CITRIS Building Startup Space Committees Carlo Séquin, Gary Baldwin, Keat Saw, Scott Shackleton Design of the “Macro-Lab” February 22, 2006
CITRIS Building Facilities Design 2 West View (Floors 2-7 Visible)
CITRIS Building Facilities Design 3 Looking South on “Engineering Esplanade”
CITRIS Building Facilities Design 4 CyberCafe, West Facade
CITRIS Building Facilities Design 5 A Few Typical Spaces Small conference room Signature conference room (sixth floor) Entrance to main auditorium Entrance corridor
CITRIS Building Facilities Design 6 College Entrance Level 3
CITRIS Building Facilities Design 7 Floorplan Level 3 to CEE Dept. (Davis Hall)
CITRIS Building Facilities Design 8 Main Auditorium (third floor)
CITRIS Building Facilities Design 9 Level 3M: NanoFab (Lower Level)
CITRIS Building Facilities Design 10 Level 3M: NanoFab (Lower Level)
CITRIS Building Facilities Design 11 Level 7
CITRIS Building Facilities Design 12 Floorplan Level 7
CITRIS Building Facilities Design 13 Level 6
CITRIS Building Facilities Design 14 Floorplan Level 6 to CEE Dept. (Davis Hall) to Cory Hall
CITRIS Building Facilities Design 15 Level 5 Entrance to Micro/Nano-Lab
CITRIS Building Facilities Design 16 Floorplan Level 5 Entrance to Micro/Nano-Lab
CITRIS Building Facilities Design 17 Level 4
CITRIS Building Facilities Design 18 Floorplan Level 4
CITRIS Building Facilities Design 19 Level 2
CITRIS Building Facilities Design 20 Floorplan Level 2
CITRIS Building Facilities Design 21 Level 1 (Basement)
CITRIS Building Facilities Design 22 Floorplan Level 1 (Basement)
CITRIS Building Facilities Design 23 Approximate Schedule Jan 3 - Jan 31, 2006 Bid Period Feb 27, 2006 Contract Award Mar 15, 2006 Construction Start Spring, 2008 Construction Completion Summer, 2008Move In
CITRIS Building Facilities Design 24 MacroLab-Level 1 45x68 44x45 26x66 21x70
CITRIS Building Facilities Design 25 MacroLab-Level 2 75x21 32x15
CITRIS Building Facilities Design 26 Role of Design Committees Help us to make the CITRIS building truly functional Think through what should comprise the basic infrastructure Make sure we didn’t miss anything in the infrastructure design Help develop usage guidelines for open, collaborative research spaces Fit-out of open office spaces for cubicle furniture Furniture plan for key conference rooms Specify needs for facilities fit-out for computer rooms and collaboratories Define A/V, networking, broadcasting, and other infrastructure Specify needs for Distance Learning Center Help with security guidelines (e.g., space accessibility to students after 5 PM ) Content for open spaces: entrance, café, tech “museum”
CITRIS Building Facilities Design 27 A Few Guidelines Successful functioning of the building heavily depends on works of these committees CITRIS goals and mission embrace highly multi-disciplinary, collaborative research CITRIS Headquarters serves many colleges, departments, and four UC campuses Plan for general occupancy model of temporary space - - for the life of projects/programs only The basic structure, both interior and exterior, is designed and fixed. We want to minimize any changes: they’re costly. Generally, throughout the building, design for consistency in every aspect: cubicles, furniture, networking, telephony, displays, amenities, etc. Specific goals and objectives for each committee will be distributed during the first meeting of each committee (after 1/1/06). Meet monthly, for the first few months (approximately through Spring ’06 term). Following that, probably quarterly update. Report quarterly Plenary session twice each semester to review checkpoints Have tentative design documents ready by early summer 2006 Dedicated webspace on for document sharing, diagrams, updates, etc. To obtain access and instructions, go to:
CITRIS Building Facilities Design 28 Committee Members NanoFab Suite (fifth floor) Bill Flounders, Costas Spanos, Arun Majumdar, Luke Lee, Eicke Weber, Per Peterson, Gary Baldwin (chair) Macrolab Suite (Rooms 200, 201, 244 and portions of 140, 145, 148) Alice Agogino (chair), John Canny, Kara Nelson, Ruzena Bajcsy, Karl Hedrick Basement Laboratory (Room 145) Kathy Yelick, Eric Brewer, Stephen Brenner, Andrew Packard, Mark Hansen, Gary Baldwin (chair) Technology Museum Kris Pister, Homayoun Kazerooni, Stephen Connolly, Yuri Suzuki, Jasmina Vujic, Ken Goldberg, Gary Baldwin (chair) Classrooms 240, 250, 254 and Auditorium-related (301, 310, 306, 311, 312) Anthony St. George, Pam Atkinson (chair), Lisa Pruitt, Dan Garcia, Paul Wright, Raja Sengupta Computer Server Room (131) Eric Brewer, Kathy Yelick, Jasmina Vujic, Hua Pei Chen, Gary Baldwin (chair) Cyber Café Dan Garcia, Alex Bayen, Kimmen Sjolander, Jose Carmena, Roberto Horowitz, Ellen Zeng (HKN), James Li (TBP), May Chu (SWE) Members-at-large: Richard Newton, Gary Baldwin, Carlo Sequin, Scott Shakleton, Keat Saw