR AHMED. AGENDA Electricity Energy Sources Static Electricity Electric charge moves Magnets and Electricity Battery produces electricity Electricity.
Microbial Detection Arrays Interim Review I February 6 th, 2007 Aerospace Senior Projects University of Colorado – Boulder Advisors: Dr. Forbes and Dr.
Perry Lapper Progress. Frame With Actuators Outside Frame.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
AAE450 Spring 2009 Support structure for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
Overview Project Schedule Competition Technology Report Construction Progress Future Work Conclusion.
ECE 477 Final Presentation Team 21 - Spring 2013 Team Members: Duncan Swartz, Jacqueline Greer, Tom Pansino, Mark Tubergen.
1 Existing Product Analysis Controls The buttons are very big, easy for a child to press because of the large surface area Clearly spaced out from each.
What do I have to do? Cause a motor to turn the center arm. attach motor to frame can redesign the center arm piece as needed use bushings or bearings.
Final Presentation Micromouse Spring 08 8” Comb.
Group 18: Alejandro Castro Sam Leuthold Andrew Borger 1 GE Sponsor: Todd Hopwood Faculty Advisor: Dr. Van Sciver.
MEP (Martian Environmental Pod) 3/15/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review #2.
BATTERY PERFORMANCE METER FOR ELECTRIC PROPULSION SYSTEMS Team Members: Ryan Bickham, Dennis Blosser Cody Dinkins, Todd Dutton, Rachel Shively February.
Group Members Richard George – Industrial Technology Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Client.
Scrumm meeting. Mechanical Done. Tire vs belt? Tire chosen. What to do? Do a prototype of a car. Continue with design.
Positioning Sensor for Electric Motor Drive ENGR 498 Senior Design College of Optical Sciences Industrial Affiliates.
Bicycle Instrumentation Hardware Steven Brendel Joe Rinek Eric Chan.
ECE 445 Group 20 4/23/2012 Kevin Dluzen Jonathan Hall Diyang Qiu.
RamRack Conceptual Design Review Colorado State University Zach Glueckert Christopher Reed Timothy Schneider Brendan Sheridan Christina Watanuki Advisor:
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Vector projections (resolutes)
LVDT Linear Variable Displacement Transducers/Transformers
Electricity How & where it’s used Review of the atom
Gauss’s Law ENROLL NO Basic Concepts Electric Flux
Power Steering Test Stand
installing electrical system
Illini Hyperloop Pod Overview
SVY207: Lecture 16 GPS Field Procedures and Computations
Diamond Diamond has a very, very high melting point (about 4000°C)
How to Pick Perfect Foldable Light Weight Ebicycle | Topmate
HI !.
Power Steering Test Stand
Conflict Resolution And Peer Mediation In A CL Classroom
الفعل ورد الفعل ♠ ♠ ♠ مجلس أبوظبي للتعليم منطقة العين التعليمية
SAE Clean Snowmobile Challenge Presentation
Applications of Integration
Presentation transcript:

CAMCube Interim Review 1 Sam Baker Tom Freestone Brian Madge Steve Pfau Brian Roberts Jennifer Uchida

Overview  Resolved Issues  Reaction Wheel  Software  Electrical Schematics  Design Summary  Current Issues  Battery  Rate Gyro  Reaction Wheel Design  Schedule Progress  Budget Progress

Resolved Issues  Issue:  Reaction wheel size/material questionable  No electronics schematics  Resolution:  Reaction Wheel will be made out of brass  Schematics made

Resolved Issues  Issue:  Concern about software  Resolution:  Wrote and tested software with LabView

Design Summary  Changes:

Current Issues  Batteries  Ordering process taking longer than expected  Possible free battery/charger from Eagle Pitcher  Rate Gyro Noise  Static tests

Rate Gyro Static Test 1

Rate Gyro Static Test 2

Current Issues  Reaction Wheel  Issue: Press fit onto motor shaft  Resolution: Slip fit  Hi Sol 9460 Epoxy “Rhino Snot”  Issue: Reaction wheel volume problems (multi-axis integration)  Resolution: Hallowed out shell  Resolution: Having the motors mounted in the center rather then the sides

Budget Progress

Conclusion  Resolved Issues  Reaction Wheel  Software  Electrical Schematics  Design Summary  Current Issues  Battery  Rate Gyro  Reaction Wheel Design  Schedule Progress  Budget Progress

Questions