Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.

Slides:



Advertisements
Similar presentations
Packaged Terminal Air Conditioners
Advertisements

Trane Voyager™ rooftop units
Fan Coil Unit Product Line-up. FCU Home Application Show.
General System Maintenance BUS 4 COMPONENT FLOW.PPT
 Nov 4 - regular class  Electrical text  Openings text  Nov 6 – no class  Nov 11 – no class – Veteran’s Day  Be sure to hug a Veteran (women only)
Basic Refrigeration Cycle
F our P oints E ngineering and D esign Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Heat Recovery for Commercial Buildings
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
ASHRAE Chapter Meeting Acoustics in HVAC Design
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
Engineer Presentation
 A 'heat exchanger' may be defined as an equipment which transfers the energy from a hot fluid to a cold fluid. Here, the process of heating or cooling.
Energy Recovery System Hadi Fattah Chris Korkuch Scott Lacey Ryan Neary Colin O’Neill.
1 Composite Generator Enclosure PROJECT New Castle Design Associates.
1 Composite Generator Enclosure PROJECT New Castle Design Associates.
1 Composite Generator Enclosure PROJECT New Castle Design Associates.
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Nuclear Cookies Client: Idaho National Lab Project: Salt Removal.
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Team 10 ME Project: Air Conditioner Lab Members Customer Advisor Sean M. Gallagher, Brian Davison U of D ME Department Dr. Keefe Prathana Vannarath, Pam.
BAE SYSTEMS DESIGN PROJECT: DAYLIGHTING TECHNIQUES/ AFTERNOON DE-”LIGHT” EDSGN 100 Sec. 6 Team 3: David Young, Robert Vadella, Victoria Rodriguez, Phil.
COMMERCIAL REFRIGERATION
Sean Kalman – Hays Fluid Controls
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
AIR CONDITIONING (COOLING)
TEAM: JEFF PHILIPPART, TEAM MEMBER NAMES REMOVED WHIRLPOOL CAPSTONE STEAM GENERATION PROJECT.
Submitted by Waris jamal Praveen kumar gautam Shiv pratap singh Ramashwar kumar singh Under the guidence of Prof.safiulla khan.
Solar Heat Collector Charbel Saghira Alejandro Forero Victor Berrueta Faculty Advisor: Dr. Andres Tremante Florida International University Department.
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
Water piping design.
Solar Energy Systems in the Eco-Village at the University of Manitoba
Development of Weir-Wall Contour-Matching PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington April 2015.
SOLAR THERMAL AIR CONDITIONER Design Team 8. Introduction Solar Air Conditioner Introduction Design Testing Conclusion 5 April 2012 Team 8 Slide 2 of.
Presented By Dillon Savage & Crystal Green UNIVERSITY OF IDAHO TWO-STROKE WITH DIRECT INJECTION AND SOUND REDUCTION.
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
Chapter 11: Space Air Diffusion Conditioned air is normally supplied to air outlets at velocities much higher than would be acceptable in the occupied.
Precision AirConvey Internal Duct Cleaning System December 10, 2007 Sean Darras Nick Rakov Katie Sear Lindsay Martz.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
The Family of Shell and Tube Heat Exchangers P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Family members with Simple Geometrical.
Product Presentation 2007 SKY AIR Launch of new Non-Inverter + Duct (R22) series.
Drafts and Duct System Sizing
Alex Gee Jon Locke Joe Cooper Kylie Rhoades Clara Echavarria Ice Energy Extraction.
ACOUSTICS REAL-WORLD HVAC ACOUSTICS BRD Noise and Vibration Control, Inc A presentation by Steffan Kollevoll of BRD Noise and Vibration Control, Inc.
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
Presented By: Aaron Goodwin Mike Pyrkosz April 15, 2004 Aquarium Wave Generator Project # A Design Review.
3/16/2016 Vanderbilt Motorsports Intake and Exhaust Project 1 Vanderbilt Motorsports Intake/Exhaust Team January 17, 2008 Presentation Kristina Kitko Mark.
Kaeser Rotary Screw Vacuum Packages
NCSX Day 1 ECC (Extra Cheap Cryostat) Cryostat Configuration Status Report – September 30, 2006.
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
Sigma Rotary Screw Compressors
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
 2008 Kaeser Compressors, Inc., USA (V4.1) SFC Product Introduction “Specifications are subject to change without notice” 1 SFC Sigma Frequency Controlled.
We are one of the accredited manufacturers and suppliers of Accoustic Enclosure and Sound Proofing in northern part of India under brand Name of "DDSTHA".
Revolutionary Breakthrough in Optimized Marine Design Introducing Turbo Technology from Dometic Environmental.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Advisor: Dr. Shangchao Lin
Thermag VII, Turin, Italy
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
FCI and FCX Range FCI and FCX Range.
FCI and FCX Range FCI and FCX Range.
FCI and FCX Range FCI and FCX Range.
Flip The Long House Let’s imagine the Long house example in Manual J has undergone a house flipping/energy savings update. The insulation was increased,
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
FBE03: Building Construction & Science
Liebert DSE High efficiency thermal management
Presentation transcript:

Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian Zigmond

Presentation Agenda 1. Introduction and Problem Background 2. Concept Generation and Selection 3. Concept Development and Evaluation 4. Cost Projections 5. Summary

Background The Whalen Co. HVAC manufacturer –hospitals, apartment complexes, hotels Wants to boost sales of vertical water source heat pump –by offering additional options

Mission In the allotted time and as economically as possible FPED will: 1. Eliminate standing water in Whalen’s vertical heat pump 2. Decrease unit’s noise level 3. Improve circulation in the two-room units

Customers and Main Wants Internal to Whalen Executive Production Sales Engineering External Consumer NCDA Affordability, improved circulation. Ease of fabrication / installation. Affordability, improved circulation. Improved circulation, ease of fabrication. Affordability, quiet Design process

Constraints Size and geometry of unit and enclosure Regulatory commission specifications (ARI, UL) Unit’s current performance

System Benchmarking Trane: Well insulated unit gives quiet performance, removable drain pan for easy maintenance. ClimateMaster: Removable chassis for easy maintenance, sound-suppressing baffles on intakes.

Functional Benchmarking Drain Pan sheet metal positive pitch Sound neoprene pads isolate insulate external baffles Two Room Draw return grilles sheet metal ducting

Metrics and Target Values Metric Cost of Materials Air Changes per Hour in adjacent room Number of Parts Fabrication Time Assembly Time Repair Time Decibel Level Footprint Change Target Value About $50 > /2 hours 2 hours 4 hours Less than Current Value 0

Prime Metrics Evaluated through SSD

Concept Generation Sound Designs diffusion ducting isolation insulation Drain Pan Designs sloped insert channel Two Room Air Draw Ducting above the fan below the coil adjacent to coil rotate coil above coil

Drain Pan Concept Selection Sloped Insert Disadvantages lengthy fabrication time difficult to install 4 additional parts (minimum)

Final Drain Pan Concept Channel Advantages 3 additional parts lower materials cost shorter fabrication time shorter assembly time

Sound Attenuation Concept Selection Diffusion Ducting Analysis flow rate =.189m 3 /s fan area =.0194m 2 the air velocity is v = Q/A = 9.75m/s non-turbulent flow  air flow is not generating noise non-turbulent flow  air flow is not generating noise

Final Sound Attenuation Concept Insulation double insulation of cabinet Isolation place neoprene between every metal to metal vibration point

Two Room Draw Concept Selection Rotate Coil changes footprint Above Fan difficult to maintain/repair Adjacent to Coil additional parts additional manufacturing costs minimal ducting area

Two Room Draw Concept Selection Duct underneath condenser coil Advantages fewer additional parts Disadvantages high assembly time changes foot print (required for significant flow)

Final Two Room Draw Concept Advantages no footprint change maximum ducting area easiest assembly

Overall Final Concept

Drain Pan Testing Procedure The Ideal Test Run unit for extended time and track condensation paths measure condensation amount

Drain Pan Testing Procedure Simulated Tests Pour water into the drain pan keeping the drain hole submerged at all times Measure the time it takes to drain a certain amount of water Mist water over coils with fan operating Results: average max flow rate of 1.51 GPM & vertical condensate flow

Two Room Draw Testing Procedure Procedure Place meter at center of duct Take three readings of air velocity, then average Calculate CFM and percentages of total air flow Trials New duct with deflector plate New duct with acoustical plate Original discharge with acoustical plate

Two Room Draw Test Results With deflector panel With acoustical panel

Sound Testing Procedure Procedure Obtain ambient baseline data Place decibel meter at selected locations Record three measurements at each point, then average Trials Insulate top of cabinet Insulate bottom of cabinet Isolate fan Isolate compressor

Sound Testing Results

Solution Satisfies Constraints and Metrics

Project Budget Allowable Budget = $5000  Expenditures  Visiting expenses$31.91  Model Materials$19.99  Prototype Materials  Sheet metal$25.00  Spray Adhesive$12.00  Tubing$1.00  Installation Materials$20.00 Total $109.90

Engineering Time Prototype Drawings 10 hours Fabrication 20 hours Installation 2 hours Testing Drain pan1 hour Sound6 hours Two room2 hours

Manufacturing Cost Projections Cost = Material + Manufacturing Time * Labor Manufacturing Time = Time to perform additional processes (shear, punch, etc.)

Drain Pan Manufacturing Projections Additional Processes fabricate inner channel solder channels cut hose pull T in riser Approximate Time 2 minutes 1 minutes 3 minutes

Sound Attenuation Projections Additional Processes cut neoprene cut insulation install insulation install neoprene Approximate Time 30 seconds 1 minutes 1 minute

Two Room Draw Projections Additional Processes fabricate duct attach duct notch hole in inner panel cut and attach neoprene to inner panel Approximate Time 4 minutes 2 minutes 30 seconds 1 minute

Summary In conclusion, FPED has created a design that: 1. Eliminates standing water in Whalen’s vertical heat pump 2. Decreases the unit’s noise level 3. Improves circulation in the two-room units by drawing from both rooms