Status of DCS for TDAQ racks Y. Ermoline et al. ATLAS TDAQ Week, CERN, 27 April 2005.

Slides:



Advertisements
Similar presentations
IT Essentials: PC Hardware and Software 1 Chapter 3 Assembling a Computer.
Advertisements

LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
The Detector Control System for the ATLAS SemiConductor Tracker
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct Hardware Status and Plans of the Embedded Local Monitor Board Hardware Status.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
S.Sergeev, JINR, Dubna. This is just an example of what could be done Could be extended to needs of any NA62 sub- detector requiring a lot of analog measurements.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Susanne Kersten, Wuppertal University November 21/22, 2013.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
ATLAS ATLAS DCS H.J.Burckhart, Muon Electronics Meeting, December 11th Status of Embedded Local Monitor Board (ELMB) Overview Radiation tolerance.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
CaRIBOu Hardware Design and Status
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Status of NA62 straw electronics Webs Covers Services Readout.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
ATLAS HLT and DAQ physical layout
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
22/03/11FV 1 NA62 DCS CAN bus lines. Short reminder General properties of CAN bus o Up to 64 nodes on one bus o Different devices need different buses.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
Location of SVD Temperature and Humidity Monitors L.Vitale & L.Lanceri INFN & Univ. Trieste 6 th VXD Workshop, 02/10/2014 SVD parallel for discussion Sep.
Monitoring hardware for SVD (VXD) L.Lanceri, L.Vitale /INFN Trieste VXD Workshop, 01/10/2014 Slow Controls discussion session 1 1.Radiation & beam abort.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Mauro Citterio - Mi meeting
ECAL Front-end development
DCS: Temperature Probes
DCS: Temperature Probes
Christian Veelken last updated 11/09/06
Mini-drawers, FE-ASIC , Integrator
What’s in the Box?.
How to build a computer.
Presentation transcript:

Status of DCS for TDAQ racks Y. Ermoline et al. ATLAS TDAQ Week, CERN, 27 April 2005

1/8 nWhat will be monitored by DCS inside the racks: n Air temperature ð3 air temperature sensors (NTC 10k), each sensor requires 1 ADC channel and permit measurements from 5°C to >100°C n Relative humidity ð1 humidity sensor (HIH 3610) to monitor the dew point inside the rack, requires 1 ADC channel n Inlet water temperature ð1 temperature sensors (NTC 10k) located on the inlet cooling water pipe, requires 1 ADC channel n Cooler’s fan operation ð3 fan rotation Hall sensors from CIAT (binary and pulse output version available), each sensor requires either 1 bit of digital input port or 1 ADC nIn total - 8 ADC channels per rack n The ADC channel may be also used to readout a binary signal n 64 ADC channels per ELMB – 4 connectors of 16 ADC channels TDAQ racks monitoring by DCS

2/8 Sensors location and connection to ELMB nSensors location on the rear door of TDAQ rack n Temperature, Rotation, Humidity n All sensor signals and power lines are routed to a connector on the read door to simplify assembly nFlat cable connects these signals to 1 of 4 ELMB motherboard connectors n 3 connectors receive signals from 3 racks n 1 spare connector for upgrades n1 ELMB may be used for 3 racks Left rack Right rack Middle rack

3/8 Test setup and SDX1 installation nForeseen SDX1 installation n DCS PC running PVSS - rack mounted, 4U, 3 PCI slots (minimum) ðKvaser PCIcan-Q (4 ports) card(s) – CANbus branches & PSU ELMB n 6U PSU crate ordered for SDX1 ðWith 3 power modules for up to 6 CANbus branches ðOnly 1 module for Pre-Series n CANbus cable provisionally selected – SCEM (3 pairs) ðConductor – 0.5 mm 2 (20 AWG), OD – 10 mm, linear resistance – 37.5 Ω/km ðMaximum voltage drop: 2.0 V for 20 ELMBs on 50m cable (acceptable) ð90 Ω impedance – tested with 100 m cable ðStill looking for 120 Ω cable: Belden 3108A (3 pairs) – expencive (7.20 CHF/m) Elettronica Conduttori MMCNTH/452EC-2 (4 pairs) – used by TileCal n 2 ELMBs in 6 Pre-Series racks on DIN rail – SCEM: ðOn the rear door or rear of the rack ðSingle CANbus connector – need a daisy-chain implementation

4/8 ELMB CANbus daisy-chain implementation nPermanent installation with “thin” CANbus cable nModified Phoenix SUBCON-PLUS-CAN connector Cable tray CANbus cables To next rack Socket (38 €) Cable fixation To PSU

5/8 CANbus cables layout in SDX1 nRacks: n Level 1: racks n Level 2: racks nCANbus cables: n 1 CANbus branch per row n ~200 m of CANbus cable n1 ELMB per 3 racks: n 32 ELMBs on 6 branches ðMax cable length ~25 m nFor comparison - 1 ELMB per rack: n 92 ELMBs on 6 branches ð30% cost increase Pre-Series racks

6/8 Component and system cost (1 ELMB / 3 racks)

7/8 Component and system cost (1 ELMB / rack)

8/8 Further steps nDCS PC, PSU and ELMB installation in SDX1 Pre-Series racks n Temporary solutions until final component delivery ðPower supply, daisy-chain connector nChoice of sensors and wires n Temperature ðOffer for the NTC with 6m halogen free cable: 29 CHF/pc (100 pieces) n Humidity - TBD nELMB adapters design for humidity and rotation sensors n Humidity sensors need power nMechanical arrangement of sensors in the rack n Sensor’s fixation, connection to the ELMB