P.N. Burrows ATF2 Project Meeting, KEK, 18/12/061 Philip Burrows John Adams Institute Oxford University LCABD 2007-10 ATF / ATF2 ESA Miscellaneous FONT.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Philip Burrows CLIC MDI Meeting 6/11/091 Design issues for IP intra-train feedback Philip Burrows John Adams Institute Oxford University.
Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 December 2003 run results Philip Burrows.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
P.N. Burrows GDE/MDI Vancouver 19/7/06 (T-488) Philip Burrows John Adams Institute Oxford University EM Background Tests of Feedback BPM.
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/081 Beam-based feedback for LC ILC luminosity goal 10**34 / cm**2 / s 3000 or 6000 bunches, spacing ns.
EM background tests of IP feedback hardware Christine Clarke Oxford University 24 th September 2007 Oxford (P. Burrows, C. Perry, G. Christian, T. Hartin,
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
Philip Burrows LCUK Meeting, Oxford 29/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 run results Dec 03/Jan 04 Philip Burrows Queen Mary, University.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Philip Burrows ECFA LC Workshop, Warsaw, 10 June Philip Burrows John Adams Institute Oxford University G. Christian, C. Clarke, B. Constance, H.
WP9 : Cavity BPM spectrometry Royal Holloway S. Boogert & G. Boorman University College London D. Attree, A. Lyapin, B. Maiheu & M. Wing Cambridge University.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
Special Lecture- ATF The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK ILC School at KEK History and Machine.
P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
Philip Burrows 2 nd Nano Workshop, KEK 11/12/04 Plans for FONT3 and Future Feedback Experiments Philip Burrows Queen Mary, University of London ILC system.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Simulation of feedback BPM signals in an intense background environment A Hartin, P Burrows, G Christian, C Clarke, B Constance, H Khah, C Perry, C Swinson.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Talitha Bromwich, Glenn Christian, Colin Perry, Rebecca Ramjiawan John Adams Institute,
Philip Burrows X-band 2010 Daresbury 2/12/101 Advanced beam feedback systems Philip Burrows John Adams Institute Oxford University.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Dither Luminosity feedback versus Fast IP feedback
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Transverse Beam Jitter Propagation in Multi-bunch Operation at ATF2
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
Presentation transcript:

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/061 Philip Burrows John Adams Institute Oxford University LCABD ATF / ATF2 ESA Miscellaneous FONT Planning Issues

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/062 LC-ABD1 Structure PPARC OSC G. Blair (Principal Investigator) P. Burrows (Project Manager) WP2 G. Blair WP1 D. Angal Kalinin Task 1.1 D. Angal Kalinin Task 5.1 J. Clarke Advisory Comm. WP3 A. Reichold WP4 P. Burrows WP5 M. Poole Task 1.2 J.Jones/G.White Task 4.1 P. Burrows Task 2.1 G. Blair Task 2.2 G.Doucas/A.Gillespie Task 2.3 I.Bailey Task 4.2 S. Boogert Task 5.2 A. Dexter Task 5.3 N. Watson Task 3.1 A. Reichold Task 5.4 R.Appleby, C.Densham

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/063 LC-ABD2 Structure PPARC OSC Principal Investigator: Blair Project Manager: Burrows Project Coordinator: TBD Industry Liaison: TBD WP1 Clarke Tasks Advisory Comm. WP2 Wolski WP3 Jones WP4 Angal Kalinin WP5 McIntosh WP6 Reichold WP7 Burrows WP8 Blair WP9 Boogert WP10 Densham GDE Tasks

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/064 FONT ‘new’ resources Beam FB New Staff (inc ind. + est.)1066 Equipment80 Consumables191 Travel236 Total New1573

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/065 People Oxford + Daresbury: Philip Burrows Glenn Christian Hamid Dabiri Khah Tony Hartin Alexander Kalinin Javier Resta Lopez Colin Perry Graduate students: Christine Clarke (3) Christina Swinson (2) Ben Constance (1) Robert Apsimon (0)

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/066 WP7: Main Goals 1) Prototype ILC intra-train beam feedback system + contribute engineered design to EDR 2) Study of EM backgrounds and optimisation of IP FB system design against them 3) Design + simulation of integrated global alignment, FB + luminosity tuning strategy for EDR

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/067 WP7: Main Goals 1) Prototype ILC intra-train beam feedback system + contribute engineered design to EDR VERY HIGH 2) Study of EM backgrounds and optimisation of IP FB system design against themHIGH/MODERATE 3) Design + simulation of integrated global alignment, FB + luminosity tuning strategy for EDR MODERATE – ‘ESSENTIAL’

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/068 RDR completed Next phase – EDR – being planned by GDE now - Likely to be a BDS ‘work package’ dominated by SLAC + UK Aim for EDR completion in hope for green light from (US) Govt. so project can start Details will be announced at LCWS Hamburg June 07 The GDE R&D board was asked by PPARC to comment on LCABD proposal – GDE aims to exert tighter control on national R&D spending We will not be allowed to work on things that are not directly ILC relevant, and agreed by GDE! ILC status

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/069 Until mid 2008 (?): ATF continues as now Late 2008? Reconfigure ATF and connect to ATF2 Early 2009?: ATF2 commissioning ATF2 goals: 1)Achieve 35nm spot at ATF2 FF (2009??) 2)Stabilise spot to nm level (2010??) Comments: This schedule already slipped by 1 year; Yen tight in Japan Took FFTB several years to achieve 70nm spots … ATF/ATF2 schedule + goals

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/ or 3 bunches with 300 or 150ns spacing until late 2008 Fast kicker development work will proceed in parallel with ATF/ATF2 – completely uncorrelated with ATF2 goals -IMHO the fast extraction kicker could take longer to develop By 2009?? or 2010?? might get bunches w. 300ns spacing ATF/ATF2 bunch structure

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/0611 Goal 1: Micron-level beam stability needed at ATF2 FF entrance Goal 2: Sub-micron stability needed -> won’t get either w/o (intra-train) beam FB + FF (depends on bunch-bunch jitter: this is unlikely to be better with the fast kicker extraction from DR!) Also for goal 2: they imagine IP FB using Honda IPBPM w. nm resolution (nice, but not directly relevant for ILC FB!) FONT at ATF/ATF2

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/ /8: get FONT4 working properly (gain, delay-loop …) - operational improvements design upstream FONT system for ATF2: what resolution to aim for? 1 micron – striplines vs. sub-micron cavities? beamline layout angle also? x also? feed-forward? 2009: Commission ATF2 FONT system for goal 1/2 2010: bunches at 300ns? IP FB w nm BPM? add ‘luminosity’ signal input for fast scanning? Default ATF/ATF2 plan

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/0613 Schematic ATF2 feedback layout: 1 KickerBPM e- BPM Kicker x’y’xy

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/0614 Schematic ATF2 feedback layout: 2 combined x-y kickers KickerBPM e- BPM Kicker x’y’xy

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/0615 Schematic ATF2 feedforward layout: 1 KickerBPM e- BPM Kicker Damping Ring x’y’xy yx x’

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/0616 Schematic ATF2 feedforward layout: 2 combined x-y kickers KickerBPM e- BPM Kicker x’y’xy Damping Ring yx y’x’

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/0617 FONT bench test system Manufacture synchronised ILC bunch-train, clocks, and trigger Develop algorithms and program FPGA Close loop (Include amplifier and dummy kicker also!) Trigger Bunch 2.16 MHzDiagnostic

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/0618 Only guaranteed next run is July 2007 Fighting for runs in 2008 – uphill battle - probably get some beamtime - long-term ESA looks dodgy Longer term: default to use SABER and/or LCLS beam -> ESA Need to decide: what to do in July 2007 run? any further requirements for beam for EM studies? End Station A

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/0619 Apart from Tony’s EM simulations these have been on the back-burner since Glen left Need to get plugged in to ILC LET studies for EDR - continue/improve intra-train FB simulations - integrate intra-train and 5Hz feedbacks - integrate BDS feedbacks - understand relationship with upstream FBs and FFs - global FB, tuning strategy, alignment … Beam simulations

P.N. Burrows ATF2 Project Meeting, KEK, 18/12/0620 FONT www site! needs updating generally meetings pages/archive repository for PAC/EPAC papers Journal publications! Miscellaneous