Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!

Slides:



Advertisements
Similar presentations
Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
Advertisements

ESLS 04 Daresbury Laboratory
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
EMMA RF System Summary RF Requirements (S Berg): Aperture: –Aperture 34.7 mm (min) –Dispersion effects may increase by 3 – 4 mm Frequency: –Frequency range.
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
RF Cavity / Coupling Coil Module
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
SPL waveguide distribution system Components, configurations, potential problems D. Valuch, E. Ciapala, O. Brunner CERN AB/RF SPL collaboration meeting.
RF Review CM37 Andrew Moss. Amplifier results at Daresbury 2MW at 35kV, good efficiency and gain.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
650 MHz Solid State RF Power development at RRCAT
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
21 st to 25th September 2009 EMMA RF Systems At Daresbury Laboratory C Beard OVERVIEW OF THE EMMA RF SYSTEM Carl Beard ASTeC, STFC Daresbury Laboratory.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
MICE RF System Power Supplies, Control and Monitoring Status report
Thales Klystrons for Linacs
Second SPL Collaboration Meeting, Vancouver May 2009
Chris Adolphsen Sergei Nagaitsev
12 GHz High Power RF components requirements for CEA activities
RF Status 1 4 High Power Amplifier circuits available CERN(2)
CEPC RF Power Sources System
Presentation transcript:

Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!

Paul Drumm 30 Mar 2004 RF Baseline Design RF Power Design driven by cost issues (no funds for a new system) –Optimal – one amplifier per cavity 2 Amplifiers from LBNL = 4 MW total 1 or 2 Amplifiers from CERN = 4 MW total –If 1 amplifier – needs a bigger drive? Spare TH116 Tubes from ISIS Split or more amplifiers? –Circulator – cavity ↔ amplifier isolation –Hybrid device - possibly cheaper – some coupling? –Assume that we do R&D (trials) when we have the equipment Need both cavities and one amplifier circuit Test out a hybrid circuit driving two cavities

Paul Drumm 30 Mar 2004 Progress since October CM December LBNL –Discussed shipping equipment to RAL –Two 2 MW power amplifier circuits –Three (300kW) driver circuits –4616 test stand –LBNL loan – to be written off (eventually) –MoU to be signed

Paul Drumm 30 Mar 2004 … December At LBNL –Stripping down for transport –Cleaning –Packing –Shipping…

Paul Drumm 30 Mar 2004 LBNL Power Amps

Paul Drumm 30 Mar kW Driver Amplifier

Paul Drumm 30 Mar Test box

Paul Drumm 30 Mar 2004 Staff… Roy Church –Used up quota of days –No Roy till April RF group at the Daresbury SRS –Mike Dykes (group leader) –Andy Moss (senior RF Engineer) –plus two more –MD & AM are here… ASTeC

Paul Drumm 30 Mar 2004 Plan for Early 2004 Limited funds –Berkeley RF system to DL –Strip down and make a technical assessment of the equipment Cost to refurbish Confirm equipment is serviceable –6 month overlap with Roy Review RF design in the light of CERN RF proposal

Paul Drumm 30 Mar 2004 For Late FY 2004 Setting up a test-stand at DL –Hall and facilities available –Need to have got through GW2 i.e. be in full funding mode

Paul Drumm 30 Mar 2004 RF Power Systems 8 MW of RF 1Hz and 1 ms Expensive to buy new MHZ common to old linacs –LBNL, CERN, ISIS, KEK, Los Alamos 4 MW from LBNL (2x2MW) + ISIS valves 4 MW from CERN + new valve ? How to transmit the power ? –Cheaper, hybrid –Expensive, low risk

Paul Drumm 30 Mar 2004 Split – Circulator - RF Scheme R.F.LEVEL R.F. LEVEL SUM CIRCULATOR PHASE SHIFTER R.F. SOURCE33kV H.T. 18kV H.T. TUNE ERROR CAVITY PHASE PHASE DET TH MW kW SOLID STATE DRIVER R.F. LEVEL AND PHASE CONTROL CAVITY PHASE F R 70db COUPLER MATCHED POWER SPLITTER CAVITY LOAD

Paul Drumm 30 Mar 2004 Baseline ? 4 MW Transmitter 2 MW Transmitter Master Oscillator 201 MHz Cavity Module 3 db Hybrid & Load Matched Splitter Circulator & Load

Paul Drumm 30 Mar 2004 ISIS Linac - RF System

Paul Drumm 30 Mar 2004 TH116 Thales 5 MW tube –ISIS uses 1 or 2 tubes per year –Few customers for this tube –Thales: success in small numbers not good looking at large orders tubes –Alternative tubes (?) 2 MW – splitting…

Paul Drumm 30 Mar 2004 X-Ray Shielding – Conditioning/Running Control Rooms