LIGO-G000207-00-W LIGO II IO/PSL Optical Table Layouts Rick Savage and David Ottaway LIGO Science Collaboration Meeting Hanford, August 15-17, 2000.

Slides:



Advertisements
Similar presentations
LIGO - G R 1 HAM SAS Test Plan at LASTI David Ottaway November 2005 LIGO-G Z.
Advertisements

LEReC Laser Controls & RF Requirements Brian Sheehy 10/31/13 Laser timing Laser design RF and Control Needs.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
E2E school at LLO1  Han2k »Model of the LHO 2k IFO »Designed for lock acquisition study  SimLIGO1 »Model of all LIGO 1 IFOs »Designed for –noise hunting.
LIGO-G9900XX-00-M LIGO Status and Plans Barry Barish 5 June 2000 Gravitational Waves: A Challenge to Theoretical Astrophysics Trieste, 5-9 June 2000.
Status of the LIGO Project
LIGO-G W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref.
LIGO-G W Performance of the LIGO I PSL at the LIGO Hanford Observatory Rick Savage LIGO Hanford Observatory Laser Zentrum Hannover November 15,2000.
LIGO-G W LIGO II Pre-stabilized Laser System Design Requirements and Conceptual Design David Ottaway, Todd Rutherford, Rick Savage, Peter Veitch,
LIGO-G W Report on LIGO Science Run S4 Fred Raab On behalf of LIGO Scientific Collaboration.
Performance of the LIGO Pre-stabilized Laser System Rick Savage LIGO Hanford Observatory Ninth Marcel Grossmann Meeting on General Relativity Rome 2000.
Measurement of the laser beam profile at PSL to Mode Cleaner interface for the 40 Meter Prototype Interferometer A table of contents 1. Introduction 1.1.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
LIGO-G W 2005 CLEO/QELS Joint Symposium on Gravitational Wave Detection 1 High-Power Stabilized Lasers and Optics of GW Detectors Rick Savage.
LIGO-G9900XX-00-M LIGO Status and Plans Barry Barish March 13, 2000.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G v5 1 Pre-stabilized Laser System (PSL) Technical Status NSF Review of Advanced LIGO Project Benno Willke, AEI Hannover and the AdvLIGO PSL.
Design of Stable Power-Recycling Cavities University of Florida 10/05/2005 Volker Quetschke, Guido Mueller.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
LIGO-G Advanced LIGO Detector upgrade is planned for »Factor of 10 increase in distance probed (‘reach’) »Factor of 1000 increase in event.
Optical Gyroscopes for Ground Tilt Sensing in Advanced LIGO The need for low frequency tilt sensing The optics in Advanced LIGO’s suspensions must be very.
Current status of Laser development 2nd Korea - Japan Workshop on KAGRA 2012/5/28(Mon)
LIGO- G R Telecon on June, Mach-Zender interferometer to eliminate sidebands of sidebands for Advanced LIGO Osamu Miyakawa, Caltech.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
G Z LIGO R&D1 Input Optics Definition, Function The input optics (IO) conditions light from the pre- stabilized laser (PSL) for injection into.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
Pre-stabilized laser (PSL) for AdV Scope of the system Main tasks Requirements Reference solution and status of the design Plans towards completion Technical.
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008 LIGO G Z Benno Willke for the PSL team.
1 Intensity Stabilization in Advanced LIGO David Ottaway (Jamie Rollins Viewgraphs) Massachusetts Institute of Technology March, 2004 LSC Livingston Meeting.
LIGO-G0200XX-00-M LIGO Scientific Collaboration1 eLIGO Input Optics Characterization and Performance Kate Dooley University of Florida.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
Detector calibration R&D - 1 Elastic deformation of test masses »R. Savage with Pablo Daveloza (LIGO fellowship) and Mario Diaz – UTB and Mahmuda Afrin.
LIGO-G M LIGO R&D1 Initial LIGO upgrade to 30 W: Implication for the Input Optics UFLIGO Group.
Studies of Thermal Loading in Pre-Modecleaners for Advanced LIGO Amber Bullington Stanford University LSC/Virgo March 2007 Meeting Optics Working Group.
Cascina, Nov. 4 th, 2008 AdV review 1 AdV Injection system E. Genin European Gravitational Observatory.
LIGO Scientific Collaboration Lasers and Optics Working Group 6 Month Report to the LSC - August 15, 2000 Outline Highlights Meeting Agenda LIGO-G D.
LIGO-G W Interferometer and modecleaner transients during the E2 run Rauha Rahkola and Ray Frey University of Oregon Rick Savage LIGO Hanford.
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
Laser Adaptive Optics for Advanced LIGO
LIGO-G W Status of the LHO PSLs Rick Savage LIGO Hanford Observatory LIGO Scientific Collaboration Meeting August 13-16, 2001.
1 M. Granata, M. Barsuglia, C. Buy, R. Ward – GWADW 2010, Kyoto.
Single-frequency fiber amplifier development for next- generation GWDs
NSF Annual Review of the LIGO Laboratory
bKAGRA PSL Design Study
The Proposed Holographic Noise Experiment
Status of PLL system of ALS
Commissioning Progress and Plans
Yoichi Aso on behalf of the LCGT ISC Group
J. Kovalik, LIGO Livingston Observatory
Design of Stable Power-Recycling Cavities
Commissioning the LIGO detectors
Interferometer Design for bKAGRA Phase 1 and Beyond
Status of LIGO Installation and Commissioning
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
bKAGRA PSL EOM Layout ~180W ? to IMC Laser EOM (fPMC, PM) PMC EOM
Interferometer Design for bKAGRA Phase 1 and Beyond
Improving LIGO’s stability and sensitivity: commissioning examples
PSL optical layout changes for eLigo
HAM SAS Test Plan at LASTI
Squeezed Light Techniques for Gravitational Wave Detection
Interferometer Design for bKAGRA Phase 1 and Beyond
Intensity Stabilization Servo Plan
Interferometer Design for bKAGRA Phase 1
Bunker Internal Review Welcome & Charge
Intensity Stabilization Servo Plan
Presentation transcript:

LIGO-G W LIGO II IO/PSL Optical Table Layouts Rick Savage and David Ottaway LIGO Science Collaboration Meeting Hanford, August 15-17, 2000

LIGO-G W IO/PSL Optical Table Layouts2 Goals Coordinate and optimize the integrated IO and PSL layouts before designs are “frozen” Reduce complexity of IO/PSL optical table layout –Minimize the number of mirror mounts –Make optical paths as short as possible Simplify the optical interface between the IO and PSL subsystems –Reduce the number of optical components required to satisfy interface requirements –Provide a stable interface that minimizes coupling of PSL beam changes to IO system

LIGO-G W IO/PSL Optical Table Layouts3 LIGO I PSL Optical Layout

LIGO-G W IO/PSL Optical Table Layouts4 Strategy … Position major optical components such that optical path is simplified and length is minimized Minimize number of mirror mounts »Two adjustable mounts for alignment into optical cavities –Pre-modecleaner –Reference Cavity »One or two adjustable mounts to align into IO optical train »One adjustable mount to align into PSL frequency shifter AOM »One adjustable mount for retroreflection through AOM »Two PZT-controlled mounts for alignment into modecleaner –Both on the IO periscope to simplify laout »Fixed mounts where only “folding space” is required »Fixed mounts in all periscopes

LIGO-G W IO/PSL Optical Table Layouts5 … Strategy »All EOMs on adjustable mounts »All lenses positioned then locked in place IO/PSL Optical Interface »Midpoint between flat mirrors in pre-modecleaner –Provides a stable, fixed location for interface –Isolates changes in PSL beam changes from IO –Leaves all modematching downstream of the PMC in the scope of the IO system

LIGO-G W IO/PSL Optical Table Layouts6 Possible Optimized Layout